Swimming Pool Construction Process

Views:
 
Category: Education
     
 

Presentation Description

Swimming pool construction made easy

Comments

Presentation Transcript

Slide 2: 

QUALITY FROM THE GROUND DOWN

Slide 3: 

THE EXCAVATION

5 TON EXCAVATOR : 

5 TON EXCAVATOR IN THE RIGHT HANDS

BOX AND STEEL SHELL : 

BOX AND STEEL SHELL WHEN THE SHAPE OF THE POOL HAS BEEN FORMED WITH STEEL AND PLY IT IS READY FOR SPRAYING.

SPRAYING THE SHELL : 

SPRAYING THE SHELL

FINISHED SHELL : 

FINISHED SHELL LET THE CONCRETE CURE FOR APPROX 28 DAYS BEFORE TILING

ADD WATERLINE AND COPING TILES, SURROUND PAVING AND FENCE.POSITION EQUIPMENT BELOW DECK TIMBER DECK BY CLIENT : 

ADD WATERLINE AND COPING TILES, SURROUND PAVING AND FENCE.POSITION EQUIPMENT BELOW DECK TIMBER DECK BY CLIENT

PEBBLECRETE : 

ALL HAND APPLIED THEN ACID WASHED TO REVEAL THE FINE AGGREGATES PEBBLECRETE

GO FASTER SHOES : 

GO FASTER SHOES

FILL THE POOL WITH WATER : 

FILL THE POOL WITH WATER

DIVE IN : 

DIVE IN

A NEW LIFESTYLE : 

A NEW LIFESTYLE