logging in or signing up abstract81 strong presentation Teodora Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 172 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: February 20, 2008 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Air and Ozone Sparging of TCE Using a Directionally Drilled Horizontal WellSite 86, Camp Lejeune: Air and Ozone Sparging of TCE Using a Directionally Drilled Horizontal Well Site 86, Camp Lejeune Mark Strong, P.E. CH2M HILL Christopher Bozzini, P.E. CH2M HILL Daniel Hood, NAVFAC Mid-Atlantic Bob Lowder, MCB Camp Lejeune EMDCamp Lejeune Background: Camp Lejeune Background Second largest U.S. Marine Corps Base in the Country Camp Lejeune was established near the city of Jacksonville, N.C, in 1942. Base covers 236 square miles CERCLA site since 1989 22 Operable Units (OUs), 97 Sites.Site Location and History: Site Location and History Site 86 is associated with three former waste oil ASTs, used during the 70s and 80s Over the course of several investigations since 1992, the solvent plume migrated away from the source area and now extends several hundred feet off-site Bld. 25Pilot Test Objectives: Pilot Test Objectives Prevent further migration of the TCE plume off-site Evaluate air (and ozone) distribution using a horizontal well Determine if ozone and/or air sparging can reduce TCE impacts to below regulatory standards within one year TCE in Plume in 2002 (30-35’ bgs): TCE in Plume in 2002 (30-35’ bgs)TCE in Plume in 2002 (40-45’ bgs): TCE in Plume in 2002 (40-45’ bgs)TCE in Plume in 2002 (50-55’ bgs): TCE in Plume in 2002 (50-55’ bgs)Site 86 Cross Section: Site 86 Cross SectionDirectional Drill Rig On-Site: Directional Drill Rig On-SiteAir Sparge ‘Screen”: Air Sparge ‘Screen” 4” SDR 11 HDPE Pipe 0.020 Inch Wide Slots 0.5% Open AreaDirectional Sparge Well Layout: Directional Sparge Well Layout Total Length of Drill = 950’ Total Slotted Length - 350’Compressor and Ozone Generator Temporary Buildings (Connex Boxes): Compressor and Ozone Generator Temporary Buildings (Connex Boxes)Ozone Generator Chiller: Ozone Generator ChillerAir Compressor, Receiver, Gas Cooler: Air Compressor, Receiver, Gas CoolerOzonia Generator (CFV-03, 60 ppd, air feed) : Ozonia Generator (CFV-03, 60 ppd, air feed) Photo courtesy Ozonia North AmericaBaseline TCE Concentrations, Feb ‘05 30-35 ft bgs: Baseline TCE Concentrations, Feb ‘05 30-35 ft bgsBaseline TCE Concentrations, Feb ‘05 40-45 ft bgs: Baseline TCE Concentrations, Feb ‘05 40-45 ft bgsBaseline TCE Concentrations, Feb ‘05 50-55 ft bgs: Baseline TCE Concentrations, Feb ‘05 50-55 ft bgsSchedule: Schedule Three Months of Air Sparging (120-140 cfm) One Month of “Rebound” Monitoring Six Months of Ozone Enhanced Air Sparging (~ 7000 ppmv) Three Months of “Rebound” Monitoring (Recently Completed)Ozone Injection Performance: Ozone Injection Performance Ozone production began in late July, 2005 Intermittent operation from July to December Mechanical issues: desiccant dryer and chiller Total aggregate run time ~ 2-1/2 months (50% up time) Total mass of ozone delivered ~ 3900 poundsAverage TCE ConcentrationsZone “A” Monitoring Wells (30-35’ Screen Depth): Average TCE Concentrations Zone “A” Monitoring Wells (30-35’ Screen Depth)Average TCE ConcentrationsZone “B” Monitoring Wells (40 - 45’ Screen Depth): Average TCE Concentrations Zone “B” Monitoring Wells (40 - 45’ Screen Depth)Average TCE ConcentrationsZone “C” Monitoring Wells (50 - 55’ Screen Depth): Average TCE Concentrations Zone “C” Monitoring Wells (50 - 55’ Screen Depth)Discussion: Discussion SVE was not conducted because of low permeability overburden; trace levels of TCE measured in shallow vapor during operation (ppbv) Air was diverted horizontally by overburden; air bubbling was observed 300 feet from the well Lateral propagation of air “fingering” was estimated to be 50 feet on either side of the well, as indicated by dissolved oxygen concentrations Negligible increases in dissolved chloride from baseline levelsConceptual Model: Conceptual ModelExample Dissolved Oxygen and ORP Trend: Example Dissolved Oxygen and ORP TrendSummary of Analytical Data: Summary of Analytical DataConclusions: Conclusions 90% average reduction of TCE within three months in wells with baseline TCE > 50 μg/L 99% average reduction within one year in wells with baseline TCE > 50 μg/L No significant rebound after three months (greater than 25 µg/L) Distance of influence ~ 50 ft on both sides of the well (as indicated by DO measurements) Possible contribution of ozone to TCE mass reduction inconclusive - low TCE concentrations and limited period of operationSummary of Costs: Summary of Costs $750K Total Budget Horizontal Well, Compressed Air System, Container, Electrical ~ $250K Ozone System and Container ~ $300K Monitoring ~ $100K O&M ~ $100K You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
abstract81 strong presentation Teodora Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 172 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: February 20, 2008 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Air and Ozone Sparging of TCE Using a Directionally Drilled Horizontal WellSite 86, Camp Lejeune: Air and Ozone Sparging of TCE Using a Directionally Drilled Horizontal Well Site 86, Camp Lejeune Mark Strong, P.E. CH2M HILL Christopher Bozzini, P.E. CH2M HILL Daniel Hood, NAVFAC Mid-Atlantic Bob Lowder, MCB Camp Lejeune EMDCamp Lejeune Background: Camp Lejeune Background Second largest U.S. Marine Corps Base in the Country Camp Lejeune was established near the city of Jacksonville, N.C, in 1942. Base covers 236 square miles CERCLA site since 1989 22 Operable Units (OUs), 97 Sites.Site Location and History: Site Location and History Site 86 is associated with three former waste oil ASTs, used during the 70s and 80s Over the course of several investigations since 1992, the solvent plume migrated away from the source area and now extends several hundred feet off-site Bld. 25Pilot Test Objectives: Pilot Test Objectives Prevent further migration of the TCE plume off-site Evaluate air (and ozone) distribution using a horizontal well Determine if ozone and/or air sparging can reduce TCE impacts to below regulatory standards within one year TCE in Plume in 2002 (30-35’ bgs): TCE in Plume in 2002 (30-35’ bgs)TCE in Plume in 2002 (40-45’ bgs): TCE in Plume in 2002 (40-45’ bgs)TCE in Plume in 2002 (50-55’ bgs): TCE in Plume in 2002 (50-55’ bgs)Site 86 Cross Section: Site 86 Cross SectionDirectional Drill Rig On-Site: Directional Drill Rig On-SiteAir Sparge ‘Screen”: Air Sparge ‘Screen” 4” SDR 11 HDPE Pipe 0.020 Inch Wide Slots 0.5% Open AreaDirectional Sparge Well Layout: Directional Sparge Well Layout Total Length of Drill = 950’ Total Slotted Length - 350’Compressor and Ozone Generator Temporary Buildings (Connex Boxes): Compressor and Ozone Generator Temporary Buildings (Connex Boxes)Ozone Generator Chiller: Ozone Generator ChillerAir Compressor, Receiver, Gas Cooler: Air Compressor, Receiver, Gas CoolerOzonia Generator (CFV-03, 60 ppd, air feed) : Ozonia Generator (CFV-03, 60 ppd, air feed) Photo courtesy Ozonia North AmericaBaseline TCE Concentrations, Feb ‘05 30-35 ft bgs: Baseline TCE Concentrations, Feb ‘05 30-35 ft bgsBaseline TCE Concentrations, Feb ‘05 40-45 ft bgs: Baseline TCE Concentrations, Feb ‘05 40-45 ft bgsBaseline TCE Concentrations, Feb ‘05 50-55 ft bgs: Baseline TCE Concentrations, Feb ‘05 50-55 ft bgsSchedule: Schedule Three Months of Air Sparging (120-140 cfm) One Month of “Rebound” Monitoring Six Months of Ozone Enhanced Air Sparging (~ 7000 ppmv) Three Months of “Rebound” Monitoring (Recently Completed)Ozone Injection Performance: Ozone Injection Performance Ozone production began in late July, 2005 Intermittent operation from July to December Mechanical issues: desiccant dryer and chiller Total aggregate run time ~ 2-1/2 months (50% up time) Total mass of ozone delivered ~ 3900 poundsAverage TCE ConcentrationsZone “A” Monitoring Wells (30-35’ Screen Depth): Average TCE Concentrations Zone “A” Monitoring Wells (30-35’ Screen Depth)Average TCE ConcentrationsZone “B” Monitoring Wells (40 - 45’ Screen Depth): Average TCE Concentrations Zone “B” Monitoring Wells (40 - 45’ Screen Depth)Average TCE ConcentrationsZone “C” Monitoring Wells (50 - 55’ Screen Depth): Average TCE Concentrations Zone “C” Monitoring Wells (50 - 55’ Screen Depth)Discussion: Discussion SVE was not conducted because of low permeability overburden; trace levels of TCE measured in shallow vapor during operation (ppbv) Air was diverted horizontally by overburden; air bubbling was observed 300 feet from the well Lateral propagation of air “fingering” was estimated to be 50 feet on either side of the well, as indicated by dissolved oxygen concentrations Negligible increases in dissolved chloride from baseline levelsConceptual Model: Conceptual ModelExample Dissolved Oxygen and ORP Trend: Example Dissolved Oxygen and ORP TrendSummary of Analytical Data: Summary of Analytical DataConclusions: Conclusions 90% average reduction of TCE within three months in wells with baseline TCE > 50 μg/L 99% average reduction within one year in wells with baseline TCE > 50 μg/L No significant rebound after three months (greater than 25 µg/L) Distance of influence ~ 50 ft on both sides of the well (as indicated by DO measurements) Possible contribution of ozone to TCE mass reduction inconclusive - low TCE concentrations and limited period of operationSummary of Costs: Summary of Costs $750K Total Budget Horizontal Well, Compressed Air System, Container, Electrical ~ $250K Ozone System and Container ~ $300K Monitoring ~ $100K O&M ~ $100K