Tudor Oaks Redevelopment : 

Tudor Oaks Redevelopment January 2010 – June 2011

Groundbreaking October 8, 2008 : 

Groundbreaking October 8, 2008

Slide 3: 

Construction Trailers and some “Stuff” Arrive in December 2009 First material delivery - January 2010

Slide 4: 

This piece of equipment is located in the middle of what is now the Dining Room

Slide 6: 

During January 2010 many changes begin to take place both inside and outside.

Slide 7: 

What’s behind the new door?

Slide 8: 

A lot is changing behind the new door

Slide 9: 

You are standing where the Reception Desk is now located

Slide 10: 

The basement is a mess!!

Slide 11: 

The interior of the wings are gutted ----

Slide 12: 

--- then reframed for the new apartments.

Slide 13: 

Preparing for removal of the end of Elm wing

Slide 14: 

Preparing for removal of the end of Elm wing The Roof is Cut!!

Slide 15: 

This activity attracted a BIG crowd

Slide 18: 

And the walls came tumbling down!

Slide 19: 

And the walls came tumbling down!

Slide 20: 

And the walls came tumbling down!

Slide 21: 

Digging for first dining room footings

Slide 22: 

Pour Baby Pour

Slide 24: 

New walls start to appear

Slide 25: 

Lots of New Walls

Slide 27: 

Outside work requires moving a lot of dirt

Slide 29: 

Wet, heavy clay is everywhere

Slide 30: 

Footing are dug and poured

Slide 31: 

The unexpected happens but work continues.

Slide 36: 

Installing drainage line. The line ends in the new retention pond.

Slide 39: 

The Reflection Pond area is about one acre in size.

Slide 43: 

Many dumpster loads required to carry away the debris.

Slide 44: 

Construction of the new additions has started.

Slide 50: 

Resident activities continue.

Slide 51: 

The old dining room remained functional. Residents never missed a meal!!!

Slide 52: 

Work on the new dining room moves into high gear.

Slide 53: 

Support girders for the new dining room roof are set in place.

Slide 54: 

Progress of The Oak Ridge Room (i.e. Dining Room)

Slide 56: 

New Kitchen is Operational July 20, 2010

Slide 57: 

The Food had to be carried a long way to the old dining room.

Slide 58: 

The Oak Ridge Room Opens for Dinner on November 9, 2010

Slide 59: 

Work on the Elm Wing is moving at a fast pace.

Slide 62: 

Setting garage roof supports Elm Wing April 19, 2010 Setting garage roof supports Elm Wing April 19, 2010

Slide 63: 

Setting garage roof supports Elm Wing April 19, 2010 Setting garage roof supports Elm Wing April 19, 2010

Slide 64: 

Setting garage roof supports Elm Wing April 19, 2010 Setting garage roof supports Elm Wing April 19, 2010

Slide 65: 

Setting garage roof supports Elm Wing April 19, 2010 New Apartments are added Above the new garages.

Slide 66: 

Activity all around the campus

Slide 67: 

Activity all around the campus

Slide 68: 

Activity all around the campus

Slide 72: 

The residents were anxious to see the progress

Slide 73: 

Work begins on the new front entrance.

Slide 74: 

The new front entrance begins to take final shape

Slide 80: 

A New Greenhouse Takes Shape

Slide 81: 

A New Greenhouse Takes Shape

Slide 82: 

A New Greenhouse Takes Shape

Slide 83: 

Very Tricky Footing

Slide 84: 

The Greenhouse is Fully Operational. June 28, 2011

Slide 85: 

Old Commons Getting a New Look

Slide 86: 

The pool is a big attraction

Slide 87: 

Some can hardly wait for the pool to be finished.

Slide 89: 

There was always activity going on outside

Slide 91: 

The Community Square takes shape

Slide 92: 

The End of Construction Is in sight

Slide 94: 

The New Tudor Oaks