Slide 4:
Data Absensi Karyawan IST 2009 - 2010 Persentasi Kehadirian (Attendance Rate) Alasan Ketidakhadiran (Un-attendance Reasons)
Slide 6:
Laporan bualan Mei terhitung dari tgl 1 Mei – 20 Mei 09
Slide 7:
“ZERO” PTOMAINE POISONING
Slide 8:
1. SAFETY WORK FY 2009 IST Administration Dept. Action Plan = Plan = Actual Trial ,RA, Standardization NC2 + Process Pending Factory 1 Identifity Re RA Standardization RA 7 Points 5 Out Standing RA Truck – B RA Level A Pending Urgent Case RA Standardization Equipment Form Complain Survey Catering Disnaker RA Truck – B RA Level A Pending UP Date & Listing
Slide 9:
2. BUILD UP STRENGTH WITH REDUCING PROBLEMS Stock Card Scalingt Prepare Project Team Report Activity Possibility CA Identification PIC Daily Stocking Material , Safety Status Review Forecast CMWI, Safety Level Set Up Min Max Level Mieruka of (Inalum, TTC) Listing slow moving, Set Up Format Mieruka Slow Term / Long Term, Control Facility System Direct / Indirect Purchasing, Supplier Evaluation
Slide 10:
2. BUILD UP STRENGTH WITH REDUCING PROBLEMS 3. DEVELOPMENT OF HUMAN RESOURCES Updating New Regulation Support Data Prepare Kotak Saran Prepare Family Gathering Control Internal & External Training Making & Socialization have done Control& Scheduling Control & Scheduling Control & Scheduling Set Up Regulation
Slide 11:
PGA Section Activity Plan 2009 Evaluation Study = Plan = Actual Improvement Evaluation Study Evaluation Study Evaluation Study Evaluation Study Evaluation Study Evaluation Study Evaluation Study Evaluation Study Monitoring & Continues Improvement Evaluation Study Evaluation Study Improvement Monitoring & Continues Improvement Evaluation Study Evaluation Study Evaluation Study Evaluation Study