logging in or signing up 1400 FifthAve Tatlises Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 79 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: September 28, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide1: Green, Smart, AffordableFull Spectrum of New York LLC: Full Spectrum of New York LLC We believe that investment in housing in underserved communities must include the construction of infrastructure that is: energy efficient provides superior air quality utilizes renewable resources provides the digital infrastructure to empower its residents 1400 on 5th is the embodiment of this belief Green Building Tax Credit: Green Building Tax Credit Gov. Pataki Announced 1400 on 5th as one of 5 Projects to Receive GBTC Only Affordable Housing Project Only Project in Emerging Minority CommunitySlide4: Energy Reduction – Passive Approaches For reduction in energy consumption, the most cost efficient methods are passive approaches in which the architecture of the building acknowledges the physical environment.Slide5: EIFS 68.4 Deg. Surface Temp Block & Brick Cavity 59.9 Deg Thermal Analysis Condensation Potential @ 5 Deg Outdoor AirSlide6: EIFS 0 to 3.8 BTU/HR/SF Block & Brick 7.5 BTU/HR/SF to 30 Winter Heat Flux Comparison EIFS to Brick/Block Integrated Wall & Window: Integrated Wall & Window Windows and exterior walls manufactured off-site as an integrated assembly Greater quality control, cost reduction Cost of this assembly is ~$35/SF installed, vs cost of block and brick assembly ~$50/SF Slide8: Energy Reduction – Active Systems Active mechanical systems in 1400 on 5th rely on a host of heat recovery methodologies to increase their efficiency ad reduce operating costs.Geothermal Heating & Cooling: Geothermal Heating & CoolingSlide10: Domestic Hot WaterSlide11: Indoor Air Quality – Fresh Air SystemsSlide12: Programmable ThermostatsSlide13: Remote Digitally Sub-Metered ElectricitySlide14: More Green FeaturesSmart Features: Smart Features Broadband Internet access throughout building. Computerized access control and security systems Automatic Temperature Control (ATC) system Building wide digital network connects residents to the concierge, the building superintendent and retail tenant service providers. Business Center includes state-of-the art videoconferencing equipment Tenants have video access to sections of the building over the LAN State-of-the-art video surveillance throughout the building, parking lot, courtyard and along the exterior entrances to the town houses Each floor equipped with Smart Washing Machines that will be connected to the internal LAN The building's parking lot and front entrance will be controlled by Smart Access Slide16: And Affordable In a green building, the entire building is a system. Calculating ROI should not be done on a feature-by-feature basis, rather by looking at the whole system. Any resultant cost differential for the green system is recovered in less than a year. You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
1400 FifthAve Tatlises Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 79 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: September 28, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide1: Green, Smart, AffordableFull Spectrum of New York LLC: Full Spectrum of New York LLC We believe that investment in housing in underserved communities must include the construction of infrastructure that is: energy efficient provides superior air quality utilizes renewable resources provides the digital infrastructure to empower its residents 1400 on 5th is the embodiment of this belief Green Building Tax Credit: Green Building Tax Credit Gov. Pataki Announced 1400 on 5th as one of 5 Projects to Receive GBTC Only Affordable Housing Project Only Project in Emerging Minority CommunitySlide4: Energy Reduction – Passive Approaches For reduction in energy consumption, the most cost efficient methods are passive approaches in which the architecture of the building acknowledges the physical environment.Slide5: EIFS 68.4 Deg. Surface Temp Block & Brick Cavity 59.9 Deg Thermal Analysis Condensation Potential @ 5 Deg Outdoor AirSlide6: EIFS 0 to 3.8 BTU/HR/SF Block & Brick 7.5 BTU/HR/SF to 30 Winter Heat Flux Comparison EIFS to Brick/Block Integrated Wall & Window: Integrated Wall & Window Windows and exterior walls manufactured off-site as an integrated assembly Greater quality control, cost reduction Cost of this assembly is ~$35/SF installed, vs cost of block and brick assembly ~$50/SF Slide8: Energy Reduction – Active Systems Active mechanical systems in 1400 on 5th rely on a host of heat recovery methodologies to increase their efficiency ad reduce operating costs.Geothermal Heating & Cooling: Geothermal Heating & CoolingSlide10: Domestic Hot WaterSlide11: Indoor Air Quality – Fresh Air SystemsSlide12: Programmable ThermostatsSlide13: Remote Digitally Sub-Metered ElectricitySlide14: More Green FeaturesSmart Features: Smart Features Broadband Internet access throughout building. Computerized access control and security systems Automatic Temperature Control (ATC) system Building wide digital network connects residents to the concierge, the building superintendent and retail tenant service providers. Business Center includes state-of-the art videoconferencing equipment Tenants have video access to sections of the building over the LAN State-of-the-art video surveillance throughout the building, parking lot, courtyard and along the exterior entrances to the town houses Each floor equipped with Smart Washing Machines that will be connected to the internal LAN The building's parking lot and front entrance will be controlled by Smart Access Slide16: And Affordable In a green building, the entire building is a system. Calculating ROI should not be done on a feature-by-feature basis, rather by looking at the whole system. Any resultant cost differential for the green system is recovered in less than a year.