Slide 2:
EMS Building just before pouring the concrete.
Slide 3:
EMS Building just before pouring the concrete.
Slide 4:
EMS Building after pouring the concrete.
Slide 5:
More dirt work.
Slide 7:
Trusses in main building.
Slide 8:
The backside of the non-clinical building.
Slide 9:
Loading dock.
Slide 10:
Fireproofing the steel.
Slide 11:
Front entryway.
Slide 12:
Front entryway drive-through portico.
Slide 13:
Front entryway drive-through portico.
Slide 14:
Administrative offices.
Slide 15:
Siding.
Slide 18:
Construction Completion Date Scheduled for September 2011