logging in or signing up Material-Management-Brainwave-Applications preethisudha Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 87 Category: Product Traini.. License: All Rights Reserved Like it (0) Dislike it (0) Added: December 06, 2011 This Presentation is Public Favorites: 0 Presentation Description Brainwave material management system is a complete end to end system for managing your material and inventory. It saves time, effort and reduces production costs with its dynamic information flow. Comments Posting comment... Premium member Presentation Transcript PowerPoint Presentation: Material Management System Brainwave Applications http://www.brainwavelive.com/ Date : 05.04.2011 A complete end to end system for managing your material and inventory from Brainwave ApplicationsPowerPoint Presentation: MATERIAL MANAGEMENT SYSTEM A complete end to end system for managing your material and inventory. It saves time, effort and reduces production costs with its dynamic information flow. Key Components Purchase Management Material Receipts & Issues Quality Management Inventory ManagementPowerPoint Presentation: Key Features Indent Requisitions Purchase Indents Purchase Orders BOM (Bill of Material) PURCHASE MANAGEMENTPowerPoint Presentation: BOM creation based on the requirement and QA specifications. Creation of indent requisitions, purchase indents and PO by department, requisition type and cost center with real time status tracking. Provision to raise multiple purchase indents against single indent requisition or single indent against multiple pending requisitions. Material price comparison along with procurement history. Auto updating / closure of indent requisition, purchase indents and PO. Key Benefits PURCHASE MANAGEMENTPowerPoint Presentation: Key Features Material Information Slip(MIS) On-line Consignment Approvals Material Receipt Note(MRN) Material Rejections Issue Vouchers Issue Returns Vouchers RC/NRC Goods Return Backward Note(GRBN) MATERIAL RECEIPTS & ISSUESPowerPoint Presentation: Online consignment approvals with respect to quality and PO. Real time status tracking of arrived consignment. Acceptance of material against single or multiple purchase order. Provision to accept the material against PO or indents. Regulating the flow of information based on the arrived item. System generated material rejections and outward material gate pass. Provision to issue partial quantities of requested quantities. Key Benefits MATERIAL RECEIPTS & ISSUESPowerPoint Presentation: Key Features Parameter Master Specification Master Brand Master Compound Code Master Product master Online Consignment quality approvals QUALITY MANAGEMENTPowerPoint Presentation: Integrated masters helps in generating BOM Defining specifications of materials and processes. System generated test reports and rejection reports. Item based retrieval of parameters with specs helps in quality approvals. Auto determination of the requirement of quality approvals of arrived item. Key Benefits QUALITY MANAGEMENTPowerPoint Presentation: Stocks reports for selected period. Display of real time stocks at transactions. Auto incremented item codes based on the material types. Provision to check last transactions performed of any given item. Auto updating of stocks and masters with respect to receipts and issues. Formulated minimum and maximum stocks along with ROL and ROQ. Key Benefits INVENTORY MANAGEMENTPowerPoint Presentation: Daily/periodical reports of both posted and un-posted transactions with status tracking Master reports Stock reports Department wise/Purchase type/Cost center wise reports of Indents/Issue Requisitions, Purchase indents, Purchase Orders MRNs REPORTSPowerPoint Presentation: Indent Details REPORTSPowerPoint Presentation: Status of the received consignments REPORTSPowerPoint Presentation: Rejected Material Details REPORTSPowerPoint Presentation: Material management system is developed with some of the best practices of application development. Many to Many mapping done for most of the the critical transactions like requisitions,indents,PO, MRN,RC, work order etc with real time status tracking. Multiple scheduling functionality will allow the user to consider single or multiple schedules at requisition, indents or at PO level. Dynamically changing the flow of information and process based on received item. ConclusionPowerPoint Presentation: THANK YOU Brainwave Applications http://www.brainwavelive.com/ Date : 05.04.2011 Click here to Contact us Brainwave Applications You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
Material-Management-Brainwave-Applications preethisudha Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 87 Category: Product Traini.. License: All Rights Reserved Like it (0) Dislike it (0) Added: December 06, 2011 This Presentation is Public Favorites: 0 Presentation Description Brainwave material management system is a complete end to end system for managing your material and inventory. It saves time, effort and reduces production costs with its dynamic information flow. Comments Posting comment... Premium member Presentation Transcript PowerPoint Presentation: Material Management System Brainwave Applications http://www.brainwavelive.com/ Date : 05.04.2011 A complete end to end system for managing your material and inventory from Brainwave ApplicationsPowerPoint Presentation: MATERIAL MANAGEMENT SYSTEM A complete end to end system for managing your material and inventory. It saves time, effort and reduces production costs with its dynamic information flow. Key Components Purchase Management Material Receipts & Issues Quality Management Inventory ManagementPowerPoint Presentation: Key Features Indent Requisitions Purchase Indents Purchase Orders BOM (Bill of Material) PURCHASE MANAGEMENTPowerPoint Presentation: BOM creation based on the requirement and QA specifications. Creation of indent requisitions, purchase indents and PO by department, requisition type and cost center with real time status tracking. Provision to raise multiple purchase indents against single indent requisition or single indent against multiple pending requisitions. Material price comparison along with procurement history. Auto updating / closure of indent requisition, purchase indents and PO. Key Benefits PURCHASE MANAGEMENTPowerPoint Presentation: Key Features Material Information Slip(MIS) On-line Consignment Approvals Material Receipt Note(MRN) Material Rejections Issue Vouchers Issue Returns Vouchers RC/NRC Goods Return Backward Note(GRBN) MATERIAL RECEIPTS & ISSUESPowerPoint Presentation: Online consignment approvals with respect to quality and PO. Real time status tracking of arrived consignment. Acceptance of material against single or multiple purchase order. Provision to accept the material against PO or indents. Regulating the flow of information based on the arrived item. System generated material rejections and outward material gate pass. Provision to issue partial quantities of requested quantities. Key Benefits MATERIAL RECEIPTS & ISSUESPowerPoint Presentation: Key Features Parameter Master Specification Master Brand Master Compound Code Master Product master Online Consignment quality approvals QUALITY MANAGEMENTPowerPoint Presentation: Integrated masters helps in generating BOM Defining specifications of materials and processes. System generated test reports and rejection reports. Item based retrieval of parameters with specs helps in quality approvals. Auto determination of the requirement of quality approvals of arrived item. Key Benefits QUALITY MANAGEMENTPowerPoint Presentation: Stocks reports for selected period. Display of real time stocks at transactions. Auto incremented item codes based on the material types. Provision to check last transactions performed of any given item. Auto updating of stocks and masters with respect to receipts and issues. Formulated minimum and maximum stocks along with ROL and ROQ. Key Benefits INVENTORY MANAGEMENTPowerPoint Presentation: Daily/periodical reports of both posted and un-posted transactions with status tracking Master reports Stock reports Department wise/Purchase type/Cost center wise reports of Indents/Issue Requisitions, Purchase indents, Purchase Orders MRNs REPORTSPowerPoint Presentation: Indent Details REPORTSPowerPoint Presentation: Status of the received consignments REPORTSPowerPoint Presentation: Rejected Material Details REPORTSPowerPoint Presentation: Material management system is developed with some of the best practices of application development. Many to Many mapping done for most of the the critical transactions like requisitions,indents,PO, MRN,RC, work order etc with real time status tracking. Multiple scheduling functionality will allow the user to consider single or multiple schedules at requisition, indents or at PO level. Dynamically changing the flow of information and process based on received item. ConclusionPowerPoint Presentation: THANK YOU Brainwave Applications http://www.brainwavelive.com/ Date : 05.04.2011 Click here to Contact us Brainwave Applications