Logistics Of A Store Remodel:

Logistics Of A Store Remodel Arranged By BR International Value Added Services Logistics

Picking A Warehouse Is Based On 3 Factors:

Picking A Warehouse Is Based On 3 Factors Proximity – 50 miles or less away from the store location Capacity – 5000 sq. ft. needed for storage space. At least ½ of this needs to be open floor space Availability – 21+ weeks needed of storage space

Gathering The Materials:

Gathering The Materials All materials secured in warehouse full seven days before construction begins. In total, inbound goods shipments average about ten truckloads and eight partial truckloads.

Managing The Materials:

Managing The Materials Materials are checked against the master inventory and put in the retailer’s databse . Typically, requests for delivery of materials from warehouse to store need to be made 48 hours in advance, but sometimes deliveries are expedited same day.

Delivering The Materials:

Delivering The Materials Since stores stay in operation during remodeling, deliveries takes place after the close of business.

The Finishing Touches:

The Finishing Touches After all permanent fixtures are installed, the stage is set for completion. The final step for the retailer will be to display their products throughout the newly remodeled store to be ready for their customers.