logging in or signing up 2011 WPS BOND SLIDESHOW thetysonwynn Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 132 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: March 21, 2011 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Welch Public Schools Bond Proposal: Welch Public Schools Bond ProposalElection April 5, 2011: Election April 5, 2011 Passage of this bond issue WILL NOT RAISE TAXESProposal: Proposal $2.75 million bond issue Addition of 6 classrooms Expansion of cafeteria and kitchen Updating/renovation of elementary and high school building HV/AC Updating/renovation of elementary and high school building fluorescent lightingSlide 6: The Middle School Building Addition will add 9,744 square feet of area to the existing structureBenefits of Middle School Facility: Benefits of Middle School Facility Separation of 6 th grade students from younger, elementary students Separation of 7 th /8 th grade students from older, high school students Area for age appropriate instructionCreation of a Middle School: Creation of a Middle School By moving the 6 th grade out of the elementary Kindergarten classes now held in 20-year-old portable buildings will be relocated in the main elementary building Pre-K students will also be relocated in the main elementary building Provides improved Pre-K and Kindergarten learning environmentPre-K and Kindergarten Currently in Portable Buildings: Pre-K and Kindergarten Currently in Portable BuildingsSlide 10: PORTABLE BUILDING CLASSROOMSMiddle School Concept: Middle School Concept By moving the 7 th and 8 th grade out of the high school Three classrooms will be converted to a much needed computer lab, math classroom, and commons area High School commons area will improve school climateSlide 12: High School Math Classes Held in Storage AreaSlide 13: Computer lab needed for mandated on-line testing Computer lab will provide increased accessibility to technology throughout the school dayCommons Areas : Commons Areas High school and middle school commons areas will provide space for students to gather outside of class High school and middle school commons areas will be centrally locatedCafeteria Expansion: Cafeteria Expansion Will add 1,170 square feet to the dining area Will alleviate crowding during meal time with additional seatingExisting Cafeteria is at Capacity: Existing Cafeteria is at CapacityKitchen Expansion/Renovation: Kitchen Expansion/Renovation Will increase kitchen area to 1020 square feet Will improve meal preparation Will improve serving capacityProposal Will Increase Serving Capacity: Proposal Will Increase Serving CapacityHV/AC Renovation: HV/AC Renovation Will improve learning environment in elementary and high school buildings Elementary and High school buildings’ HV/AC is old and inefficient New HV/AC will save thousands of dollars in utility and maintenance costsInefficient Air Handlers: Inefficient Air HandlersLighting Renovation: Lighting Renovation Will Improve learning environment in elementary and high school buildings Will reduce electric consumption and maintenance costsImproved Lighting = Improved Learning Environment: Improved Lighting = Improved Learning Environment2009-2010 Electric Cost: 2009-2010 Electric Cost Secondary Bldg $27,452 30,000 sq. ft. Elementary Bldg $11,241 20,000 sq. ft. TOTAL $38, 693 20% reduction $7,738 30% reduction $11,6072009-2010 Natural Gas Cost: 2009-2010 Natural Gas Cost District $14,968 20% reduction $2,993FY 2009-FY2011 Maintenance Cost: FY 2009-FY2011 Maintenance Cost Boiler $8,376 HV/AC $13, 234 Total $21,610 or $7,203 per yearProposal: Proposal $2.75 million bond issue Addition of 6 classrooms Expansion of cafeteria and kitchen Updating/renovation of elementary and high school building HV/AC Updating/renovation of elementary and high school building fluorescent lightingElection April 5, 2011: Election April 5, 2011 Passage of this bond issue WILL NOT RAISE TAXES You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
2011 WPS BOND SLIDESHOW thetysonwynn Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT lite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 132 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: March 21, 2011 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Welch Public Schools Bond Proposal: Welch Public Schools Bond ProposalElection April 5, 2011: Election April 5, 2011 Passage of this bond issue WILL NOT RAISE TAXESProposal: Proposal $2.75 million bond issue Addition of 6 classrooms Expansion of cafeteria and kitchen Updating/renovation of elementary and high school building HV/AC Updating/renovation of elementary and high school building fluorescent lightingSlide 6: The Middle School Building Addition will add 9,744 square feet of area to the existing structureBenefits of Middle School Facility: Benefits of Middle School Facility Separation of 6 th grade students from younger, elementary students Separation of 7 th /8 th grade students from older, high school students Area for age appropriate instructionCreation of a Middle School: Creation of a Middle School By moving the 6 th grade out of the elementary Kindergarten classes now held in 20-year-old portable buildings will be relocated in the main elementary building Pre-K students will also be relocated in the main elementary building Provides improved Pre-K and Kindergarten learning environmentPre-K and Kindergarten Currently in Portable Buildings: Pre-K and Kindergarten Currently in Portable BuildingsSlide 10: PORTABLE BUILDING CLASSROOMSMiddle School Concept: Middle School Concept By moving the 7 th and 8 th grade out of the high school Three classrooms will be converted to a much needed computer lab, math classroom, and commons area High School commons area will improve school climateSlide 12: High School Math Classes Held in Storage AreaSlide 13: Computer lab needed for mandated on-line testing Computer lab will provide increased accessibility to technology throughout the school dayCommons Areas : Commons Areas High school and middle school commons areas will provide space for students to gather outside of class High school and middle school commons areas will be centrally locatedCafeteria Expansion: Cafeteria Expansion Will add 1,170 square feet to the dining area Will alleviate crowding during meal time with additional seatingExisting Cafeteria is at Capacity: Existing Cafeteria is at CapacityKitchen Expansion/Renovation: Kitchen Expansion/Renovation Will increase kitchen area to 1020 square feet Will improve meal preparation Will improve serving capacityProposal Will Increase Serving Capacity: Proposal Will Increase Serving CapacityHV/AC Renovation: HV/AC Renovation Will improve learning environment in elementary and high school buildings Elementary and High school buildings’ HV/AC is old and inefficient New HV/AC will save thousands of dollars in utility and maintenance costsInefficient Air Handlers: Inefficient Air HandlersLighting Renovation: Lighting Renovation Will Improve learning environment in elementary and high school buildings Will reduce electric consumption and maintenance costsImproved Lighting = Improved Learning Environment: Improved Lighting = Improved Learning Environment2009-2010 Electric Cost: 2009-2010 Electric Cost Secondary Bldg $27,452 30,000 sq. ft. Elementary Bldg $11,241 20,000 sq. ft. TOTAL $38, 693 20% reduction $7,738 30% reduction $11,6072009-2010 Natural Gas Cost: 2009-2010 Natural Gas Cost District $14,968 20% reduction $2,993FY 2009-FY2011 Maintenance Cost: FY 2009-FY2011 Maintenance Cost Boiler $8,376 HV/AC $13, 234 Total $21,610 or $7,203 per yearProposal: Proposal $2.75 million bond issue Addition of 6 classrooms Expansion of cafeteria and kitchen Updating/renovation of elementary and high school building HV/AC Updating/renovation of elementary and high school building fluorescent lightingElection April 5, 2011: Election April 5, 2011 Passage of this bond issue WILL NOT RAISE TAXES