logging in or signing up 05 T2K QA Natalia Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 102 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: October 15, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Q&A on T2K: Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KKBird’s-Eye View (Feb. 2006): Bird’s-Eye View (Feb. 2006) Hadron Experimental Hall 50 GeV MR A round=1,600m Materials & Life Experimental Hall 3GeV RCS A round=350m Linac (330m) Neutrino 3NBT 3-50BTPrimary Beam-line: Primary Beam-line 3NBT DV ARC Preparation Section Material Life & Science 50GeV Preparation Section July, 2006 March, 2006plan: plan Beam Power (MW) 0 1 2 3 2008 2009 2010 2011 2012 RCS power h.n. RF mod h.n.+RFx2 0.5MW 0.1MW >0.5MW >0.75MW RF 400MeV Linac commissioningNeutrino Beam Line for T2K Experiment: decay volume Near detector Target Station Beam dump/m-pit 280m Neutrino Beam Line for T2K Experiment Components Primary proton beam line Normal conducting magnets Superconducting arc Proton beam monitors Target/Horn system Decay pipe Beam dump muon monitors Near neutrino detector Special Features Superconducting combined function magnets Off-axis beam To Super-KamiokandeHorns: Horns 1st horn Successful operation at 320kA Long-term current operation test 2nd horn design / 3rd horn prototype in FY06 Support module Conceptual design done on Remote coupling of horns and water / He pipes. Kinematic alignment system R&D Remote coupling of strip-lines Water circulation system (7m pumping up) Support module itself Produce everything in FY2007ND280 Neutrino Detector(Experimental Hall with 3 floors): ND280 Neutrino Detector (Experimental Hall with 3 floors) Current design 37m 2.5deg beam center 28.5m Ground level Off-Axis Neutrino Detector On-Axis Neutrino MonitorSchedule of n beam line: Schedule of n beam line Japanese funding situation: Japanese funding situation Beamline, detector hall civil (~80-oku\) Equipments (~72-oku\) Proton, muon, neutrino monitor (~ 4-oku\) Foreign Contributions ~20M$ from Canada, France, Italy, Korea, Poland, Russia, Spain, Switzerland, UK, USA T2K Collaboration: T2K Collaboration 11 Countries (number of members) Canada(24), France(8), Italy(11), Japan(46), Korea(9), Poland(1), Russia(8), Spain(12), Switzerland(3), UK(25), USA(42) 58 Institutes, 189 Ph.D. members, still growingSlide13: Canada Damper system, OTR beam monitor, Remote handling, Actuator, Vacuum chamber, Fine-Grained-Detector (FGD), TPC France SC quench detection system, TPC electronics, TPC Italy UA1 magnet, Side-Muon-Ranger (SMRD), 2km ND Korea Beam Monitor electronics, neutrino monitor, Poland Neutrino MC Russia Neutrino Monitor, Photo-sensor, SMRD, Spain UA1 magnet, TPC, software Switzerland UA1 magnet, TPC, neutrino monitor UK Target, target remote handling, Dump, Beam window, UA1 magnet, Electromagnetic Calorimeter, Basket, Electronics, Photo-sensor USA SC correction magnets, 2nd horn, CT beam monitor, beam monitor electronics, GPS system, pi-zero detector (P0D), SMRD, 2km ND, Super-K (1)Accelerator (2) Beam Line, (3) Near Neutrino Detector, (4) Super-KSlide14: One of the future options of T2K 0.5Mton at Kamioka and 0.5Mton at Korea Aim to resolve q13, d digeneracy Discriminate mass hierarchy Studies and discussions have been done Hagiwara et al. Phy.Rev.B 637 (2006) 266 Ishizuka et al., PRD 72 (2005) 033033 2 International workshop on a Far Detector in Korea for the J-PARC Neutrino Beam You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
05 T2K QA Natalia Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 102 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: October 15, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Q&A on T2K: Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KKBird’s-Eye View (Feb. 2006): Bird’s-Eye View (Feb. 2006) Hadron Experimental Hall 50 GeV MR A round=1,600m Materials & Life Experimental Hall 3GeV RCS A round=350m Linac (330m) Neutrino 3NBT 3-50BTPrimary Beam-line: Primary Beam-line 3NBT DV ARC Preparation Section Material Life & Science 50GeV Preparation Section July, 2006 March, 2006plan: plan Beam Power (MW) 0 1 2 3 2008 2009 2010 2011 2012 RCS power h.n. RF mod h.n.+RFx2 0.5MW 0.1MW >0.5MW >0.75MW RF 400MeV Linac commissioningNeutrino Beam Line for T2K Experiment: decay volume Near detector Target Station Beam dump/m-pit 280m Neutrino Beam Line for T2K Experiment Components Primary proton beam line Normal conducting magnets Superconducting arc Proton beam monitors Target/Horn system Decay pipe Beam dump muon monitors Near neutrino detector Special Features Superconducting combined function magnets Off-axis beam To Super-KamiokandeHorns: Horns 1st horn Successful operation at 320kA Long-term current operation test 2nd horn design / 3rd horn prototype in FY06 Support module Conceptual design done on Remote coupling of horns and water / He pipes. Kinematic alignment system R&D Remote coupling of strip-lines Water circulation system (7m pumping up) Support module itself Produce everything in FY2007ND280 Neutrino Detector(Experimental Hall with 3 floors): ND280 Neutrino Detector (Experimental Hall with 3 floors) Current design 37m 2.5deg beam center 28.5m Ground level Off-Axis Neutrino Detector On-Axis Neutrino MonitorSchedule of n beam line: Schedule of n beam line Japanese funding situation: Japanese funding situation Beamline, detector hall civil (~80-oku\) Equipments (~72-oku\) Proton, muon, neutrino monitor (~ 4-oku\) Foreign Contributions ~20M$ from Canada, France, Italy, Korea, Poland, Russia, Spain, Switzerland, UK, USA T2K Collaboration: T2K Collaboration 11 Countries (number of members) Canada(24), France(8), Italy(11), Japan(46), Korea(9), Poland(1), Russia(8), Spain(12), Switzerland(3), UK(25), USA(42) 58 Institutes, 189 Ph.D. members, still growingSlide13: Canada Damper system, OTR beam monitor, Remote handling, Actuator, Vacuum chamber, Fine-Grained-Detector (FGD), TPC France SC quench detection system, TPC electronics, TPC Italy UA1 magnet, Side-Muon-Ranger (SMRD), 2km ND Korea Beam Monitor electronics, neutrino monitor, Poland Neutrino MC Russia Neutrino Monitor, Photo-sensor, SMRD, Spain UA1 magnet, TPC, software Switzerland UA1 magnet, TPC, neutrino monitor UK Target, target remote handling, Dump, Beam window, UA1 magnet, Electromagnetic Calorimeter, Basket, Electronics, Photo-sensor USA SC correction magnets, 2nd horn, CT beam monitor, beam monitor electronics, GPS system, pi-zero detector (P0D), SMRD, 2km ND, Super-K (1)Accelerator (2) Beam Line, (3) Near Neutrino Detector, (4) Super-KSlide14: One of the future options of T2K 0.5Mton at Kamioka and 0.5Mton at Korea Aim to resolve q13, d digeneracy Discriminate mass hierarchy Studies and discussions have been done Hagiwara et al. Phy.Rev.B 637 (2006) 266 Ishizuka et al., PRD 72 (2005) 033033 2 International workshop on a Far Detector in Korea for the J-PARC Neutrino Beam