logging in or signing up LF LOGISTICS NV conveyabull Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 34 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: June 01, 2010 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide 1: CONVEYABULL SPECIALIZING IN DRAINAGE LAYER INSTALLATION FOR LANDFILL CELLS Slide 2: A CONVEYABULL LOGISTICS THE GREEN PERIMETER WILL BE THE SLOPES OF THE CELL THE YELLOW SQUARE WILL BE THE FLOOR OF THE CELL Slide 3: LINER IS BEING INSTALLED ON THE FIRST SLOPE CONVEYABULL TRUCKS INSTALL DRAINAGE LAYER MATERIAL ON THE BASE OF THE FIRST SLOPE. THE MACHINES CAN PLACE MATERIAL 40-65 FEET UP A SLOPE. ON PROJECTS WITH LARGER SLOPES, CONVEYABULL TRUCKS WINDROW MATERIAL ON THE POINT AT WHICH THEY CAN NO LONGER REACH. A DOZER WILL THEN PUSH MATERIAL FROM THE WINDROW INTO THE SECTION ON THE SLOPE THAT CONVEYABULL TRUCKS CANNOT REACH FROM THE TOP OR BOTTOM OF THE SLOPES. WITH 40-65 FEET OF DRAINAGE LAYER INSTALLED ON THE SLOPES FROM THE BASE , NO WRINKLES ARE CREATED. THIS IS A PROBLEM WITH TRADITIONAL METHODS WHEN A DOZER PUSHES MATERIAL FROM THE BASE OF A CELL UP A SLOPE. THE SPINNING TRACKS WILL CAUSE MATERIAL TO RUN DOWNHILL AND PULL THE LINER WITH IT. WE WILL CALL THIS THE “END ZONE” Slide 4: A DOZER GRADES OUT THE TRUCK TIRE TRACKS IN PREPARATION FOR LINER INSTALLATION AS LINER IS INSTALLED, DRAINAGE LAYER IS PLACED RIGHT BEHIND IT. Slide 5: SEAM IS LEFT EXPOSED UNTIL THE SLOPE LINER IS WELDED TO THE FLOOR LINER Slide 6: BOTH CONTRACTORS WORKING ON OPPOSITE ENDS OF THE CELL SIMULTANEOUSLY. Slide 7: C B Slide 8: C B Slide 9: C B MATERIAL IS WINDROWED NEXT TO THE FINAL FLOOR SECTION. Slide 10: E B CONVEYABULL TRUCKS PLACE MATERIAL FROM THE TOP PERIMETER OF THE SLOPES. MATERIAL IS CONVEYED TO THE “END ZONE” AND UP TOWARDS THE TOP OF THE SLOPES. THIS WILL CONTNUE TO WORK THE WRINKLES FROM THE BASE TO THE TOP OF THE SLOPES. “END ZONE” A DOZER PUSHES MATERIAL FROM THE WINDROW INTO THE FINAL FLOOR SECTION. CONVEYABULL REDUCES THE AMOUNT OF EQUIPMENT REQUIRED FOR PLACING DRAINAGE LAYER MATERIAL. WE MAKE IT POSSIBLE FOR ALL APPLICABLE CONTRACTORS TO WORK SIMULTANEOUSLY. SAVE TIME : SAVE TIME WE ONLY REQUIRE LABOR HOLDING A GPS RECEIVER TO ENSURE THAT MATERIAL IS CONVEYED TO GRADE THE FIRST TIME. YOU DON’T HAVE TO GRADE & RE-GRADE OR REDO YOUR GRADE. YOU DON’T HAVE TO WASTE YOUR TIME WITH REPAIRING WRINKLES OR PUNCTURES. WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. SAVE LABOR : SAVE LABOR WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. YOU DON’T NEED TO ORCHESTRATE TONS OF EQUIPMENT AND LABOR TO ACHIEVE SUCH AN EASY TASK. EQUIPMENT AND LABOR CAN BE APPROPRIATED TO OTHER PROJECTS. SAVE MONEY : SAVE MONEY WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. YOU DON’T HAVE TO PAY TO RE-GRADE AREAS OR REMOVE EXCESS MATERIAL FROM HAUL ROADS CAUSED BY MISCALCULATIONS OR LOST LOAD COUNTS. YOU DON’T HAVE TO PAY FOR LINER REPAIRS. REDUCE HEADACHES : REDUCE HEADACHES WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. INSTALLING DRAINAGE LAYER MATERIAL IS A STRUGGLE FOR ALL SEASONED LANDFILL CONTRACTORS THAT USE TRADITIONAL METHODS. WHY USE EXCESSIVE LABOR & EQUIP. WHEN YOU CAN DO IT FASTER AND EASIER WITH US? : WHY USE EXCESSIVE LABOR & EQUIP. WHEN YOU CAN DO IT FASTER AND EASIER WITH US? WWW.CONVEYABULL.COM You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
LF LOGISTICS NV conveyabull Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 34 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: June 01, 2010 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide 1: CONVEYABULL SPECIALIZING IN DRAINAGE LAYER INSTALLATION FOR LANDFILL CELLS Slide 2: A CONVEYABULL LOGISTICS THE GREEN PERIMETER WILL BE THE SLOPES OF THE CELL THE YELLOW SQUARE WILL BE THE FLOOR OF THE CELL Slide 3: LINER IS BEING INSTALLED ON THE FIRST SLOPE CONVEYABULL TRUCKS INSTALL DRAINAGE LAYER MATERIAL ON THE BASE OF THE FIRST SLOPE. THE MACHINES CAN PLACE MATERIAL 40-65 FEET UP A SLOPE. ON PROJECTS WITH LARGER SLOPES, CONVEYABULL TRUCKS WINDROW MATERIAL ON THE POINT AT WHICH THEY CAN NO LONGER REACH. A DOZER WILL THEN PUSH MATERIAL FROM THE WINDROW INTO THE SECTION ON THE SLOPE THAT CONVEYABULL TRUCKS CANNOT REACH FROM THE TOP OR BOTTOM OF THE SLOPES. WITH 40-65 FEET OF DRAINAGE LAYER INSTALLED ON THE SLOPES FROM THE BASE , NO WRINKLES ARE CREATED. THIS IS A PROBLEM WITH TRADITIONAL METHODS WHEN A DOZER PUSHES MATERIAL FROM THE BASE OF A CELL UP A SLOPE. THE SPINNING TRACKS WILL CAUSE MATERIAL TO RUN DOWNHILL AND PULL THE LINER WITH IT. WE WILL CALL THIS THE “END ZONE” Slide 4: A DOZER GRADES OUT THE TRUCK TIRE TRACKS IN PREPARATION FOR LINER INSTALLATION AS LINER IS INSTALLED, DRAINAGE LAYER IS PLACED RIGHT BEHIND IT. Slide 5: SEAM IS LEFT EXPOSED UNTIL THE SLOPE LINER IS WELDED TO THE FLOOR LINER Slide 6: BOTH CONTRACTORS WORKING ON OPPOSITE ENDS OF THE CELL SIMULTANEOUSLY. Slide 7: C B Slide 8: C B Slide 9: C B MATERIAL IS WINDROWED NEXT TO THE FINAL FLOOR SECTION. Slide 10: E B CONVEYABULL TRUCKS PLACE MATERIAL FROM THE TOP PERIMETER OF THE SLOPES. MATERIAL IS CONVEYED TO THE “END ZONE” AND UP TOWARDS THE TOP OF THE SLOPES. THIS WILL CONTNUE TO WORK THE WRINKLES FROM THE BASE TO THE TOP OF THE SLOPES. “END ZONE” A DOZER PUSHES MATERIAL FROM THE WINDROW INTO THE FINAL FLOOR SECTION. CONVEYABULL REDUCES THE AMOUNT OF EQUIPMENT REQUIRED FOR PLACING DRAINAGE LAYER MATERIAL. WE MAKE IT POSSIBLE FOR ALL APPLICABLE CONTRACTORS TO WORK SIMULTANEOUSLY. SAVE TIME : SAVE TIME WE ONLY REQUIRE LABOR HOLDING A GPS RECEIVER TO ENSURE THAT MATERIAL IS CONVEYED TO GRADE THE FIRST TIME. YOU DON’T HAVE TO GRADE & RE-GRADE OR REDO YOUR GRADE. YOU DON’T HAVE TO WASTE YOUR TIME WITH REPAIRING WRINKLES OR PUNCTURES. WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. SAVE LABOR : SAVE LABOR WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. YOU DON’T NEED TO ORCHESTRATE TONS OF EQUIPMENT AND LABOR TO ACHIEVE SUCH AN EASY TASK. EQUIPMENT AND LABOR CAN BE APPROPRIATED TO OTHER PROJECTS. SAVE MONEY : SAVE MONEY WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. YOU DON’T HAVE TO PAY TO RE-GRADE AREAS OR REMOVE EXCESS MATERIAL FROM HAUL ROADS CAUSED BY MISCALCULATIONS OR LOST LOAD COUNTS. YOU DON’T HAVE TO PAY FOR LINER REPAIRS. REDUCE HEADACHES : REDUCE HEADACHES WHEN USING CONVEYABULL TO INSTALL THE DRAINAGE LAYER, YOU…. INSTALLING DRAINAGE LAYER MATERIAL IS A STRUGGLE FOR ALL SEASONED LANDFILL CONTRACTORS THAT USE TRADITIONAL METHODS. WHY USE EXCESSIVE LABOR & EQUIP. WHEN YOU CAN DO IT FASTER AND EASIER WITH US? : WHY USE EXCESSIVE LABOR & EQUIP. WHEN YOU CAN DO IT FASTER AND EASIER WITH US? WWW.CONVEYABULL.COM