Power-point Presentation On Scope management plan

Views:
 
Category: Education
     
 

Presentation Description

Scope management refers to the process of handling the project management related activities which assists corporation to accomplish the task related to operation. Read this ppt sample on scope management from Instant Assignment Help Australia.

Comments

Presentation Transcript

slide 1:

Supreme Assignment Quality Services from Aussie Writers

slide 2:

Power-point Presentation On Scope management plan

slide 3:

Scope statement  The scope of current project is to design new food package meeting the requirement of customers  It will have three dishes  Provided as per the requirement of customers

slide 4:

Stating the need  Collecting the information  Meeting the specific needs of the customers  Accumulating the resources

slide 5:

Supreme Assignment Quality Services from Aussie Writers

slide 6:

Defining the scope  The scope of project is to increase the sales turnover through introduction of new food package  Product analysis has been used by Tesco to define the scope  It was found that customers in need of ready-made package which can be delivered in less time

slide 7:

Creating the WBS  The important depart is of operation  Research team will guide operation department  Production team work after the operation  Sales team reconnect with the research and development for providing customer feedback

slide 8:

Supreme Assignment Quality Services from Aussie Writers

slide 9:

Verifying scope  The scope will be verified in accordance with feedback of the customers  Rate of profitability  Competitive edge of the business  It will be known on the basis of making comparison

slide 10:

Control scope  The control phase is implemented through monitoring the actual performance  Reduced the gap between actual and standard results  All department will work on the gap exist between results

slide 11:

Supreme Assignment Quality Services from Aussie Writers

slide 12:

Cont...  Customers feedback will be incorporated  Profitability and sales turnover ratio will be measured against the standards  Workforce will be provided training the bridge the gap

slide 13:

Supreme Assignment Quality Services from Aussie Writers

slide 14:

References Rees-Caldwell K. and Pinnington A.H. 2013. National culture differences in project management: Comparing British and Arab project managers perceptions of different planning areas. International Journal of Project Management. 312. pp.212-227. Schwalbe K. 2015. Information technology project management. Cengage Learning. Snyder C. S. 2014. A Guide to the Project Management Body of Knowledge: PMBOK ® Guide. Project Management Institute.

slide 15:

Thank You

authorStream Live Help