logging in or signing up Aspects of rural infrastructure project bhimupadhyaya Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 186 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: March 11, 2010 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide 1: Aspects of Rural Infras Project Management Er. Bhim Upadhyaya DDG DoLIDAR NASC class on Aspects of Rural Infras Project Managment 066.11.25 1 Engineer & Engineering : Engineer & Engineering "Engineering is a great profession. There is the satisfaction of watching a figment of the imagination emerge through the aid of science to a plan on paper. then it moves to realization in stone or metal or energy. then it brings homes to men or women. then it elevates the standard of living and adds to the comforts of life. this is the engineer's high privilege." -Herbert Hoover (Er.) 31st President, USA 2 NASC class on Aspects of Rural Infras Project Managment 066.11.25 Engineer & Engineering : Engineer & Engineering "The great liability of the engineer compared to men of other professions is that his works are out in the open where all can see them. His acts, step by step, are in hard substance. He cannot bury his mistakes in the grave like the doctors. He cannot argue them into thin air or blame the judge like the lawyers. He cannot, like the architects, cover his failures with trees and vines. He cannot, like the politicians, screen his short-comings by blaming his opponents and hope the people will forget. The engineer simply cannot deny he did it. If his works do not work, he is damned." -Herbert Hoover, Engineer & 31st President, USA 3 NASC class on Aspects of Rural Infras Project Managment 066.11.25 Engineering : Engineering "The story of civilization is, in a sense, the story of engineering- that long and arduous struggle to make the forces of nature work for man's good." --L Sprange DeCamp 4 NASC class on Aspects of Rural Infras Project Managment 066.11.25 Lecture Content : NASC class on Aspects of Rural Infras Project Managment 066.11.25 5 Lecture Content Project: definition, cycle, party & phases Project Stakeholders, Functions, Environment,Phases, Tools Project Practice: Rural Infras. Responsibility Break-down Some relevant case-photographs What is a Project(Public Works)? : What is a Project(Public Works)? A Project has the following attributes… Objective or Goal Time Cost Location or space; and A Team-work of experts NASC class on Aspects of Rural Infras Project Managment 066.11.25 6 A Project has mainly 3+1 Stakeholders: 4C's : A Project has mainly 3+1 Stakeholders: 4C's 1.Client (or Employer) 2.Consultant (or Engineer) 3.Contractor (or Consumer Group) 4.Consumer NASC class on Aspects of Rural Infras Project Managment 066.11.25 7 Project Phases : Project Phases Study (Data collection & Need) Design Phase (Detailing for Goal) Development Phase (Input-Output Mngt.) Operation Phase (Service Mngt.) NASC class on Aspects of Rural Infras Project Managment 066.11.25 8 Slide 9: NASC class on Aspects of Rural Infras Project Managment 066.11.25 9 Project Life cycle Slide 10: NASC class on Aspects of Rural Infras Project Managment 066.11.25 10 Project Phases Slide 11: NASC class on Aspects of Rural Infras Project Managment 066.11.25 11 Work Break Down Structure : Work Break Down Structure NASC class on Aspects of Rural Infras Project Managment 066.11.25 12 Slide 13: NASC class on Aspects of Rural Infras Project Managment 066.11.25 13 Work Break Down Structure Slide 14: NASC class on Aspects of Rural Infras Project Managment 066.11.25 14 Gantt Chart CPM : CPM NASC class on Aspects of Rural Infras Project Managment 066.11.25 15 Slide 16: NASC class on Aspects of Rural Infras Project Managment 066.11.25 16 16 Seven Sectors of Local Infrastructure Slide 17: 17 PROJECT MGMT (Input & Output) PROCUREMENT MGMT, Goods, works, services FINANCIAL MGMT CONTRACT MGMT QLTY/LAB MGMT SITE MGMT PROJECT Management Breakdown Technical Audit QAP WORK PLAN payment in time DISBURSEMENT Reporting Mobilization Insurance Claim & Refund Detail Project Report Selection, Walkover EIRR,IEE, Resettlement Land Acquisition Detail Survey, Design Estimate Approval Contractors RBG, VIUG Consultants CONSTRUCTION MGMT NASC class on Aspects of Rural Infras Project Managment 066.11.25 Public Works Parties : Public Works Parties NASC class on Aspects of Rural Infras Project Managment 066.11.25 18 Standard 3 party Int'l Practice for large Works 2 Party Nepali(Local Body) Practice for small and medium sized Works Phases of Public Works : Phases of Public Works NASC class on Aspects of Rural Infras Project Managment 066.11.25 19 Slide 20: NASC class on Aspects of Rural Infras Project Managment 066.11.25 20 Slide 21: NASC class on Aspects of Rural Infras Project Managment 066.11.25 21 Slide 22: NASC class on Aspects of Rural Infras Project Managment 066.11.25 22 3 Parties Mutual Check and Balance : 3 Parties Mutual Check and Balance NASC class on Aspects of Rural Infras Project Managment 066.11.25 23 Supervisory Hierarchy : Supervisory Hierarchy NASC class on Aspects of Rural Infras Project Managment 066.11.25 24 Slide 25: NASC class on Aspects of Rural Infras Project Managment 066.11.25 25 Aspects Scheduling, Gantt, CPM, PERT Drawing, Specification, Lab Tests, Qualified Supervisors Slide 26: NASC class on Aspects of Rural Infras Project Managment 066.11.25 26 Road ill-designed and in Disrepair : NASC class on Aspects of Rural Infras Project Managment 066.11.25 27 Road ill-designed and in Disrepair 27 Poor-Maintenance and hardships 12,000km un-operational road Good Quality works in progress : Good Quality works in progress NASC class on Aspects of Rural Infras Project Managment 066.11.25 28 : NASC class on Aspects of Rural Infras Project Managment 066.11.25 29 29 Road Construction Technologies : NASC class on Aspects of Rural Infras Project Managment 066.11.25 30 Road Construction Technologies 30 Slide 31: NASC class on Aspects of Rural Infras Project Managment 066.11.25 31 Lab Facility Slide 32: NASC class on Aspects of Rural Infras Project Managment 066.11.25 32 32 More than 12000 such TB Required Slide 33: NASC class on Aspects of Rural Infras Project Managment 066.11.25 33 33 Slide 34: NASC class on Aspects of Rural Infras Project Managment 066.11.25 34 Project Stakeholders Slide 35: NASC class on Aspects of Rural Infras Project Managment 066.11.25 35 Project Environment Slide 36: NASC class on Aspects of Rural Infras Project Managment 066.11.25 36 Cost Control through Time, Cost Control Slide 37: NASC class on Aspects of Rural Infras Project Managment 066.11.25 37 Core Function of a Project Slide 38: NASC class on Aspects of Rural Infras Project Managment 066.11.25 38 Scope, Time and Cost management for Success of Project Any Question : NASC class on Aspects of Rural Infras Project Managment 066.11.25 39 Thank You Any Question bhimupadhyaya@gmail.com You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
Aspects of rural infrastructure project bhimupadhyaya Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 186 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: March 11, 2010 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide 1: Aspects of Rural Infras Project Management Er. Bhim Upadhyaya DDG DoLIDAR NASC class on Aspects of Rural Infras Project Managment 066.11.25 1 Engineer & Engineering : Engineer & Engineering "Engineering is a great profession. There is the satisfaction of watching a figment of the imagination emerge through the aid of science to a plan on paper. then it moves to realization in stone or metal or energy. then it brings homes to men or women. then it elevates the standard of living and adds to the comforts of life. this is the engineer's high privilege." -Herbert Hoover (Er.) 31st President, USA 2 NASC class on Aspects of Rural Infras Project Managment 066.11.25 Engineer & Engineering : Engineer & Engineering "The great liability of the engineer compared to men of other professions is that his works are out in the open where all can see them. His acts, step by step, are in hard substance. He cannot bury his mistakes in the grave like the doctors. He cannot argue them into thin air or blame the judge like the lawyers. He cannot, like the architects, cover his failures with trees and vines. He cannot, like the politicians, screen his short-comings by blaming his opponents and hope the people will forget. The engineer simply cannot deny he did it. If his works do not work, he is damned." -Herbert Hoover, Engineer & 31st President, USA 3 NASC class on Aspects of Rural Infras Project Managment 066.11.25 Engineering : Engineering "The story of civilization is, in a sense, the story of engineering- that long and arduous struggle to make the forces of nature work for man's good." --L Sprange DeCamp 4 NASC class on Aspects of Rural Infras Project Managment 066.11.25 Lecture Content : NASC class on Aspects of Rural Infras Project Managment 066.11.25 5 Lecture Content Project: definition, cycle, party & phases Project Stakeholders, Functions, Environment,Phases, Tools Project Practice: Rural Infras. Responsibility Break-down Some relevant case-photographs What is a Project(Public Works)? : What is a Project(Public Works)? A Project has the following attributes… Objective or Goal Time Cost Location or space; and A Team-work of experts NASC class on Aspects of Rural Infras Project Managment 066.11.25 6 A Project has mainly 3+1 Stakeholders: 4C's : A Project has mainly 3+1 Stakeholders: 4C's 1.Client (or Employer) 2.Consultant (or Engineer) 3.Contractor (or Consumer Group) 4.Consumer NASC class on Aspects of Rural Infras Project Managment 066.11.25 7 Project Phases : Project Phases Study (Data collection & Need) Design Phase (Detailing for Goal) Development Phase (Input-Output Mngt.) Operation Phase (Service Mngt.) NASC class on Aspects of Rural Infras Project Managment 066.11.25 8 Slide 9: NASC class on Aspects of Rural Infras Project Managment 066.11.25 9 Project Life cycle Slide 10: NASC class on Aspects of Rural Infras Project Managment 066.11.25 10 Project Phases Slide 11: NASC class on Aspects of Rural Infras Project Managment 066.11.25 11 Work Break Down Structure : Work Break Down Structure NASC class on Aspects of Rural Infras Project Managment 066.11.25 12 Slide 13: NASC class on Aspects of Rural Infras Project Managment 066.11.25 13 Work Break Down Structure Slide 14: NASC class on Aspects of Rural Infras Project Managment 066.11.25 14 Gantt Chart CPM : CPM NASC class on Aspects of Rural Infras Project Managment 066.11.25 15 Slide 16: NASC class on Aspects of Rural Infras Project Managment 066.11.25 16 16 Seven Sectors of Local Infrastructure Slide 17: 17 PROJECT MGMT (Input & Output) PROCUREMENT MGMT, Goods, works, services FINANCIAL MGMT CONTRACT MGMT QLTY/LAB MGMT SITE MGMT PROJECT Management Breakdown Technical Audit QAP WORK PLAN payment in time DISBURSEMENT Reporting Mobilization Insurance Claim & Refund Detail Project Report Selection, Walkover EIRR,IEE, Resettlement Land Acquisition Detail Survey, Design Estimate Approval Contractors RBG, VIUG Consultants CONSTRUCTION MGMT NASC class on Aspects of Rural Infras Project Managment 066.11.25 Public Works Parties : Public Works Parties NASC class on Aspects of Rural Infras Project Managment 066.11.25 18 Standard 3 party Int'l Practice for large Works 2 Party Nepali(Local Body) Practice for small and medium sized Works Phases of Public Works : Phases of Public Works NASC class on Aspects of Rural Infras Project Managment 066.11.25 19 Slide 20: NASC class on Aspects of Rural Infras Project Managment 066.11.25 20 Slide 21: NASC class on Aspects of Rural Infras Project Managment 066.11.25 21 Slide 22: NASC class on Aspects of Rural Infras Project Managment 066.11.25 22 3 Parties Mutual Check and Balance : 3 Parties Mutual Check and Balance NASC class on Aspects of Rural Infras Project Managment 066.11.25 23 Supervisory Hierarchy : Supervisory Hierarchy NASC class on Aspects of Rural Infras Project Managment 066.11.25 24 Slide 25: NASC class on Aspects of Rural Infras Project Managment 066.11.25 25 Aspects Scheduling, Gantt, CPM, PERT Drawing, Specification, Lab Tests, Qualified Supervisors Slide 26: NASC class on Aspects of Rural Infras Project Managment 066.11.25 26 Road ill-designed and in Disrepair : NASC class on Aspects of Rural Infras Project Managment 066.11.25 27 Road ill-designed and in Disrepair 27 Poor-Maintenance and hardships 12,000km un-operational road Good Quality works in progress : Good Quality works in progress NASC class on Aspects of Rural Infras Project Managment 066.11.25 28 : NASC class on Aspects of Rural Infras Project Managment 066.11.25 29 29 Road Construction Technologies : NASC class on Aspects of Rural Infras Project Managment 066.11.25 30 Road Construction Technologies 30 Slide 31: NASC class on Aspects of Rural Infras Project Managment 066.11.25 31 Lab Facility Slide 32: NASC class on Aspects of Rural Infras Project Managment 066.11.25 32 32 More than 12000 such TB Required Slide 33: NASC class on Aspects of Rural Infras Project Managment 066.11.25 33 33 Slide 34: NASC class on Aspects of Rural Infras Project Managment 066.11.25 34 Project Stakeholders Slide 35: NASC class on Aspects of Rural Infras Project Managment 066.11.25 35 Project Environment Slide 36: NASC class on Aspects of Rural Infras Project Managment 066.11.25 36 Cost Control through Time, Cost Control Slide 37: NASC class on Aspects of Rural Infras Project Managment 066.11.25 37 Core Function of a Project Slide 38: NASC class on Aspects of Rural Infras Project Managment 066.11.25 38 Scope, Time and Cost management for Success of Project Any Question : NASC class on Aspects of Rural Infras Project Managment 066.11.25 39 Thank You Any Question bhimupadhyaya@gmail.com