NUCLEAR POWER PLANT Dr Varaprasada Rao

Views:
 
Category: Education
     
 

Presentation Description

No description available.

Comments

By: saibharadwaj (93 month(s) ago)

good ppt

By: farooqsiddiqui (97 month(s) ago)

plz sir give me permission to download ppt.

Presentation Transcript

NUCLEAR POWER PLANT AND ITS IMPORTANCE IN INDIA:

NUCLEAR POWER PLANT AND ITS IMPORTANCE IN INDIA Dr. Manda Varaprasada Rao Under the able guidance of Dr. K Venkata Subbayya

CONTENTS:

CONTENTS Introduction Nuclear reaction Nuclear fission process Nuclear chain reaction Constituents of Nuclear power plant Nuclear Reactor(Main parts) Types of power reactors commonly used Nuclear energy deal in India

World Production of Electricity by the Fuel in 2002::

World Production of Electricity by the Fuel in 2002:

Nuclear Power Plants in India:

Nuclear Power Plants in India

Nuclear Reaction:-:

Nuclear Reaction:- A projectile is taken Mass-Energy conversion acc. to Einstein’s equation

Nuclear Fission process:-:

Nuclear Fission process:- In this process heavy nucleus is splitted and release high energy 1 fission of U-235 causes 230 mev energy

Nuclear chain Reaction :

Nuclear chain Reaction When a neutron hits a U-235 3 neutrons produced “Chain reaction is defined as a fission reaction where neutron from the previous reaction continue to propagate and repeat the reaction”

Constituents of Nuclear power plant and layout:

Constituents of Nuclear power plant and layout

Nuclear Reactor:

Nuclear Reactor Main parts:- 1.Reactor core 2.Moderator 3.Control rods 4.Coolant 5.Reflector 6.Thermal shielding

Power Reactors in common use:

Power Reactors in common use Boiling water Reactor(BWR) Pressurized water Reactor(PWR) Heavy water cooled and moderated(CANDU TYPE) Reactor Gas Cooled Reactor Liquid metal cooled Reactor

1.Boiling Water Reactor:

1.Boiling Water Reactor Fuel used is rich in uranium oxide. Ordinary water is used as both moderator and coolant. Low thermal efficiency. Can’t meet sudden increase of load.

Basic Diagram of a BWR:

Basic Diagram of a BWR

A BWR in Practice:

A BWR in Practice

Boiling Water Reactor Nuclear Power Plant:

Boiling Water Reactor Nuclear Power Plant A reactor behaves in a similar manner. As the reactor water is boiled, its volume increases, and the steam escapes at high speed through the outlet piping. The piping is designed so the steam strikes the cups on the turbine wheel; the wheel spins and its shaft turns the copper coil in the electrical generator.

2: Pressurized Water Reactor(PWR):

2: Pressurized Water Reactor(PWR) Advantages: Compactness Isolation of radio active system from main steam system Cheap light water used as both moderator and coolant Disadvantages: Strong pressure vessel is required Formation of low temp. steam High losses from heat exchanger High power consumption from auxilarities

Basic Diagram of a PWR:

Basic Diagram of a PWR

A PWR in Practice:

A PWR in Practice

3.Heavy Water Cooled and Moderated (CANDU Type) Reactor:

3. Heavy Water Cooled and Moderated (CANDU Type) Reactor

Description of CANDU type reactor:

Description of CANDU type reactor It makes use of heavy hydrogen isotope (H 1 2 ) as moderator Primary and secondary cicuits are similar to PWR It’s very expensive to separate Control rods are not required It has high multiplication factor and low level fuel consumption

Advanced Reactor Designs Under Consideration:

Advanced Reactor Designs Under Consideration GE-Hitachi ABWR – NRC Certified (1997) Westinghouse AP1000 – NRC Certified (2005) GE-Hitachi ESBWR – Under NRC Review AREVA US-EPR – Under NRC review Mitsubishi US-APWR – Under NRC Review

Benefits of Advanced Reactor Designs:

Benefits of Advanced Reactor Designs Standardization Simpler and Safer Large scale power production Operating or under construction elsewhere

Indian Nuclear Program: The Present Status:

Indian Nuclear Program: The Present Status 12 PHWR & 2 BWR now under operation 4 PHWR and 2 LWR under commission 2950 MW generation & 3000 MW under commission Successful experiments with Fast Breeder Test Reactor (FBTR) Prototype Fast Breeder Reactor (PFBR) for 500MWe under construction Advanced Heavy Water Reactor (AHWR) using (Pu-Th) O2 MOX for 300MWe: advanced stage of design approval; construction soon to begin.

Reactor Generations:

Reactor Generations Gen I Prototypes in 50’s & 60’s Gen II 70’s & 80’s Today’s Operational Reactors BWR, PWR, CANDU, … Gen III ABWR, APWR Approved 90’s Some Built around the World Gen III+ Current Advanced Designs in the Approval Process Pebble Bed Reactor Gen IV Deploy in 2030 Economical Safe Minimize Waste Reduce Proliferation

MAKING INDIA A NUCLEAR POWER:

MAKING INDIA A NUCLEAR POWER India 1948:- It was pt. Jawaharlal Nehru initiated India’s Nuclear energy program India 1967:- It was Indira Gandhi initiated India’s Nuclear weapons program

INDIA AFTER 2000:

INDIA AFTER 2000 India 2005:- It was Dr. Manmohan Singh signed 123 agreement. India 2009:- Manmohan Singh is again interested to increase India’s civilian Nuclear energy India has signed “Civil Nuclear Trade Agreement”.

THANK YOU:

THANK YOU