Aspects of rural infrastructure project

Views:
 
Category: Education
     
 

Presentation Description

No description available.

Comments

Presentation Transcript

Slide 1: 

Aspects of Rural Infras Project Management Er. Bhim Upadhyaya DDG DoLIDAR NASC class on Aspects of Rural Infras Project Managment 066.11.25 1

Engineer & Engineering : 

Engineer & Engineering "Engineering is a great profession. There is the satisfaction of watching a figment of the imagination emerge through the aid of science to a plan on paper. then it moves to realization in stone or metal or energy. then it brings homes to men or women. then it elevates the standard of living and adds to the comforts of life. this is the engineer's high privilege." -Herbert Hoover (Er.) 31st President, USA 2 NASC class on Aspects of Rural Infras Project Managment 066.11.25

Engineer & Engineering : 

Engineer & Engineering "The great liability of the engineer compared to men of other professions is that his works are out in the open where all can see them. His acts, step by step, are in hard substance. He cannot bury his mistakes in the grave like the doctors. He cannot argue them into thin air or blame the judge like the lawyers. He cannot, like the architects, cover his failures with trees and vines. He cannot, like the politicians, screen his short-comings by blaming his opponents and hope the people will forget. The engineer simply cannot deny he did it. If his works do not work, he is damned." -Herbert Hoover, Engineer & 31st President, USA 3 NASC class on Aspects of Rural Infras Project Managment 066.11.25

Engineering : 

Engineering "The story of civilization is, in a sense, the story of engineering- that long and arduous struggle to make the forces of nature work for man's good." --L Sprange DeCamp 4 NASC class on Aspects of Rural Infras Project Managment 066.11.25

Lecture Content : 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 5 Lecture Content Project: definition, cycle, party & phases Project Stakeholders, Functions, Environment,Phases, Tools Project Practice: Rural Infras. Responsibility Break-down Some relevant case-photographs

What is a Project(Public Works)? : 

What is a Project(Public Works)? A Project has the following attributes… Objective or Goal Time Cost Location or space; and A Team-work of experts NASC class on Aspects of Rural Infras Project Managment 066.11.25 6

A Project has mainly 3+1 Stakeholders: 4C's : 

A Project has mainly 3+1 Stakeholders: 4C's 1.Client (or Employer) 2.Consultant (or Engineer) 3.Contractor (or Consumer Group) 4.Consumer NASC class on Aspects of Rural Infras Project Managment 066.11.25 7

Project Phases : 

Project Phases Study (Data collection & Need) Design Phase (Detailing for Goal) Development Phase (Input-Output Mngt.) Operation Phase (Service Mngt.) NASC class on Aspects of Rural Infras Project Managment 066.11.25 8

Slide 9: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 9 Project Life cycle

Slide 10: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 10 Project Phases

Slide 11: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 11

Work Break Down Structure : 

Work Break Down Structure NASC class on Aspects of Rural Infras Project Managment 066.11.25 12

Slide 13: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 13 Work Break Down Structure

Slide 14: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 14 Gantt Chart

CPM : 

CPM NASC class on Aspects of Rural Infras Project Managment 066.11.25 15

Slide 16: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 16 16 Seven Sectors of Local Infrastructure

Slide 17: 

17 PROJECT MGMT (Input & Output) PROCUREMENT MGMT, Goods, works, services FINANCIAL MGMT CONTRACT MGMT QLTY/LAB MGMT SITE MGMT PROJECT Management Breakdown Technical Audit QAP WORK PLAN payment in time DISBURSEMENT Reporting Mobilization Insurance Claim & Refund Detail Project Report Selection, Walkover EIRR,IEE, Resettlement Land Acquisition Detail Survey, Design Estimate Approval Contractors RBG, VIUG Consultants CONSTRUCTION MGMT NASC class on Aspects of Rural Infras Project Managment 066.11.25

Public Works Parties : 

Public Works Parties NASC class on Aspects of Rural Infras Project Managment 066.11.25 18 Standard 3 party Int'l Practice for large Works 2 Party Nepali(Local Body) Practice for small and medium sized Works

Phases of Public Works : 

Phases of Public Works NASC class on Aspects of Rural Infras Project Managment 066.11.25 19

Slide 20: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 20

Slide 21: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 21

Slide 22: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 22

3 Parties Mutual Check and Balance : 

3 Parties Mutual Check and Balance NASC class on Aspects of Rural Infras Project Managment 066.11.25 23

Supervisory Hierarchy : 

Supervisory Hierarchy NASC class on Aspects of Rural Infras Project Managment 066.11.25 24

Slide 25: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 25 Aspects Scheduling, Gantt, CPM, PERT Drawing, Specification, Lab Tests, Qualified Supervisors

Slide 26: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 26

Road ill-designed and in Disrepair : 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 27 Road ill-designed and in Disrepair 27 Poor-Maintenance and hardships 12,000km un-operational road

Good Quality works in progress : 

Good Quality works in progress NASC class on Aspects of Rural Infras Project Managment 066.11.25 28

NASC class on Aspects of Rural Infras Project Managment 066.11.25 29 29

Road Construction Technologies : 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 30 Road Construction Technologies 30

Slide 31: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 31 Lab Facility

Slide 32: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 32 32 More than 12000 such TB Required

Slide 33: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 33 33

Slide 34: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 34 Project Stakeholders

Slide 35: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 35 Project Environment

Slide 36: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 36 Cost Control through Time, Cost Control

Slide 37: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 37 Core Function of a Project

Slide 38: 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 38 Scope, Time and Cost management for Success of Project

Any Question : 

NASC class on Aspects of Rural Infras Project Managment 066.11.25 39 Thank You Any Question bhimupadhyaya@gmail.com