Presentation Transcript
Activity Modeling Initiatives: Activity Modeling Initiatives Ken Cervenka, P.E., AICP
North Central Texas Council Of Governments
For
AMPO Travel Modeling Work Group Meeting
Berkeley, California
September 8, 2005
“MPO Coalition”Activity Model Listserv: “MPO Coalition” Activity Model Listserv Mission Statement:
“MPO Coalition for the Examination and Advancement
of Activity-Based Models for Use in Transportation
Planning Applications”
27 MPOs (97 Million People) Are Represented
46% Of All MPO Population
34% Of Total U.S. Population
8 MPOs (34 Million People) With Some Direct Activity
Model Involvement
Activity Model ListservAnd Related Web Sites: Activity Model Listserv And Related Web Sites Listserv: Activity_Model@yahoogroups.com
MTC’s FTP Site:
ftp://198.31.87.7/pub/mtc/planning/activity_model/
NCTCOG’s “Next Generation Modeling” Page http://www.nctcog.org/trans/modeling/Next_Generation.html
TMIP’s Clearinghouse Page
http://tmip.fhwa.dot.gov/clearinghouse/browse/
TRB Initial “State Of The Practice” Survey Results: MPOs Considering Activity/Tour Models: TRB Initial “State Of The Practice” Survey Results: MPOs Considering Activity/Tour Models MPOs < 200,000 Population
22% (Of 100 Responses)
MPOs From 200,000 To 1,000,000 Population
21% (Of 63 Responses)
MPOs Over One Million Population
43% (Of 28 Responses)
Known Activity-BasedModeling Work (Slide 1): Known Activity-Based Modeling Work (Slide 1) SACOG (Sacramento Area Council Of Governments)
Phase 1 Development Underway
Consultant Team = John Bowman and Mark Bradley
DRCOG (Denver Regional Council Of Governments)
Consultant’s Scope Of Work, Budget, And Schedule Are
Being Finalized
Prime = Cambridge Systematics
Known Activity-BasedModeling Work (Slide 2): Known Activity-Based Modeling Work (Slide 2) NYMTC (New York Metropolitan Transportation
Council)
Recently Used For AQ Conformity Analysis Work
Performing Sensitivity Tests On Value Of Time
At Contractual Stage For Sensitivity Tests By Local University
Known Activity-BasedModeling Work (Slide 3): Known Activity-Based Modeling Work (Slide 3) MORPC (Mid-Ohio Regional Planning Commission,
Columbus)
Used For AQ Conformity And All Roadway/Transit Studies
Some Refinements By Original Developer (PB Consult) Underway
AECOM Hired To Review Readiness For New Starts DEIS
Ohio DOT Staff (Rebekah Anderson) Is (Temporarily) Helping
The MPO Out, As They Look For A New Modeler
Known Activity-BasedModeling Work (Slide 4): Known Activity-Based Modeling Work (Slide 4) Ohio DOT Developing Statewide Tour-Based Model
Prime Consultant = Parsons Brinckerhoff
8-Year Development Program
$6 Million For Data Collection And $2.5 Million For The
Consultant’s Model Development
Interim Model Completed Two Years Ago
Final Model Scheduled For 2006/2007 Completion
Known Activity-BasedModeling Work (Slide 5): Known Activity-Based Modeling Work (Slide 5) Other Statewide Models With Some Tour-Based Elements
New Hampshire
Michigan
Oregon (Calibration Under Way)
Known Activity-BasedModeling Work (Slide 6): Known Activity-Based Modeling Work (Slide 6) San Francisco County Model Actively Used Since 2002
Billy Charlton, Principal Transportation Planner
MTC (Metropolitan Transportation Commission)
$250,000 Consultant Contract For Phase 1
Travel Model Specifications
Trip Chaining Procedures
Model Estimation Training
On-Call Model Estimation Oversight
Model Implementation Support
Known Activity-BasedModeling Work (Slide 7): Known Activity-Based Modeling Work (Slide 7) Portland Metro (Oregon), In-House Development
Used For Pricing Scenarios in 1998/1999
Full Calibration/Validation Was Not Completed
TRANSIMS-Portland
U.S. DOT-Sponsored Development/Testing
Major Consultant Involvement
Expected Completion In 2006
Known Activity-BasedModeling Work (Slide 8): Known Activity-Based Modeling Work (Slide 8) ARC (Atlanta Regional Commission)
$500,000 Spent Annually For Modeling Services Contract, With
$100,000 Dedicated To Activity-Based Development
Population Synthesizer Is Up And Running
Desired 2007 Activity Model Completion
Expectations For Parallel Two-Track Modeling (For Awhile)
Known Activity-BasedModeling Work (Slide 9): Known Activity-Based Modeling Work (Slide 9) Calgary, Alberta (Canada)
Existing Tour-Based Microsimulation Model For Commercial
Vehicles
Developing Region-Wide Activity-Based Model For Weekend Travel
Longer-Term Plans For Full Weekday Activity-Based Model
Clark County, Nevada (Las Vegas Area)
Household Microsimulation Travel Demand Model (Caliper)
STEP2—Builds Upon Greig Harvey’s STEP Policy Analysis Tool
For The San Francisco Area
Known Activity-BasedModeling Work (Slide 10): Known Activity-Based Modeling Work (Slide 10)
VISEM Applications (PTV)
Dubai, United Arab Emirates
Beijing, China
Munich And Cologne, Germany
Vienna, Austria
Grenoble And Lille, France
Luxembourg, Luxembourg
Known Activity-BasedModeling Work (Slide 11): Known Activity-Based Modeling Work (Slide 11) EPA Three-Year Project (2004 STAR B-1)
Paul Waddell As Principal Investigator
Integration Of Land Use And Activity Location Modeling
Project Kicks Off This Month (September 2005)
CEMDAP (Comprehensive Econometric Microsimulator
For Generating Daily Activity-Travel Patterns)
University Of Texas At Austin (Chandra Bhat)
TxDOT State Planning Research Funding ($589,100 Spent Since
2001; $135,000 For One-Year Extension)
CEMDAP Work(Now To August 31, 2006) : CEMDAP Work (Now To August 31, 2006) Implement And Test 4874-Zone Activity-Based Model For
The 5,000 Square Mile Dallas-Fort Worth Area
Use NCTCOG Model For Truck Trips And All External Trips
Prepare 1999 And 2025 CEMDAP Model Runs
Year 1999 Validation Checks
Compare 1999 And 2025 Against NCTCOG’s Four-Step Model
Prepare And Document Model Sensitivity Tests
Implement Several Hypothetical Scenarios
Both CEMDAP And NCTCOG Model Tests
Existing DFW 4-Step Model: Existing DFW 4-Step Model TRIP GENERATION TRIP DISTRIBUTION MODE CHOICE ROADWAY ASSIGNMENT TRAVEL TIME
CONVERGENCE TRANSIT ASSIGNMENT NO YES ZONE LAYER DEMOGRAPHIC INFORMATION ROADWAY NETWORK TRANSIT NETWORK LOOP ROADWAY SKIMS TRANSIT SKIMS INPUT PROCESS DECISION
DFW Model With CEMDAP In Place: DFW Model With CEMDAP In Place CEMDAP CEMDAP CEMDAP ROADWAY ASSIGNMENT TRAVEL TIME
CONVERGENCE TRANSIT ASSIGNMENT NO YES ZONE LAYER DEMOGRAPHIC INFORMATION ROADWAY NETWORK TRANSIT NETWORK LOOP ROADWAY SKIMS TRANSIT SKIMS INPUT PROCESS DECISION