logging in or signing up 2002 03 SURLES APEC Randolfo Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 56 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: January 17, 2008 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript California’s Efforts In Addressing New Electricity MarketsAsia Pacific Economic Cooperation (APEC)Expert Group on New and Renewable Energy Technologies: California’s Efforts In Addressing New Electricity Markets Asia Pacific Economic Cooperation (APEC) Expert Group on New and Renewable Energy Technologies Terry Surles, Director Technology Systems Division California Energy Commission Slide2: GDP (2000)Production of Electricity by Source - 1999: Production of Electricity by Source - 1999 Imports Imports NG-15.5 Hydro- 32.6 Coal- 51.9 Wind/solar- 1.6 Geothermal - 4.8 Biomass/waste- 2.0 Oil- 0.2 Natural Gas Hydro 18 31 15 Nuclear Coal 15 13 276 TWh 3,678 TWh Coal 51 Nuclear 20 Hydro 8.5 Nat Gas 15 Wind/solar-0.1 Geothermal- 0.4 Imports- 1.2 Oil- 3.2California Energy Perspective: California Energy Perspective Previous system wasn’t broken Market power became concentrated profits up by selling more for less No price signal for end users Loss of momentum on demand side management 10 GWh saved by early 1990’s Restructuring derails utility DSM 1.4 GW of renewable cancelled “No need” Price was above cost to utilities Results Demand up 0.7%, price up 130% Blackouts with 28 GW laid, with ~50 GW capacity California Energy Issues:Interdependencies: California Energy Issues: Interdependencies Relationship of natural gas to electricity use storage down 87% from 11/99 to 11/00 generators pass through spot gas prices $3 to $69 MBtu from 12/12/99 to 12/12/00 1-in-75 year drought will cause increased gas demand 600Bcf in west, 225 Bcf in So Cal SONGS outage reduces 1100 MW of generating capacity increase gas demand by 200 Mcfd First cold winter in US in three years price up all over, higher in CA Peak Demand is Increasing Faster than Newly Installed Capacity: Peak Demand is Increasing Faster than Newly Installed Capacity MegawattsContribution to ISO Peak DemandAugust 16, 2001 (MW): Contribution to ISO Peak Demand August 16, 2001 (MW) Commercial AC Commercial Lighting Residential AC OtherISO Daily Peak LoadsJanuary 2000 - August 31, 2001: ISO Daily Peak Loads January 2000 - August 31, 2001 Summer Peak is 50% higher than rest of year Yet blackouts occurred hereGeneration OutagesScheduled & Forced : Generation Outages Scheduled & Forced Outages 2-4 times greater in Fall/Winter/Spring 2000-01 Average MW/MonthWhat Changed by Summer & Fall 2001?: What Changed by Summer & Fall 2001? CA peak demand > 40,000 MW on only 9 days FERC ordered generators to offer power FERC threatened scrutiny of outages Conservation of ~8% from publicity campaign and higher prices Capacity additions 1/1/01 - 8/1/01 8/2/01 - 8/1/02 CA & N. Baja 3,192 MW 7,652 MW NW, Alberta, BC 2,104 MW 4,038 MW SW 2,331 MW 3,212 MW 7,627 MW 14,902 MWCalifornia: policy really does work: California: policy really does work MWh per person-yearSlide12: Peak Demand Influenced by Economics and WeatherSlide13: Summer 2001 Peak Demand Reductions Stakeholder Consultation: Stakeholder ConsultationClimate Change Adaptation: Climate Change Adaptation Problem: California is unprepared for the likely physical, economic and societal disruptions of climate changeSlide16: Proof of Concept Techn. Develop. Demonstrations Self Sustaining Market Valley of Death PIER Program (RD&D) Renewable Energy Program Internat. Market Export Program Technology Development Continuum From Innovation to Market Certification New Energy IdeaPIER Objectives: Meeting Ratepayers Needs: PIER Objectives: Meeting Ratepayers Needs Tangible products reach market legislative justification Prepare for the next crisis end use energy efficiency Distributed energy sources supply alternatives demand side management enabling systems externalities (environment, resource, security), climate changePowerLight Corporation Building-Integrated PV Roof System: PowerLight Corporation Building-Integrated PV Roof SystemThe Yolo County Success: The Yolo County Success Accomplishments Is opening the way for landfill gas electricity systems to be more widely used in California Accelerates gas production from over 30 years to less than 10 years, making landfill electricity more competitive Reduces volume of landfill which can extend landfill life by 20 percent Significantly reduces the chance for groundwater pollution from leachate release Has become the leading bioreactor project within EPA’s XL Program and will strongly influence landfill regulations across the country CEC’s Role Through the CEC’s R&D programs, we’re bringing bioreactor technology from concept to reality Control cell without bioreactor Enhanced bioreactor cellHoopa Valley Indian Tribe - PIER Small Modular Biopower (SMB) Demonstration: Hoopa Valley Indian Tribe - PIER Small Modular Biopower (SMB) Demonstration SMB BioMax-15 System commissioned 8/01helps promote sustainable forestry As pictured, forest clearing residue is a source of fuel as is urban wood waste (twigs, leaves, bark and other trimmings) Fully-automated control system. Nominal rating is 12.5 kW but has run continuously at 15 kW for six hours NOx levels 0-2 ppm at full power, equivalent to .05 lb. NOx/MW-hrThe Wind Turbine Company: The Wind Turbine Company Design, develop and demonstrate a utility-scale wind turbine Horizontal axis, two-blade, downwind design Prototype developed for PIER and tested at NREL rated at 250 kW Commercial prototype demonstration sited at the Fairmont Reservoir in LADWP territory for a 500 kW - scaled up to 750 kW - wind turbine demonstration to begin in October 2001 Goal is to produce electricity $0.035 cents per kWh per 100 unit wind farms with wind resources 15 mph.Technical Support for DG Interconnection Standards: Technical Support for DG Interconnection Standards Reduces average cost of interconnection fees to consumers by 37% Supports Rule 21 by resolving technical safety issues Establishes technology & size neutral review process Identified testing and certification requirements Enables insertion of new generation (e.g. renewables) into the grid Renewable Generation Issues: Renewable Generation Issues Developers of new renewable energy projects currently face a high degree of uncertainty The biggest impediment to further development of renewable projects is the lack of a stable market with buyers willing to provide adequate price certainty Slide24: $540 million in program funding (1998 - 2002) Market-based support for supply and demand sides of renewable energy market by providing: Production incentives for existing and new renewable electricity generation Capital cost buydowns to install on-site distributed generation systems Rebates to customers who purchase renewable electricity Consumer education California’s Renewable Energy Program At a Glance Slide25: Investment Plan Renewable Energy Consumption Targets Renewable Generation By Type: Renewable Generation By Type SOLAR WIND BIOMASS GEOTHERMALSlide27: Investment Plan Renewables Generation Goals Energy Technology Export Program Focus: Energy Technology Export Program Focus Assist Small and Mid - Size Companies Develop International Energy Projects (<$100Million in Capital Costs/Project) Feature Clean Combustion Power Plants, Energy Efficiency, Industrial Cogeneration, Renewable Energy Asia and Latin America Concentration International Project Financing: Pre-Investment: Energy Commission International Energy Fund Pre-Development: E&Co./Rockefeller Foundation/Venture Capital Project Financing/Project Development: EXIM Bank: >$10 Million IFC/REEEF: 25% Debt/Equity Equity Investors/Equity Funds Multi-Lateral Banks: World Bank, ADB Dresdner Bank International Project FinancingRecent Projects: Recent Projects Wind Power Projects (16.5 MW) - Greece Clean Coal (CFB) Power Plants - China Industrial Cogeneration (12 MW) - Thailand Hotel Energy Efficiency Retrofits - Mexico and Panama Geothermal Power Plant (5 MW) - Vanuatu Electric Bicycle Kits (2,000 Units) - China Next Steps: : Next Steps: Diffuse excess market power Address potential for supply overshoot Change buyer’s mentality Education - it’s more than flicking a switch Take control - it’s not a tax Develop alternatives end-use energy efficiency distributed energy resources enabling technologies for DSM and real-time pricing You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
2002 03 SURLES APEC Randolfo Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 56 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: January 17, 2008 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript California’s Efforts In Addressing New Electricity MarketsAsia Pacific Economic Cooperation (APEC)Expert Group on New and Renewable Energy Technologies: California’s Efforts In Addressing New Electricity Markets Asia Pacific Economic Cooperation (APEC) Expert Group on New and Renewable Energy Technologies Terry Surles, Director Technology Systems Division California Energy Commission Slide2: GDP (2000)Production of Electricity by Source - 1999: Production of Electricity by Source - 1999 Imports Imports NG-15.5 Hydro- 32.6 Coal- 51.9 Wind/solar- 1.6 Geothermal - 4.8 Biomass/waste- 2.0 Oil- 0.2 Natural Gas Hydro 18 31 15 Nuclear Coal 15 13 276 TWh 3,678 TWh Coal 51 Nuclear 20 Hydro 8.5 Nat Gas 15 Wind/solar-0.1 Geothermal- 0.4 Imports- 1.2 Oil- 3.2California Energy Perspective: California Energy Perspective Previous system wasn’t broken Market power became concentrated profits up by selling more for less No price signal for end users Loss of momentum on demand side management 10 GWh saved by early 1990’s Restructuring derails utility DSM 1.4 GW of renewable cancelled “No need” Price was above cost to utilities Results Demand up 0.7%, price up 130% Blackouts with 28 GW laid, with ~50 GW capacity California Energy Issues:Interdependencies: California Energy Issues: Interdependencies Relationship of natural gas to electricity use storage down 87% from 11/99 to 11/00 generators pass through spot gas prices $3 to $69 MBtu from 12/12/99 to 12/12/00 1-in-75 year drought will cause increased gas demand 600Bcf in west, 225 Bcf in So Cal SONGS outage reduces 1100 MW of generating capacity increase gas demand by 200 Mcfd First cold winter in US in three years price up all over, higher in CA Peak Demand is Increasing Faster than Newly Installed Capacity: Peak Demand is Increasing Faster than Newly Installed Capacity MegawattsContribution to ISO Peak DemandAugust 16, 2001 (MW): Contribution to ISO Peak Demand August 16, 2001 (MW) Commercial AC Commercial Lighting Residential AC OtherISO Daily Peak LoadsJanuary 2000 - August 31, 2001: ISO Daily Peak Loads January 2000 - August 31, 2001 Summer Peak is 50% higher than rest of year Yet blackouts occurred hereGeneration OutagesScheduled & Forced : Generation Outages Scheduled & Forced Outages 2-4 times greater in Fall/Winter/Spring 2000-01 Average MW/MonthWhat Changed by Summer & Fall 2001?: What Changed by Summer & Fall 2001? CA peak demand > 40,000 MW on only 9 days FERC ordered generators to offer power FERC threatened scrutiny of outages Conservation of ~8% from publicity campaign and higher prices Capacity additions 1/1/01 - 8/1/01 8/2/01 - 8/1/02 CA & N. Baja 3,192 MW 7,652 MW NW, Alberta, BC 2,104 MW 4,038 MW SW 2,331 MW 3,212 MW 7,627 MW 14,902 MWCalifornia: policy really does work: California: policy really does work MWh per person-yearSlide12: Peak Demand Influenced by Economics and WeatherSlide13: Summer 2001 Peak Demand Reductions Stakeholder Consultation: Stakeholder ConsultationClimate Change Adaptation: Climate Change Adaptation Problem: California is unprepared for the likely physical, economic and societal disruptions of climate changeSlide16: Proof of Concept Techn. Develop. Demonstrations Self Sustaining Market Valley of Death PIER Program (RD&D) Renewable Energy Program Internat. Market Export Program Technology Development Continuum From Innovation to Market Certification New Energy IdeaPIER Objectives: Meeting Ratepayers Needs: PIER Objectives: Meeting Ratepayers Needs Tangible products reach market legislative justification Prepare for the next crisis end use energy efficiency Distributed energy sources supply alternatives demand side management enabling systems externalities (environment, resource, security), climate changePowerLight Corporation Building-Integrated PV Roof System: PowerLight Corporation Building-Integrated PV Roof SystemThe Yolo County Success: The Yolo County Success Accomplishments Is opening the way for landfill gas electricity systems to be more widely used in California Accelerates gas production from over 30 years to less than 10 years, making landfill electricity more competitive Reduces volume of landfill which can extend landfill life by 20 percent Significantly reduces the chance for groundwater pollution from leachate release Has become the leading bioreactor project within EPA’s XL Program and will strongly influence landfill regulations across the country CEC’s Role Through the CEC’s R&D programs, we’re bringing bioreactor technology from concept to reality Control cell without bioreactor Enhanced bioreactor cellHoopa Valley Indian Tribe - PIER Small Modular Biopower (SMB) Demonstration: Hoopa Valley Indian Tribe - PIER Small Modular Biopower (SMB) Demonstration SMB BioMax-15 System commissioned 8/01helps promote sustainable forestry As pictured, forest clearing residue is a source of fuel as is urban wood waste (twigs, leaves, bark and other trimmings) Fully-automated control system. Nominal rating is 12.5 kW but has run continuously at 15 kW for six hours NOx levels 0-2 ppm at full power, equivalent to .05 lb. NOx/MW-hrThe Wind Turbine Company: The Wind Turbine Company Design, develop and demonstrate a utility-scale wind turbine Horizontal axis, two-blade, downwind design Prototype developed for PIER and tested at NREL rated at 250 kW Commercial prototype demonstration sited at the Fairmont Reservoir in LADWP territory for a 500 kW - scaled up to 750 kW - wind turbine demonstration to begin in October 2001 Goal is to produce electricity $0.035 cents per kWh per 100 unit wind farms with wind resources 15 mph.Technical Support for DG Interconnection Standards: Technical Support for DG Interconnection Standards Reduces average cost of interconnection fees to consumers by 37% Supports Rule 21 by resolving technical safety issues Establishes technology & size neutral review process Identified testing and certification requirements Enables insertion of new generation (e.g. renewables) into the grid Renewable Generation Issues: Renewable Generation Issues Developers of new renewable energy projects currently face a high degree of uncertainty The biggest impediment to further development of renewable projects is the lack of a stable market with buyers willing to provide adequate price certainty Slide24: $540 million in program funding (1998 - 2002) Market-based support for supply and demand sides of renewable energy market by providing: Production incentives for existing and new renewable electricity generation Capital cost buydowns to install on-site distributed generation systems Rebates to customers who purchase renewable electricity Consumer education California’s Renewable Energy Program At a Glance Slide25: Investment Plan Renewable Energy Consumption Targets Renewable Generation By Type: Renewable Generation By Type SOLAR WIND BIOMASS GEOTHERMALSlide27: Investment Plan Renewables Generation Goals Energy Technology Export Program Focus: Energy Technology Export Program Focus Assist Small and Mid - Size Companies Develop International Energy Projects (<$100Million in Capital Costs/Project) Feature Clean Combustion Power Plants, Energy Efficiency, Industrial Cogeneration, Renewable Energy Asia and Latin America Concentration International Project Financing: Pre-Investment: Energy Commission International Energy Fund Pre-Development: E&Co./Rockefeller Foundation/Venture Capital Project Financing/Project Development: EXIM Bank: >$10 Million IFC/REEEF: 25% Debt/Equity Equity Investors/Equity Funds Multi-Lateral Banks: World Bank, ADB Dresdner Bank International Project FinancingRecent Projects: Recent Projects Wind Power Projects (16.5 MW) - Greece Clean Coal (CFB) Power Plants - China Industrial Cogeneration (12 MW) - Thailand Hotel Energy Efficiency Retrofits - Mexico and Panama Geothermal Power Plant (5 MW) - Vanuatu Electric Bicycle Kits (2,000 Units) - China Next Steps: : Next Steps: Diffuse excess market power Address potential for supply overshoot Change buyer’s mentality Education - it’s more than flicking a switch Take control - it’s not a tax Develop alternatives end-use energy efficiency distributed energy resources enabling technologies for DSM and real-time pricing