XFEL is organized in Work Packets (WP’s):
XFEL is organized in Work Packets (WP’s) The Power Coupler has interfaces with the following WP’s:
WP1, RF Systems
WP3 Acc. Modules
WP4 SC Cavities
WP8 Cold Vacuum
WP9 Strings
WP23 Control Systems
Other interfaces:
Other interfaces Cleaning areas, ultra pure water systems
Clean rooms
Baking stations
Assembly tooling
Interlocks
Also the power coupler has to be transferred to WP9 and WP3 for assembly of cold and warm part
Goal of this two days work:
Goal of this two days work Name all interfaces (with the help of Serge‘s list)
Define the interfaces
Define the responsibilities at the interfaces
Define the procedures and responsibilities of the coupler transfer from one WP to the next WP
Name open question
Schedule 1st:
Schedule 1st
Schedule 2nd:
Schedule 2nd
Schedule 3rd:
Schedule 3rd
Schedule 4th:
Schedule 4th
Conclusion:
Conclusion We need the results from this workshop
We have to be as precise as possible
Serge and me will summarize the results from this workshop and will distribute them to the different WP’s.
We will report to the XFEL In-kind Contribution Meeting of the Cold Linac at DESY on November 12/13
Slide10:
Thanks for coming and lets start