PLM- Presentation

Insert YouTube videos in PowerPont slides with aS Desktop
Views:
 
Category: Entertainment
     
 

Presentation Description

No description available.

Comments

Presentation Transcript

FORTUNE Technologies Maritime Add-On : 

FORTUNE Technologies Maritime Add-On George Marinakis – Sales Director

Top Industry Issues : 

Top Industry Issues “Administrative and Financial Benefits” “Managing compliances” “Valid synchronization” “Customer ROI and product efficiencies ” User friendly interface Rich functionality Effective maintenance system with High Adaptability Rich Value and Low-cost Labor Safety and Product Safety Safety regulations to protect the workers Environmental issues Standard integration tools for electronic exchange Enough flexibility to meet the varying needs between vessels and office Integrated Control Warranties and contracts

The Challenge : 

The Challenge

Slide 4: 

User friendly interface Outlook User Interface that it is easy to learn, plan, monitor, record and report all the PLM activities

Slide 5: 

Rich Functionality Rich functionality with Time saving Planer

Slide 6: 

High adaptability User Customizable reports.

Slide 7: 

The Rich Value Proper Document Control AND User Customizable Check List Forms with strong validation rules

Low Costs : 

Low Costs

Slide 9: 

Managing compliances User-defined KPI’s and alerts based on TMSA requirements

Slide 10: 

Valid synchronization Enough flexibility to meet the varying needs between vessels and office Standard integration tools for electronic exchange

Slide 11: 

The Integrated Control Vessel Specific preventive Maintenance All maintenance work carried out on board, whether planned or unplanned, condition based or cosmetic work is reported to the office. The superintendent should acknowledge that the maintenance report has been read and checked and the vessel’s Master and Chief Engineer should be aware that their reports have been read. The maintenance report is available to the superintendent for checking and review as soon as possible after the maintenance task has been completed. A typical scenario based on Fortune Maritime Add-On

Slide 12: 

Advance Reporting Advance reporting [Overdue Jobs Analysis/Important Equipment/ Vessel ]

The Unique architecture : 

The Unique architecture ExternalApplications BusinessPartners Employees ApplicationServer GUI (Windows) CommercePortal Commerce Gateway (B2B) Country-specific Objects Shipping Solutions Objects Worldwide Generic Objects Client-specific Objects Integrated Development Environment Microsoft SQLServer 2000 Microsoft Navision Database Server Database

The Biggest ‘Ecosystem’ : 

The Biggest ‘Ecosystem’

Slide 16: 

Business applications critical to deliver customer value Relating to customer role and value proposition Big breakthroughs ahead Software is the key element

Slide 17: 

© 2005 Fortune Technologies S.A. All rights reserved. This presentation is for informational purposes only. Fortune makes no warranties, express or implied, in this summary. Expand your FORTUNE