MRP II or Manufacturing Resource Planning by itself is the original modality of what we know now as ERP, and covered materials planning. This is part of eresource's ERP solution. MRP II is one of the evolution stages of eresource ERP and covers all the resources in a manufacturing company, with the additional ability to manage "what if" situations.

Comments

Presentation Transcript

Slide1:

Bill Of Material - eresource ERP for Manufacturing

Slide2:

What is BoM ? The Bill of Material is Considered to be an engineering document that specifies the ingredient of subordinate components required physically to make each part number or assembly. Defination of BOM in eresource BOM are normally accessed according to producton or procurment deadlines. The History Management function allows several types of BOM to be managed simultaneously. And operated according to the need of the customer.

Slide3:

The BOM components in eresource support the use of the Bill of Material in form of tree structure. BOM can be generated in the following forms: Structure of BOM Bill Of Material Forms Material BOM Equipment BOM Order Based BOM

Slide4:

Material 1 EQUIPMENT Assembly 2 Assembly 1 Material 3 Material 2 Material 4 Material 6 Material 5 Material B Material A Level 1 Level 2 Level 3 EQUIPMENT Types of BOM Single level BOM Multi-level BOM

Single Level Bill Of Material:

Single Level Bill Of Material Only subordinate components can be captured that are immediately required (not components of component)to manufacture product.

Multi Level Bill Of Material:

Multi Level Bill Of Material The multiple BOM concept aids the management of a variety of similar BOMs. Common components of similar BOMs are recorded in a 'Single Level BOM-M'

Standard BOM:

Standard BOM while making new standard BOM eresource ERP gives provision of copy any standard BOM from existing BOM

Slide8:

Order Based BOM In eresource ERP the provision is there to create a BOM against the sales order of any customer.

Slide9:

Engineering Change Request eresource ERP gives you provision of Revision of BOM which is called ECR. W selection of any item this form gives you provision to zoom in the BOM by click on View BOM.

Engineering Change Request:

Engineering Change Request This module allows you to establish controls and manage the process of making changes to documents and drawings,parts, BOM and routing, work orders, and projects.

Slide11:

Registered Office: eresource Infotech Private Limited, TMA House 1st floor, Road No. 16, Plot No. 6,Wagle Estate ,Thane (West) Tel: +91 22 41118000 to +91 22 41118050 (50 Lines) www.eresourceerp.com | http://nfra.eresourceerp.com/ Dubai P O Box 52034, Dubai UAE Mobile Number: 0097155 9018499 Email: sn@eresourceinfotech.com