logging in or signing up bass in-service bassmedical2011 Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 17 Category: Product Traini.. License: All Rights Reserved Like it (0) Dislike it (0) Added: March 21, 2011 This Presentation is Public Favorites: 0 Presentation Description Learn how to keep your OR floors dry with the BASS®. The SOLUTION for the fluid on the floor problem. Comments Posting comment... Premium member Presentation Transcript Slide 1: Solving the “fluid on the floor problem” with the BASS® Directions for use Slide 2: Over the next few minutes we’ll show you how to easily store and use The BASS® Slide 3: The BASS® can be stored on the supply carts in the OR Slide 4: Unroll the BASS® after removing from plastic packaging Slide 5: Flatten and place on the floor with the batting side up Slide 6: Place the BASS® with the suction port side next to the OR table Suction ports are located on side of the BASS Slide 7: Utilize the BASS® Pre-assembled Tubing Set to connect to suction 9 foot sections 2 foot section Slide 8: The BASS® will work with standard wall suction or the Neptune Waste Management System. Wall Neptune Slide 9: First, connect clear ends of 9-foot tubing to both of the BASS® suction ports Slide 10: Slide suction tubing under the OR table towards the suction system Slide 11: If using standard wall suction, attach blue ends of 9-foot tubing to Y-connector Slide 12: And then attach blue end of 2-foot tubing to suction canister Slide 13: If using the Neptune Waste Management System, attach both blue ends of 9-foot tubing to the Neptune Slide 14: Discard the 2-foot tubing section and Y-connector Slide 15: Activate suction at highest setting Using either wall or Neptune Slide 16: When draping, position drapes so fluid drains onto the BASS® Slide 17: If using a foot pedal, place in plastic bag to facilitate easier movement of pedal on the BASS® Slide 18: Mayos and gurneys may be rolled near the BASS® Slide 19: ..or they can roll onto the BASS® Slide 20: They can even be placed under the BASS® Slide 21: Stools will also roll easily onto the BASS® Slide 22: Up to three people can stand on the BASS® simultaneously Slide 23: Up to three people can stand on the BASS® simultaneously Slide 24: The BASS® collects, contains, and eliminates fluids during surgery Slide 25: Even without suction operating, the BASS® will hold 15 liters of fluid Slide 26: Over 40 liters of fluid have been collected in one procedure with suction Slide 27: Cleaning up after using the BASS® Slide 28: Disconnect the suction tubing from the BASS® Slide 29: To prevent spillage of any remaining fluid, carefully fold the BASS® in half Slide 30: To prevent spillage of any remaining fluid, carefully fold the BASS® in half Slide 31: Fold in half again Slide 32: Then, fold in half a third time Slide 33: Hold open ends of the BASS® upright and dispose per hospital protocol Slide 34: 1-800-214-9084 For your convenience BASS® Medical offers toll-free clinical support Slide 35: Patents Pending Made In USA (800) 214-9084 BASS Medical, Inc. 2539 John Hawkins Parkway Suite 101 Birmingham, AL 35244 For more information about the BASS® Fluid Control System call: You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
bass in-service bassmedical2011 Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 17 Category: Product Traini.. License: All Rights Reserved Like it (0) Dislike it (0) Added: March 21, 2011 This Presentation is Public Favorites: 0 Presentation Description Learn how to keep your OR floors dry with the BASS®. The SOLUTION for the fluid on the floor problem. Comments Posting comment... Premium member Presentation Transcript Slide 1: Solving the “fluid on the floor problem” with the BASS® Directions for use Slide 2: Over the next few minutes we’ll show you how to easily store and use The BASS® Slide 3: The BASS® can be stored on the supply carts in the OR Slide 4: Unroll the BASS® after removing from plastic packaging Slide 5: Flatten and place on the floor with the batting side up Slide 6: Place the BASS® with the suction port side next to the OR table Suction ports are located on side of the BASS Slide 7: Utilize the BASS® Pre-assembled Tubing Set to connect to suction 9 foot sections 2 foot section Slide 8: The BASS® will work with standard wall suction or the Neptune Waste Management System. Wall Neptune Slide 9: First, connect clear ends of 9-foot tubing to both of the BASS® suction ports Slide 10: Slide suction tubing under the OR table towards the suction system Slide 11: If using standard wall suction, attach blue ends of 9-foot tubing to Y-connector Slide 12: And then attach blue end of 2-foot tubing to suction canister Slide 13: If using the Neptune Waste Management System, attach both blue ends of 9-foot tubing to the Neptune Slide 14: Discard the 2-foot tubing section and Y-connector Slide 15: Activate suction at highest setting Using either wall or Neptune Slide 16: When draping, position drapes so fluid drains onto the BASS® Slide 17: If using a foot pedal, place in plastic bag to facilitate easier movement of pedal on the BASS® Slide 18: Mayos and gurneys may be rolled near the BASS® Slide 19: ..or they can roll onto the BASS® Slide 20: They can even be placed under the BASS® Slide 21: Stools will also roll easily onto the BASS® Slide 22: Up to three people can stand on the BASS® simultaneously Slide 23: Up to three people can stand on the BASS® simultaneously Slide 24: The BASS® collects, contains, and eliminates fluids during surgery Slide 25: Even without suction operating, the BASS® will hold 15 liters of fluid Slide 26: Over 40 liters of fluid have been collected in one procedure with suction Slide 27: Cleaning up after using the BASS® Slide 28: Disconnect the suction tubing from the BASS® Slide 29: To prevent spillage of any remaining fluid, carefully fold the BASS® in half Slide 30: To prevent spillage of any remaining fluid, carefully fold the BASS® in half Slide 31: Fold in half again Slide 32: Then, fold in half a third time Slide 33: Hold open ends of the BASS® upright and dispose per hospital protocol Slide 34: 1-800-214-9084 For your convenience BASS® Medical offers toll-free clinical support Slide 35: Patents Pending Made In USA (800) 214-9084 BASS Medical, Inc. 2539 John Hawkins Parkway Suite 101 Birmingham, AL 35244 For more information about the BASS® Fluid Control System call: