Slide 2:

OWNER THE IS PLANNING TO BUILD A HOUSE FOR HIS FAMILY.

HE CONTACTED AN:

HE CONTACTED AN ARCHITECT

Slide 4:

FOR CONSULTATION.

AFTER THEIR CONVERSATION,:

AFTER THEIR CONVERSATION, THEY BOTH AGREED ON THE PLANS AND DESIGNS .

Slide 6:

FOR HIS FUTURE HOUSE.

THIS IS THE TIME THAT THE:

THIS IS THE TIME THAT THE CONTRACTOR WILL ENTER INTO THE CONTRACT

WHOSE PROPOSAL HAS BEEN :

WHOSE PROPOSAL HAS BEEN CONTRACTOR ACCEPTED AND CONTRACT AWARDED

MUST BE PRESENT::

MUST BE PRESENT: BEFORE THE PROJECT BEGINS DURING THE PROJECT AFTER THE PROJECT HAS BEEN COMPLETED CONTRACTOR

THE :

THE CONTRACTOR MUST HAVE A SUB - CONTRACTOR

Slide 11:

SUB - CONTRACTOR A DIRECT CONTACT WITH CONTRACTOR, ACTS IN BEHALF OF THE CONTRACTOR IN EXECUTING ANY PART OF THE CONTRACT

Slide 12:

15 DAYS SUB - CONTRACTOR ATLEAST 15 DAYS PRIOR TO THE DATE OF BIDDING SHAL L SEEK THE ARCHITECTS CLARIFFICATION FOR THE NEED OF SUB -CON TRACTS SOME PARTICULAR AREAS OF THE WORK.

FULL TIME CONSTRUCTION INSPECTOR.:

PROJECT REPRESENTATIVE FULL TIME CONSTRUCTION INSPECTOR. HIRED BY OWNER ASSISTING IN THE SUPERVISION OF THE WORK.

Slide 14:

OWNER PROJECT PROJECT REPRESENTATIVE ARCHITECT

Slide 15:

OWNER PROJECT PROJECT REPRESENTATIVE ARCHITECT CONTRACTOR SUB-CONTRACTOR ENGINEER

CONTRACT DOCUMENTS:

CONTRACT DOCUMENTS 5 SETS SIGNED BY THE OWNER ANF THE CONTRACTOR

Slide 17:

CONTRACTOR SHALL HAVE 1 COPY OF ALL THE DESIGNS AND SPECIFICATIONS , BREAKDOWN OF WORK AND SCHEDULE OF CONSTRUCTION WORK AT THE SITE.

Slide 18:

OWNER FURNISH 3 SETS OF DRAWINGS AND SPECIFICATIONS TO THE CONTRACTOR.

PERMITS, TAXES, AND SURVEYOR:

PERMITS, TAXES, AND SURVEYOR SHALL PAY THE SUVEYOR THE CONFIRMATION OF LOCATION OF COLUMNS, PIERS, WALLS, & ETC. CONTRACTOR SHALL SECURE FINAL OCCUPANCY PERMIT – BUT NOT RESPONSIBLE.

EQUIPMENTS:

EQUIPMENTS CONTRACTOR FURNISH 3 COPIES OF COMPLETE CATALOG DATA MANUFACTURED ITEM OF EQ UIPMENT .

MATERIALS, FIXTURES, APLLIANCES AND FITTING FURNISHES:

MATERIALS, FIXTURES, APLLIANCES AND FITTING FURNISHES CONTRACTOR 3 EXAMPLES SHALL BE SUBMITTED BY THE SUBMIT MORE SAMPLES AS NEEDED FOR THE PURPOSE OF TESTING . ALL COST SHALL BE PAID BY THE CONTRACTOR

Slide 22:

MATERIALS, FIXTURES, APLLIANCES AND FITTING FURNISHES BY OWNER CONTRACTOR DISCOVERS ANY DEFECT FURNISHED – NOTIFY THE ARCHITECT.