The first detachable gooseneck trailer developed for hauling equipment

Views:
 
Category: Entertainment
     
 

Presentation Description

No description available.

Comments

Presentation Transcript

slide 1:

The frst detachable gooseneck trailer developed for hauling equipment provider Cyient’s end-to-end design and engineering solution enabled our client to add a 175 ton mining trailer to its product line

slide 2:

Overview Our client is a leading provider of specialty haulage solutions for the construction and mining industries. They required a new top-down design of a detachable gooseneck equipment trailer that is pulled behind a retrofitted mining truck. Design requirements included the ability to haul multiple equipment types with varied footprints as well as extreme loads typically associated with mining equipment. However with limiting design factors including the amount of load the trailer could handle weight optimization was critical to reducing material costs. Our Solution • Worked closely with our client to define requirements of trailer • Developed gooseneck deck frame and rear axle systems • Created advanced mechanisms for trailer loading and unloading operations including a detachable gooseneck system • Validated all structures independently as well as system wide with finite element analysis FEA verification • Developed pneumatic hydraulic and auto-greasing systems for all trailer operations • Created electrical harness and diagrams for all trailer lighting and control systems • Packaged hydraulic power unit and all necessary components inside the rear axle with a focus on durability in harsh mining environments • Produced detailed drawings for all mechanical pneumatic hydraulic and greasing systems using templates provided by the client Key Business Benefits • Executed full new product introduction NPI engineering efforts for a machine that was not currently in the client’s product line • Enabled the client to deliver structure designs that could be executed in-house resulting in streamlining operations and reducing overall project costs • Provided project management of mechanical electrical and hydraulic engineering efforts both onshore and offshore to bring a new product to market in approximately one year • Developed linkage mechanisms for the detachable gooseneck and gooseneck kickstand which included motion studies FEA design-for-manufacturing studies and the creation of mechanism videos for an end-customer display • Worked directly with component and system suppliers for lighting cameras and hydraulics to ensure consistent design and interoperability on the first build North America Headquarters Cyient Inc. 99 East River Drive 5th Floor East Hartford CT 06108 USA T: +1 860 528 5430 F: +1 860 528 5873 Peoria Engineering Center PEC Cyient Inc. 8001 North University Street Peoria IL 61615 USA T el: +1 309 697 5975 Fax: +1 309 691 3114 Europe Middle East and Africa Headquarters Cyient Europe Ltd. High Holborn House 52-54 High Holborn London WC1V 6RL UK T: +44 20 7404 0640 F: +44 20 7404 0664 Asia Pacifc Headquarters Cyient Limited Level 1 350 Collins Street Melbourne Victoria 3000 Australia T: +61 3 8605 4815 F: +61 3 8601 1180 Global Headquarters Cyient Limited Plot No. 11 Software Units Layout Infocity Madhapur Hyderabad - 500081 India T: +91 40 6764 1000 F: +91 40 2311 0352 About Cyient Cyient Estd: 1991 NSE:CYIENT provides engineering manufacturing geospatial network and operations management services to global industry leaders. We leverage the power of digital technology and advanced analytics capabilities along with domain knowledge and technical expertise to solve complex business problems. As a Design Build and Maintain partner we take solution ownership across the value chain to help our clients focus on their core innovate and stay ahead of the curve. cyient.com Cyient © 2018. All Rights Reserved

authorStream Live Help