Participation in Releted Projects:
Participation in Releted Projects Recently Finished
COST 266
IKTA – VoIP
ETIK PaFliNet
Current (in 2005)
IP Nobel Next generation Optical network for Broadband European Leadership, http://www.ist-nobel.org/
(IP MUSE) Access Networks
NoE e-Photon/ONe Network of Excellence Optical Networks: Towards Bandwidth Manageability and Cost Efficiency http://www.e-photon-one.org
COST291 – TDON Towards Digital Optical Networks
COST293 – GRAAL Graphs and Algorithms in Communication Networks
CELTIC PROMISE PROvisioning and MonItoring of optical SErvices http://www.ist-nobel.org/
ETIK LEMON Egyetemközi Távközlési és Informatikai Központ: Library of Efficient Models and Optimization in Networks https://lemon.cs.elte.hu/
NKFP STREAMING
ETIK ProgNet
Future (Hopefully :) (starting in 2006)
STREP PROPEL
IP NOBEL II
NoE e-Photon/ONe II
Participation in Releted Projects:
Participation in Releted Projects Recently Finished
COST 266
IKTA – VoIP
ETIK PaFliNet
Current
IP Nobel Next generation Optical network for Broadband European Leadership, http://www.ist-nobel.org/
(IP MUSE) Access Networks
NoE e-Photon/ONe Network of Excellence Optical Networks: Towards Bandwidth Manageability and Cost Efficiency http://www.e-photon-one.org
COST291 – TDON Towards Digital Optical Networks
COST293 – GRAAL Graphs and Algorithms in Communication Networks
CELTIC PROMISE PROvisioning and MonItoring of optical SErvices http://www.ist-nobel.org/
ETIK LEMON Egyetemközi Távközlési és Informatikai Központ: Library of Efficient Models and Optimization in Networks https://lemon.cs.elte.hu/
NKFP STREAMING
ETIK ProgNet
Future (Hopefully :)
STREP PROPEL
IP NOBEL II
NoE e-Photon/ONe II
Our COST 291 Contributions:
Our COST 291 Contributions WG1 Physicl Layeyr/ optical Signal Processing
Dynamic Management of physical impairments (Zsigmond, Megyer, Szödényi)
Optical Signal Processing
Access 1 and 10 GbE
WG2 Architectures and Transport schemes
Wavelength routing
OPS/OBS PerfEval, Architectures etc.
Optical infrastructure for GRID
WG3 Unified CP, Resileinece and security
Availability analysis
Survivability
GRID services
We announced our interest in WG 2 & WG 3 (WG1/1 will be part of WG2/1)
STSM: May 2005 to Athens
Funding of COST 291 presentations (dissemination)?