Share PowerPoint. Anywhere!

properplans

Uploaded from authorPOINT Lite
Download as Download Not Available PPT
Presentation Description

No description available

Views: 6
Like it  ( Likes) Dislike it  ( Dislikes)
Added: February 11, 2008 This presentation is Public
Presentation Category :Entertainment
Tags Add Tags
Presentation StatisticsNew!
Views on authorSTREAM: 5 | Views from Embeds: 1
Others - 1 views
Presentation Transcript

Slide1 : Enhancement of environment through utilisation of industrial waste By enhancing the production of Portland Pozzalona Cement from 30,000 to 90,000 tonnes per annum the quantity of fly ash utilisation will increase resulting in reduction of energy consumption and also emission of CO2. An Energy Conscious & Environment Friendly Organisation FUTURE PLANS


Slide2 : Enhancement of installed capacity Keeping in view the rapid growth of infrastructure essential for the country’s economic development an increase in installed capacity is planned. Increasing the capacity of the present plant from 2.6 million tonnes per annum to 3.0 million tonnes per annum by de-bottlenecking Putting up a third plant at Ras of 1.5 million tonnes. This will also help generate employment to help the economic growth of the nearby villages as well as the state. An Energy Conscious & Environment Friendly Organisation


Slide3 : Technical Developments/up-gradations Shri Bangur’s efficiency has become a habit for Shree Cement’s employees too. Thus latest technologies have been implemented. It is thus proposed to implement the following. Conversion of first Stage pre heater twin cyclone to triplet cyclone in unit 2. Conversion of 4th stage conventional cyclone to LP cyclone in preheater-1. Up-gradation of cement mill –1 with roller press material. Close circuiting of cement mill-2. Installation of multi channel burner in Kiln-1 in place of Uniflow burner. .Installation of new smaller raw mill for grinding reject material from raw mill –1 for upgradation of production. .Radiation pyrometer and kiln surface pyrometer for brick management system for both the units. Up-gradation of kiln drives for unit-1 to increase RPM from 3.6 to 4.75. Replacement of mechanical packers with electronic packers. .Replacement of existing dynamic separator of coal mill-2 with high efficiency dynamic separator. .Installation of pre-combustion chamber in unit-1. .Modification of kiln hood in unit-2. An Energy Conscious & Environment Friendly Organisation


Slide4 : Integration of management system and adoption of occupational health and safety system ISO-18001. Already being an ISO-9001 and ISO-14001 company we are striving to achieve ISO-18001 certificate for health and safety. SHREE management system will be formulated by integration of all these systems. An Energy Conscious & Environment Friendly Organisation