Slide 1: 

Welcome to Cape Cod Plumbing School’s 6 Hour Continuing Education Course SESSION 1! CSST Please read the following instructions to fully understand how to take the course: To make the presentation full screen, click the square icon on the bottom right corner just outside this presentation box. To go back to a previous slide Click on this side of the screen To go to the next slide Click on this side of the screen Audio for each slide will AUTOMATICALLY PLAY And CANNOT be paused. If you need to hear it again, simply go to the next slide, then go back to the slide you wanted to hear again. Each fill in the blank question on the 2 workbooks has a page number next to it. That number corresponds to the PG # at the top right corner of each slide. Look at the PG # on the slide if you lose your place on the workbook. When you are finished with this part of the course, a final slide will display a link. Click the link to move on to the next part of the course. Fullscreen Button PG #

Slide 2: 

CORRUGATED STAINLESS STEEL C S S T 1) CONCEALED C S S T a) CONNECTIONS MADE WITH FITTINGS LISTED FOR CONCEALED SPACES b) MALLEABLE FITTINGS MAY BE USED IN A CONCEALED LOCATION c) REPAIRS IN CONCEALED LOCATIONS SHALL BE MADE WITH FITTINGS FROM THE MANUFACTURER d) INSTALLATION OF AN ACCESS PANEL REQUIRED AT THE POINT OF REPAIR PG. 34 5.03 1 A PG. 34 5.03 B 2 PG. 34 5.03 C I . PG. 34 5.03 C 2 PG 23

Slide 3: 

2 C S S T SHALL NOT BE CONNECTED TO AN EXTERIOR GAS METER 3 CSST MUST BE SLEEVED WHEN PASSING THROUGH A METAL OR CONCRETE DECK a) SCHEDULE 40 BLACK OR GALVANIZED STEEL PIPE b) 6'' ABOVE AND BELOW THE DECK 4 ONLY MANIFOLDS SUPPLIED AND LISTED BY THE MANUFACTURER MAY BE CONCEALED 5 FIRE PLACE LOGS SHALL BE TERMINATED WITH A TERMINATION FITTING AT THE ENTRANCE OF A MASONRY FIRE BOX PG 34 5.03 E 1 PG. 34 5.03 F 1 PG. 34 5.03 G PG. 34 5.03 H 1 PG 24

Slide 4: 

6 FIXED APPLIANCE CONNECTIONS a) TUBING IS SECURELY ATTACHED TO THE BUILDING b) THE TUBING SHALL NOT BE RUN MORE THAN 30'' WITHOUT BEING SUPPORTED c) TUBING SHALL TERMINATE WITH A PROPER FITTING AND HAVE A GAS COCK 7 CSST TUBING UNDERGROUND a) INSTALLED IN A NON METALLIC SLEEVE 1/2'' LARGER b) SLEEVE SHALL BE SEALED c) TAPE MARKING SYSTEMS SHALL BE IN PLACE NOT MORE THAN 6'' BELOW GRADE d) THE MINIMUM DEPTH FOR CSST TUBING IS 18'' e) THE MINIMUM SIZE TUBING IS 3/4'' PG. 34 5.03 I PG. 34 5.03 J PG 25

Slide 5: 

8 CSST TUBING SHALL NOT BE USED AS A FLEXIBLE CONNECTOR 9 THE MAXIMUM OPERATING PRESSURE FOR A CSST SYSTEM USED FOR NATURAL GAS IS 1/2 PSI 10 TESTING REQUIREMENTS a) TESTED AND INSPECTED AT 3 PSI b) TESTED BEFORE PIPE IS CONNECTED TO APPL. 11 TAGS a) AFFIXED TO THE GAS METER ACKNOWLEDGING SECOND TEST SIGNED BY THE LICENSED INSTALLER PG. 35 5.03 K PG. 35 5.03 L PG. 35 5.03 N 1 PG. 35 5.03 N 3 PG 26

Slide 6: 

12 USE NON-CORROSIVE LEAK DETECTOR SOAPS 13 CSST TUBING ON ROOFS a) SUPPORTED THE FULL LENGTH b) ATTACHED TO SUPPORTS EVERY 6' c)CSST TUBING 11/2'' AND 2'' MAY BE SUPPORTED ON BLOCKS 48'' APART ELECTRICAL BONDING / GROUNDING a) BLACK PIPE COMPONENT OR STUBOUT b) GAS MANIFOLD c) CSST FITTING PG. 35 5.03 O PG. 35 5.03 Q GAS TITE PG 27

Slide 7: 

I4) DONT’S OF CSST SYSTEMS INSTALL CSST FITTINGS FROM ONE MANUFACTURER’S SYSTEM DIRECTLY INTO THE TUBING FROM AN- OTHER SYSTEM DIRECTLY EMBED CSST IN CONCRETE WITHOUT SLEEVING DIRECTLY BURY TUBING UNDERGROUND WITHOUT SLEEVING LEAVE UNPROTECTED WHEN INSTALLED IN CON- CEALED LOCATIONS & WITHIN 3” OF A NAILING SURFACE GAS TITE GAS TITE GAS TITE GAS TITE PG 28 DO NOT….

Slide 8: 

DONT’S OF CSST SYSTEMS CONTINUED CONNECT CSST DIRECTLY TO AN EXTERIOR GAS METER INSTALL CSST DOWNSTREAM OF AN APPLIANCE SHUT-OFF VALVE AS A FLEXIBLE APPLIANCE CONNECTOR OPERATE CSST SYSTEM ABOVE ½ PSI WITHOUT APPROVAL LEAVE CSST UNSUPPORTED WHEN CONNECTED TO A FIXED APPLIANCE IF THE DISTANCE IS GREATER THAN 30’’ GAS TITE PG 29 DO NOT….

Slide 9: 

CSST SHALL NOT BE DIRECTLY CONNECTED TO A MOVEABLE GAS APPLIANCE. USE A FLEXIBLE CONNECTOR FOR DRYERS AND RANGES DENTED TUBING SHOULD BE REPLACED IF ITS OVERALL CRUSH DEPTH IS GREATER THAN 1/3 OF THE TUBING DIAMETER HOLES DRILLED IN PARTITIONS SHALL BE 1/2'' LARGER THAN THE TUBING INSIDE BENDING RADIUS 3'' GAS TITE PG 30

Slide 10: 

40 000 120 000 75 000 8' 10' 12' 6' 6' 6' A B C D E M MOST REMOTE OUTLET 38' = 40' COLUMN TUBING E H D SIZE 13 3/8'' 17 CU. FT 18 1/2'' 47 CU. FT 23 3/4'' 83 CU. FT 31 1'' 206 CU. FT 37 1 1/4'' 317 CU. FT. 40' COL. C = 75 C F H = 3/4'' E = 120 C F H = 1'' B = 195 C F H = 1'' D = 40 C F H = 1/2'' A = 235 C F H = 1 1/4'' E H D EQUIVALENT HYDRAULIC DIAMETER 2' PG 31

Slide 11: 

80 000 36 000 52 000 28 000 25 000 TOTAL 221 BTU LEN = 70' M TABLE 7 - 7 A = 221 CFH 70 FT. = 1 IN B = 80 CFH 45 FT. + 15 FT. = 60 FT. = 1/2 IN C = 36 CFH 45 FT. + 10 FT. = 55 FT. = 1/2 IN. D = 52 CFH 45 FT. + 20 FT. = 65 FT. 1/2 IN. E = 28 + 25 = 53 CFH 45 FT. + 25 FT. = 70 FT. = 1/2 IN. 3’ 8’ E 2’ 7’ F 5’ G 5’ 5’ D 7’ 8’ C 10’ 5’ B 4’ 6’ A 45’ 3/8’’ = 13 EHD 1/2’’ = 18 EHD 3/4’’ = 23 EHD 1’’ = 31 EHD PG 32 F = 28 CFH 45’ + 25’ = 70’ = 3/8 IN.

Slide 12: 

FACTORY MANIFOLD TERMINATION BOX STRIKER PLATE PG 33

Slide 13: 

X FIXED APPLIANCE CONNECTION PG 34

Slide 14: 

PG 35

Slide 15: 

PG 36

Slide 16: 

PG 37

Slide 17: 

PG 38

Slide 18: 

PG 39

Slide 19: 

PG 40

Slide 20: 

PG 41

Slide 21: 

PG 42

Slide 22: 

PG 43

Slide 23: 

PG 44

Slide 24: 

PG 45 MOVEABLE GAS APPLIANCE REQUIRES A FLEXIBLE CONNECTOR

Slide 25: 

PG 46

Slide 26: 

PG 47 MANUFACTURER’S REPAIR FITTING

Slide 27: 

PG 48 CSST SHALL TERMINATE PRIOR TO ENTERING A FIRE BOX

Slide 28: 

PG 49

Slide 29: 

PG 50

Slide 30: 

PG 51

Slide 31: 

PG 52

Slide 32: 

PG 53

Slide 33: 

PG 54

Slide 34: 

2nd TEST PG 55

Slide 35: 

CONGRATULATIONS! You have completed the SESSION 1 course! Now it is time to take 2 tests: 1st test: Continuing Education Session 1 - Plumbing 2nd test: Continuing Education Session 1 - Gas On your computer keyboard, please press the “Esc” key located at the top left corner. This will take you out of fullscreen mode. This is required if you want to continue to take the tests. Once you have pressed the “Esc” key and are out of fullscreen mode, please click the two links below: Good Luck! Continuing Education Session 1 - PLUMBING TEST Continuing Education Session 1 - GAS TEST