Continuing Education Session 1 - (Part 3 of 6)

Views:
 
Category: Education
     
 

Presentation Description

No description available.

Comments

Presentation Transcript

Slide 1: 

Welcome to Cape Cod Plumbing School’s 6 Hour Continuing Education Course SESSION 1! PVC & ABS Please read the following instructions to fully understand how to take the course: To make the presentation full screen, click the square icon on the bottom right corner just outside this presentation box. To go back to a previous slide Click on this side of the screen To go to the next slide Click on this side of the screen Audio for each slide will AUTOMATICALLY PLAY And CANNOT be paused. If you need to hear it again, simply go to the next slide, then go back to the slide you wanted to hear again. Each fill in the blank question on the 2 workbooks has a page number next to it. That number corresponds to the PG # at the top right corner of each slide. Look at the PG # on the slide if you lose your place on the workbook. When you are finished with this part of the course, a final slide will display a link. Click the link to move on to the next part of the course. Fullscreen Button PG #

Slide 2: 

PVC AND ABS PLASTIC APPROVED USE AST. LIVING RESIDENTIAL HOTEL & MOTEL INNS & CONDOS NOT APPROVED USE ANY COMMERCIAL AREA NOT MORE THAN 10 STORIES SUPPORTS a) 3/4'' BEARING HANGERS b) HORIZONTAL 1 1/2'' 3' 2'' & OVER 4' c) VERTICAL EVERY FLOOR NOT MORE THAN 10' PG. 127 10.06 O 1 & 2 PG. 129 10.06 14 A PG 17

Slide 3: 

LIMITED USE BEAUTY SALONS BARBER SHOPS MANICURE SALONS PEDICURE SALONS PHOTO LABS ALCOHOL & SODA CONDITIONS a) PIPING SHALL CONNECT TO BRANCH OR MAIN DRAIN b) LABELED READING LIMITED USE c) VENTS 6'' ABOVE FLOOD LEVEL RIM OF FIXTURES AND TRANSITIONED INTO APPROVED COMMERCIAL MATERIALS PG. 128 10.06 O 3 B PG. 128 10.06 C PG 18

Slide 4: 

PUBLIC TOILET ROOM PUBLIC TOILET ROOM 5 BARBER SHOP SINKS LIMITED USE WASTE 7 STORY CONDO P V C C I C I PG 19 FIG 1 B D

Slide 5: 

EXPANSION a) RATE 3/8'' PER 10' PER 100 DEG. TEMP. CHANGE b) ALLOWANCE 1/2'' PER 10' LENGTH c) EXPANSION JOINTS VERTICAL EVERY OTHER FLOOR d) EXPANSION JOINTS HORIZONTAL RUNS OVER 20' e) EXPANSION JOINTS NOT REQUIRED ON ABS OR UNDERGROUND FIRE WALLS a) ENCASED IN TIGHT FITTING SLEEVE b) 20'' ON EITHER SIDE OF WALL, CEILING OR FLOOR c) SPACE BETWEEN PIPE & SLEEVE SEALED PG. 129 10.06 15 PG. 130 20 PG 20

Slide 6: 

SLEEVING P V C PIPE PENETRATING CONCRETE FLOOR SLABS OR WALLS SHALL BE SLEEVED WITH A 1'' SPACE BETWEEN THE PIPE AND THE SLEEVE P V C AND A B S SHALL NOT BE SOLVENT WELDED TOGETHER IF A CONNECTION IS REQUIRED IT MAY BE PERMITTED WITH A TRANSITION FITTING P V C OR A B S PASSING THROUGH EXTERIOR FOUNDATION WALLS SHALL BE WATER TIGHT PG. 130 10.06 18 A PG. 100 10.05 11 PG. 131 10.06 5 B PG. 131 10.06 5 B PG 21

Slide 7: 

AFTER GLUING A PVC JOINT YOU SHOULD WAIT 2 MIN. BEFORE HANDLING IT WHEN LEAD IS USED TO JOIN P V C PLASTIC TO CI SOIL PIPE WITH HUBS THE LEAD SHALL COOL 4 MIN. BEFORE CAULKING P V C PIPING PASSING THROUGH FIRE WALLS IN ONE OR TWO CAR GARAGES LOCATED BELOW A DWELLING UNIT SHALL NOT BE REQUIRED TO BE SLEEVED ABS PLASTIC PIPING SHALL BE BLACK IN COLOR PG. 129 10.06 VII PG. 130 20 D PG. 130 10.06 B PG. 131 10.06 5A PG 22

Slide 8: 

3 HARMFUL EFFECTS THAT COULD BE LISTED ON THE LABEL ON A PVC CEMENT CAN DO NOT USE IN AN UNVENTILATED SPACE EXTREMELY FLAMMABLE VAPORS HARMFUL TO EYES AND SKIN PG. 178 10.06 X PG 23

Slide 9: 

PVC PIPE AND FITTINGS MAY BE USED AS INDIRECT WASTE PIPING FOR DIALYSIS EQUIPMENT IN MEDICAL BUILDINGS PVC SCHEDULE 40 PERFORATED PIPE MAY BE USED FOR SUBSOIL DRAINAGE IN COMMERCIAL BUILDINGS DO NOT THREAD PVC PIPE USE PROPER PVC MALE OR FEMALE THREADED ADAPTORS FOR TRANSITIONING PG. 128 10.O6 4 PG. 128 10.06 5 PG. 129 10.06 B I PG 24

Slide 10: 

TRENCH INSTALLATIONS UNIFORMLY COMPACTED TRENCH USING SAND OR OTHER GRANULAR MAT – ERIAL COMPACT AND BACKFILL AROUND THE PIPE AND 6 IN. ABOVE THE PIPE c) NO LARGE STONES DROPPED ON TOP OF THE PIPE d) THE LICENSED PLUMBER SHALL BE RES – PONSIBLE FOR THE ABOVE PG. 130 10.06 19 PG 25

Slide 11: 

OFFICE 5' STORM DRAIN 3'' 2'' 3'' 2'' LAV LAV X ROOF GARDEN 8' INC. 1 SIZE P V C X W M 2'' 11/4'' 11/2'' BAR SK NO PERM. TUB 2 dia PG 26 FIG. 1 FIG. 2 FIG. 3 FIG. 4

Slide 12: 

PG 27 A FIG. 2

Slide 13: 

PG 28

Slide 14: 

W M 2 DIA. PG 29 A FIG. I B

Slide 15: 

PG 30 A B SANITARY T EXPANSION JOINT FIG. 2

Slide 16: 

x PG 31 FIG 3 BUILDING DRAIN ENTERING A BUILDING BELOW A BASEMENT SLAB

Slide 17: 

PG 32

Slide 18: 

PG 33

Slide 19: 

PG 34

Slide 20: 

PG 35

Slide 21: 

You have completed this part of the course. The next part is Cross Connections. On your computer keyboard, please press the “Esc” key located at the top left corner. This will take you out of fullscreen mode. This is required if you want to continue to the next part of the course. Once you have pressed the “Esc” key and are out of fullscreen mode, please click the link below to continue: Continuing Education Session 1 - Cross Connections

authorStream Live Help