slide 1: What is the Process of Making Shoe in Shoe
manufacturing industry
If you want to know the process of making shoe in shoe
factory or shoe industry then read this article fully. I am
going to tell you about the mass production shoe factory
and will give a description of all the equipment and shoe
making process. If you are interested to buy or before
buying you need to visit the factory then follow Infinity
group. They are the manufacturer of all type footwear
making machine and other industrial machines too.
This article is about to make sneakers shoes in bulk order.
It is a simple shoe making process which is only make
with die cut parts. The outsole is a one-piece rubber cup
console with die cut midsole inside and channel
stitching. Out sole is the bottom component of the sole
which provides grip to the shoes. Mostly it is in rubber
form and shoes manufacturer buy it from shops. The shoe
making machine controls the component to ensure that
the outsole is properly fixed or not. Injection Moulding
machine is mainly used for making all types of shoe sole.
This is two types- PVC vertical moulding machine and
TPR Moulding machine. These machines are used for
making sports shoes school shoes gum boots etc.
Now find the process of shoe making below-
Cutting the size and Marking: Inside the shoe making
factory cutting and marking operations are
slide 2: the beginning step in the manufacturing process. In this
process you will require cutting presses and it is also
known as clicker cutting machines. The clicker press is a
standard piece that you will see at every shoe factory. A
shoe cutting click press is a cutting press that requires
cutting for each shoe pattern part. A new technique for
cutting is the computer controlled drag knife cutter. A
vacuum table is used to make space in these machines
while the blade cuts all the pattern parts of the shoe. This
technique is important for custom mass production.
Once the shoe parts are cut they need to be processed.
The alignment marks are screen printed on the parts and
any logo is added. The logo can be silk screen printed
radio frequency welded or embroidered on the cut parts.
Stitching of Shoes: Once the first part is completed then
its time to follow the second step. The basic electric
sewing machine performs heavy lifting. With stitching
processes it is divided in many smaller operations
workers quickly master their specific tasks. These basic
machines operated by an experienced sewer can do
magic.
Assembly: It is time to bring out heavy equipment with
boots ready for assembly. The original assembly line is
approximately 100 yards long. At the front of the line
you will find a Steamteo permanent machiner to soften
the upper part of a shoe which will make those
slide 3: permanent. Permanent machines are used to pull tight on
the shoe.