Presentation Transcript
Total Quality Management :Total Quality Management Session 2
Kaizen – Continuous Improvement :Standardise an operation
Measure the standardise operation
Gauge measurements against requirements
Innovate to meet requirements and increase productivity
Standardise the new, improved operations
Continue ad infinitium Kaizen – Continuous Improvement
Kaizen :Kaizen
7 Basic Quality Tools :Control Charts
Histogram
Pareto Chart
Check Sheet
Cause & Effect Diagram
Flowchart
Scatter Diagram 7 Basic Quality Tools
Statistical Process Control :An effective method of monitoring processes through control charts
Monitors processes and variations
Helps reduce waste
Identification of bottleneck, wait times
Reduction in time required to produce Statistical Process Control
Control Chart or Shewhart Chart :Tool used to determine whether a manufacturing or business process is in the state of statistical control or not
Represents measurements of quality characteristics in samples taken periodically
A mean is calculated from the data and displayed
Tolerance limits Control Chart or Shewhart Chart
Control Charts :Control Charts
Types of Control Charts :Variable Control Charts
Attribute Control Charts Types of Control Charts
Types of Control Charts :R Chart
S Chart
p-chart
np-chart
c-chart
u-chart
CUSUM Chart (Cumulative Sum Chart)
Time Series Model
Regression Control Types of Control Charts
Which Control Chart to use? :Which Control Chart to use?
Rational Subgroup :It is the method for determining the size and frequency so that each sample represents a point in time or space
It is a way to collect data that best represents a process state that is unknown Rational Subgroup
R Chart :chart tracks the subgroup average from the process
R chart tracks the range within each subgroup
Both the charts give the process level and process variation at same time as well as presence of special causes R Chart
Formulae :Formulae
Example :Example
X-Bar Sigma Chart :Similar to X-bar and R chart but used when subgroup size is 11 or more
It uses standard deviation instead of range
Used to monitor the effects of process improvement theories X-Bar Sigma Chart
P-Chart :Is a control chart for attribute of data
Measures the proportion detective items in a subgroup P-Chart
P-Chart :P-Chart
NP-Chart :Similar to P-chart, with two differences
All subgroup size must be same
Is used to track attribute data in terms of numbers rather than proportion NP-Chart
C-Chart :Is used to track attribute data in terms of counts per subgroup
All subgroups must be the same size C-Chart
Histogram :Graphically summarises and displays the distribution of a process or data set Histogram
Pareto Chart :It is used to graphically summarise and display the relative importance of the differences between groups of data
It has two vertical axis
Left-side vertical axis is labelled frequency
Right-side of the vertical axis is the cumulative frequency
It is used to represent the most common occurring defect, most common source of defects, most frequent reasons for customer complaints, etc. Pareto Chart
Pareto Chart :Pareto Chart
Check Sheet :It is used to collect data in real-time and at the location where data is generated
Types of check sheets
Classification – A trait such as a defect or a failure mode must be classified into a category
Location – The physical location of a trait is indicated on a picture of a part or item being evaluated
Frequency – The presence or absence of trait is indicated along with number of occurrences
Measurement scale – Measurements are indicated by checking on an appropriate interval on a pre-divided measurement scale
Check-list – Items are listed so that as each is accomplished, it is indicated by a check/tick-mark Check Sheet
Check Sheet :Check Sheet
Flowchart :Graphical representation of a process, depicting inputs, outputs and units of activity
Represents the entire process at a high or detailed level of observation, allowing analysis and optimization of workflow Flowchart
Scatter Diagram or Scatter Plot :Reveals the relationship of association between two variables
Answers the following questions
Are two variables related?
If yes, linearly or non-linearly Scatter Diagram or Scatter Plot
Software Quality :Capability Maturity Model
Capability Maturity Model Integration
IDEAL Software Quality
Software Quality :Types of defects in software
Logical error
Incorrectly assigned variable
Typing errors Software Quality
Capability Maturity Model :It is industry specific quality model for software development
Focuses on “Zero-Defect” software development
Software Development Life Cycle (SDLC) provides a structured way to develop an application and helps in early decision making
SDLC helps reduce the total cost of software development Capability Maturity Model
SDLC - Stages :Create and evaluate concept
Analysis to define requirements
Define architecture
Design tests
Specify computer program
Write and revise computer program, its documentation and instruction
Put the program together, with inspection and testing
For published software, release a beta test version
Final release and customer support SDLC - Stages
Software Inspection :Software Inspection
CMM :CMM
5 Levels of CMM :Initial
Each person learns and does the job any way he/she can. The organisation relies on heroes
Repeatable
Departments have their acts together, establish, procedures, and are following them & keeping them up to date. But methods are different in different places for no good reason
Defined
The whole organisation has standard methods for standard activities, and departments have unique procedures where they are needed. This is centrally coordinated
Managed
The organisation eliminates defects by quality management and constantly works in order to make things better
Optimising
Organisation uses, sustains and continuously improves best practices 5 Levels of CMM
Key Process Areas of CMM :Key Process Areas of CMM
CMMI – Adding Flexibility :It is the integration of various CMMs
CMMI is a framework for business process improvement
It is a suite of products used for process improvements
It has
Models
Appraisal methods
Training Courses CMMI – Adding Flexibility
Dependence of Software Process Evaluation and Standards :Dependence of Software Process Evaluation and Standards
CMMI :CMMI
CMMI Representation :Continuous
User focuses on the specific processes that are considered important for organisation’s immediate business objectives
Staged
Provides a standard sequence of improvements and can serve as a basis for comparing the maturity level of different projects and organisation
It provides easy migration from the SW-CMM to CMMI CMMI Representation
CMMI Models :CMMI best practices – documented are called CMMI models
CMMI models cover the following areas
Development
Acquisition
CMMI for Development (CMMI-DEV)
CMMI for Acquisition (CMMI-ACQ)
CMMI for Services (CMMI-SVC) CMMI Models
Ideal Model :Is a usable, understandable approach to continuous improvement by outlining the steps necessary to establish a successful improvement program
Consists of 5 stages
I – Initiating
Laying the ground work for a successful improvement effort
D – Diagnostic
Determining where you are relative to where you want to be
E – Establishing
Planning the specifics of how will you reach your destination
A – Acting
Doing the work according to the plan
L - Learning
Learning from the experience and improving the ability to adopt new technologies in future Ideal Model
The IDEAL Model :The IDEAL Model
ISO 9000 :ISO 9000 is a family of standards for quality management systems
ISO 9000:2000
QMS –Fundamentals and Vocabulary
ISO 9001:2000
QMS – Requirements
ISO 9004:2000
QMS-Guidelines for performance improvements ISO 9000
ISO 9001 :Requirements
Scope
Normative Reference
Terms and definition
Quality management system
Management responsibility
Resource management
Product realisation
Measurement, analysis and improvement ISO 9001
ISO 9001 :ISO 9001
Documentation Levels :Documentation Levels
Summary of ISO 9000 :Quality policy is a formal statement from management, closely linked to business and to customers needs
Quality policy is understood at all levels and by all employees
Documentation and audits are conducted periodically
Records should show how and where raw materials and products are processed to allow products and problems to be traced to the source Summary of ISO 9000
Summary of ISO 9000 :Map all processes, monitor & control them
Monitoring, measurement and analysis tools must be properly maintained and calibrated
Determine customer requirements and create systems for communicating with customer
Perform periodic internal audits and meetings Summary of ISO 9000
Driving or Being Driven??? :Driving or Being Driven???
Six Sigma :Its a business management strategy developed by Motorola
It seeks to identify and remove the causes of defects in manufacturing or business process Six Sigma
Six Sigma :One Sigma = 690,000 DPMO = 31% efficiency
Two Sigma = 308,000 DPMO = 69.2% efficiency
Three Sigma = 66,800 DPMO = 93.32% efficiency
Four Sigma = 6,210 DPMO = 99.379% efficiency
Five Sigma = 230 DPMO = 99.977% efficiency
Six Sigma = 3.4 DPMO = 99.9997% efficiency Six Sigma
Six Sigma - Implementation :Six Sigma - Implementation
DMAIC – Improve Existing Business :D -Define high level project goals and the current process
M-Measure key aspects of the current process and collect relevant data
A-Analyse the data to verify cause and effect relationships. Determine what the relationships are and attempt to ensure that all the factors have been considered
I-Improve or optimise the process based on data analysis using techniques like design of experiments
C-Control to ensure that any deviations from target are corrected before they result in defects DMAIC – Improve Existing Business
DMADV – for New Products/Process Design :D-Define design goals that are consistent with customer demands and the enterprise strategy
M-Measure and identify characteristics that are critical to quality (CTQ), product capabilities, production process capability and risks
A-Analyse to develop and design alternatives, create high level design and evaluate design capability to select the best design
D-Design details, optimise the design and plan for design verification
V-Verify the design, setup pilot runs, implement the production process and hand it over to process owners DMADV – for New Products/Process Design
Thank You :Thank You puneit.singh@gmail.com
9350832020
9953324595
http://www.scridb.com/puneit