slide 1: AVI POP UP WASTE
Disclaimer: Products in this specification manual must by regulation be installed by licensed and registered trade people. The manufacturer/distributor reserves the right to vary specifications or delete
models from their range without prior notification. Dimensions are nominal measurements only. Dimensions and set-outs listed are correct at time of publication however the manufacturer/distributor
takes no responsibility for printing errors. All ABI Products are designed in Australia. Copyright ABI Interiors 2019. WWW.ABIINTERIORS.COM.AU
SPECIFICATIONS
RECOMMENDED USE
INSTALLATION
OVERFLOW
WARRANTY
No
Structure: 10 years | Finish: 5 years
Domestic
Suits 40mm Trap
5-60
M6
45
G1
1
2
Ø63
40mm
suits 40mm trap
1
2 3
Disassemble the components of
the pop-up waste.
Place the lower section of the pop-up
with silicon washer underneath the
basin and align the the two components.
Unscrew brass mechanism to fix with
the provided
Fix and tighten the mechanism component
into the top and screw on the pop-up lid
Note: This product must be installed by a licensed trade
This is a general installation guide - there are many factors that are
involved that can alter the installation method.
INSTALLATION GUIDE
Plumb into connection.
Test by running water through
the waste and pushing plug up
and down.
2
Place the top section along with
threaded bolt and white washer
into the basin hole