THE REVAMPING OF COMPUTERIZED CHECK POST OF 10, RTO CHECK POSTS IN THE STATE OF GUJARAT

INDEX:

INDEX Preamble Action plan Detail study-report of static weigh bridges Detail study-report of SIPCA – systems AND IP-Based cctv systems Software modifications AND Networking. Feasibility Study of Integrated Checkpost AND Electronic Integration with Other Checkposts

Implementation Of Modern Toll collection Systems. :

Implementation Of Modern Toll collection Systems. Covering : Toll Audit Systems. Vehicle Classification Systems Licence Plate Recognisation Systems Introduction Of Prepaid SMART_CARD Systems. Vehicle Height Detection Systems.

A C T I O N P L A N:

A C T I O N P L A N Replacement/major repair of all weigh bridges Up gradation of all old PCS into PIV configuration. Replacement of SIPCA-system by using IP-based CCTV system. Up gradation of software.

A C T I O N P L A N:

A C T I O N P L A N Changing the Main Lighting Distribution Boards. Changing the DG-Set and going for Higher Capacity including lighting loads. Installation of High Mast in place of street light poles. Automatic Opening & Closing of Barriers with the introduction of interface cards. Integration of Data & Video at check-post level and transmitting the same as a single file .

Detail study-report of Static Weighbridges:

Detail study-report of Static Weighbridges Static weighbridge in all check posts are Electronic Load cell based and installed on weighing platform consisting of steel materials,subjected to wear and tear. The summary of report of the performance of RTO Check posts weighbridges is as under: 58 weighbridges installed in various RTO Check posts of Gujarat. In 7 weighbridges where normally Bus/Car is being used, no abnormality in these weighbridges are reported. In 27 weighbridges, following rectification work is done. Cross beam rectification work at 5/10 places is done.

PowerPoint Presentation:

In the main ISMB, crack rectification work is done. In the main beam, crack rectification work is done. In some cases structure is totally replaced. In 11 weighbridges, major rectification work is done as under: In the cross beam and deck plates at more than 10 places rework/replacement work done. All the cross beams, transverse beams, deck plates replacement work is done and platform replacement work is necessary. In the main ISMB at 3/5 places crack rectification work done.

Conclusion: Excepting, the weighbridges used for car / bus, the condition in almost all other weighbridges repair / replacement work is done. Immediate replacement of atleast 12 Nos. weighbridges is required. :

Conclusion : Excepting, the weighbridges used for car / bus, the condition in almost all other weighbridges repair / replacement work is done. Immediate replacement of atleast 12 Nos. weighbridges is required.

Recommendation: All the weighbridges which are used for trucks (84%) needs replacement in phased manner. Atleast 12 Nos. are required to be replaced immediately:

Recommendation : All the weighbridges which are used for trucks (84%) needs replacement in phased manner. Atleast 12 Nos. are required to be replaced immediately

Detail study report of SIPCA system AND IP - Based CCTV Systems :

Detail study report of SIPCA system AND IP - Based CCTV Systems At each of the check posts, a multilane approach road has been built and a video camera has been positioned. The video capture and transmit process SIPCA Flash bus-mvcard were not functioning. It is now obsolete. New flash bus – spectrim is introduced .The system being put into operation. Today IP based CCTV system is proven and eliminates need of SIPCA system. This will require replacement of present non-IP based CCTV system into IP based CCTV system.

IP BASED CCTV SYSTEM:

IP BASED CCTV SYSTEM Introduction of 2/4 dome cameras at all check posts. Features of IP based cctv systems View record and playback video Flexibility to transmit anything anywhere to anyone over IP Efficiency by recording at the edge Digital recording for convenience and responsiveness Uninterrupted recording during scheduled and unscheduled network downtime

Software modifications and Networking :

Software modifications and Networking The details of present set of software is as under: Windows NT- operating systems for all servers. Oracle – 8 i workgroup server RDBMS at the check post. Oracle enterprise server for CMC (HO)` Visual basic front end development tools. Since the software development is the same from the inception of the project, it is very old. Lot of patches in oracle – Backend tool is available, it should be installed. Also different types of new report generation can be made. Since we have been operative system since long, our new requirements of reports can be worked out and be implemented.

PowerPoint Presentation:

The present employed software modules / development of software is as under: Daily collection - Consolidated Daily collection - Check post wise Daily collection - Cash Penalties - Overweight Invalid permit / No permit Other Dept. actions Storage & retrieval of video images in the video server and back up device. Periodic and automatic updating of all data from check post to CMC (HO)

Networking :

Networking Each check post is connected to HO (CMC) using 64 kbps leased line. However it is proposed to use 2MbPS leased line / satellite communication V Sat / GSWAN. The present networking is employed as under: Networking components / WAN AMP multimode armoured fibre optic cable at all the check post. D – link Transceivers for connection to hubs. D – link Hubs at the check posts. CISCO 850 Routers at all check posts. CISCO 260 Routers at CMC (HO) for termination of all the incoming lines from the check posts. RAD ASM 31 Leased line modems 20 pairs.

Implementation of Modern Toll Collection System:

Implementation of Modern Toll Collection System With the present status of the state of the Art technology, lot of development in the field of road traffic technology have been taken place. In order to get idea about the new technology, details of following systems is enclosed. Toll audit system Vehicle classification systems. License plate recognition system Introduction of prepaid ‘SMART CARD’ Vehicle height detection systems.

Integrated check post AND Electronic Integration with Other check Posts :

Integrated check post AND Electronic Integration with Other check Posts All concerned officers/staff of various Government departments will sit under one roof in the check post building and will carry out their respective duties Also the data in respect of these commercial vehicles will be shared by all such check posts in the state. Following Depts. Can be integrated. Transport. Home. Commercial Taxation. Forest. Excise. Electronic Integration with other check post is useful for tracking the specific vehicle violated for penalty. It also help other departments like police to keep the fraud personnel/vehicle.