logging in or signing up GA MRR 111804 Marietta1 Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 37 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: January 09, 2008 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide1: GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at G&A Luca Latronico INFN-Pisa luca.latronico@pi.infn.it Relevant Documents: Relevant Documents LAT-PS-01801 Integration of TMCM and SSD Ladders onto Tracker Trays released – MRB on wire-bonds encapsulation removal requires sigantures approval LAT-PS-03534 Single Tray Electrical Test Plan released Production company: G&A Engineering, Carsoli-Oricola (AQ)Assembly and test flow-chart: Assembly and test flow-chart INFN provides G&A with tray panels, TMCMs, ladders, (and their relative locations on the tray) + Nusil adhesives Alignment jig (WS-B1) provides: TMCM planarity Pitch adapter planarity Bonding pads alignment (HV and shield pads) Dry assembly test to check TMCM connectors clearance Adhesive distribution (WS-B2) Assembly of TMCM onto tray (WS-B3) Metrology (WS-B4) Wire bonding (WS-B5) Electrical tests (WS-B6) Current production rate ramping up: need to match CC pocket and MCM connector depth extra screening on TMCM pitch adapter (missing connections on signal strips and HV lines – PA debondings) WS-A Material receiving and inspection WS-B TMCM IntegrationAssembly and test flow-chart: Assembly and test flow-chart Ladder test (WS-C1) Tray Z positioning under CMM (WS-C2) 50m wrt nominal position Ladder positioning on the bridges (WS-C3) Alignment from bridge itself used as reference and excellent alignment of SSD inside ladder (~2 mm RMS) Glue deposition (WS-C4) 19 spots of siliconic glue/SSD 4 spots conductive glue + 1 unbroken line across ladders Ladder assembly (WS-C5) Ladder metrology (WS-C6) Ladder height 0.250.1 mm Ladders relative parallelism of 0.1 mm Wire bonding (WS-C6) Destructive pull tests on coupons (>5g each) Visual inspection Functional test by INFN with tray inside box LAT-PS-03534 DRB and shipping to INFN WS-C Ladders integration WS-D Final dispositionAvailability of components and tools: Availability of components and tools Bare panel trays after TVAC test in Roma2 27 trays available – planned supply is 4trays/day SSD Ladders from G&A and Mipot ~1400 ladders available - 400 more from G&A (200 to test, 200 being built) – 900 will be built from Mipot asap MCM from SLAC through quick functional verification at INFN-Pisa Currently 38+32 Could match 14 trays (26 TMCMs) from first lot of 38 because of connector stick-out issue 6 TMCMs sent back to SLAC for PA debondings Nusil at G&A for ~3/4 of tray production G&A tools TMCM alignment tools: 5 Ladder integration tools (tray alignment + ladder bridges): 6 CMM: 2 (1 for alignments, 1 for metrology) Glue dispenser: 2 wire-bonder: 2 2 working shifts per day to grant production rate of 4 trays/day EGSE for functional tests 1 full EGSE system installed at G&A and operated by INFN Data exchange with INFN-Pisa: From INFN to GA: List of subparts (ladders and TMCM) from INFN-Pisa From GA to INFN: List of subparts with G&A reference SNs (neede for tray box) Progress of assembly (weekly) Quality Assurance Rely on G&A certified QA program for internal activity Handle major NCR notified from G&A (MARECO) with Pisa system Data exchange with INFN-PisaTower 0 tray production: Tower 0 tray production 14 complete trays assembled (27 TMCMs and SSD Ladder planes) 23 Si layers were within specs 4 Si layers had short for problems related to bias circuit delamination All went through thermal tests 4 Si layers (bottom side of heavy trays) had many disconnected channels because of CTE mismatch impact on wire-bond encapsulation MRB on wire-bond encapsulation 23 SSD layers operated successfully up to now Metrology of ladders alignment: Metrology: with a CMM with interchangeable mechanical-optical heads, the positions of 12 “C” markers, 3 for each ladders, and the positions of the MCM alignment pins are measured on both sides of the tray. Metrology of ladders alignment Results – ladders alignment: Results – ladders alignment Functional test results – leakge current: 079MID front: 1.67 uA @ 150 V 079MID back: 1.85 uA @ 150 V 050MID front: 2.02 uA @ 150 V 050MID back: 1.77 uA @ 150 V Functional test results – leakge currentFunctional test results – trigger rates vs threshold: 050MID front 050MID back 079MID back 079MID front Functional test results – trigger rates vs thresholdFunctional tests results – bad channels: Functional tests results – bad channels Total number of bad channels well within specs (16 max) High reliability of PA screening test on TMCM High yield of wire-bonding Conclusions: Conclusions Assembly and test procedures well tuned and tested on EM trays and tower 0 G&A moving rapidly to planned production rate High yield of assembly so far > 100 ladders glued and wire-bonded with no failures and well within specs Tower A production well within specs Leakage current Noise and thresholds performance Bad channels You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
GA MRR 111804 Marietta1 Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 37 Category: Education License: All Rights Reserved Like it (0) Dislike it (0) Added: January 09, 2008 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Slide1: GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at G&A Luca Latronico INFN-Pisa luca.latronico@pi.infn.it Relevant Documents: Relevant Documents LAT-PS-01801 Integration of TMCM and SSD Ladders onto Tracker Trays released – MRB on wire-bonds encapsulation removal requires sigantures approval LAT-PS-03534 Single Tray Electrical Test Plan released Production company: G&A Engineering, Carsoli-Oricola (AQ)Assembly and test flow-chart: Assembly and test flow-chart INFN provides G&A with tray panels, TMCMs, ladders, (and their relative locations on the tray) + Nusil adhesives Alignment jig (WS-B1) provides: TMCM planarity Pitch adapter planarity Bonding pads alignment (HV and shield pads) Dry assembly test to check TMCM connectors clearance Adhesive distribution (WS-B2) Assembly of TMCM onto tray (WS-B3) Metrology (WS-B4) Wire bonding (WS-B5) Electrical tests (WS-B6) Current production rate ramping up: need to match CC pocket and MCM connector depth extra screening on TMCM pitch adapter (missing connections on signal strips and HV lines – PA debondings) WS-A Material receiving and inspection WS-B TMCM IntegrationAssembly and test flow-chart: Assembly and test flow-chart Ladder test (WS-C1) Tray Z positioning under CMM (WS-C2) 50m wrt nominal position Ladder positioning on the bridges (WS-C3) Alignment from bridge itself used as reference and excellent alignment of SSD inside ladder (~2 mm RMS) Glue deposition (WS-C4) 19 spots of siliconic glue/SSD 4 spots conductive glue + 1 unbroken line across ladders Ladder assembly (WS-C5) Ladder metrology (WS-C6) Ladder height 0.250.1 mm Ladders relative parallelism of 0.1 mm Wire bonding (WS-C6) Destructive pull tests on coupons (>5g each) Visual inspection Functional test by INFN with tray inside box LAT-PS-03534 DRB and shipping to INFN WS-C Ladders integration WS-D Final dispositionAvailability of components and tools: Availability of components and tools Bare panel trays after TVAC test in Roma2 27 trays available – planned supply is 4trays/day SSD Ladders from G&A and Mipot ~1400 ladders available - 400 more from G&A (200 to test, 200 being built) – 900 will be built from Mipot asap MCM from SLAC through quick functional verification at INFN-Pisa Currently 38+32 Could match 14 trays (26 TMCMs) from first lot of 38 because of connector stick-out issue 6 TMCMs sent back to SLAC for PA debondings Nusil at G&A for ~3/4 of tray production G&A tools TMCM alignment tools: 5 Ladder integration tools (tray alignment + ladder bridges): 6 CMM: 2 (1 for alignments, 1 for metrology) Glue dispenser: 2 wire-bonder: 2 2 working shifts per day to grant production rate of 4 trays/day EGSE for functional tests 1 full EGSE system installed at G&A and operated by INFN Data exchange with INFN-Pisa: From INFN to GA: List of subparts (ladders and TMCM) from INFN-Pisa From GA to INFN: List of subparts with G&A reference SNs (neede for tray box) Progress of assembly (weekly) Quality Assurance Rely on G&A certified QA program for internal activity Handle major NCR notified from G&A (MARECO) with Pisa system Data exchange with INFN-PisaTower 0 tray production: Tower 0 tray production 14 complete trays assembled (27 TMCMs and SSD Ladder planes) 23 Si layers were within specs 4 Si layers had short for problems related to bias circuit delamination All went through thermal tests 4 Si layers (bottom side of heavy trays) had many disconnected channels because of CTE mismatch impact on wire-bond encapsulation MRB on wire-bond encapsulation 23 SSD layers operated successfully up to now Metrology of ladders alignment: Metrology: with a CMM with interchangeable mechanical-optical heads, the positions of 12 “C” markers, 3 for each ladders, and the positions of the MCM alignment pins are measured on both sides of the tray. Metrology of ladders alignment Results – ladders alignment: Results – ladders alignment Functional test results – leakge current: 079MID front: 1.67 uA @ 150 V 079MID back: 1.85 uA @ 150 V 050MID front: 2.02 uA @ 150 V 050MID back: 1.77 uA @ 150 V Functional test results – leakge currentFunctional test results – trigger rates vs threshold: 050MID front 050MID back 079MID back 079MID front Functional test results – trigger rates vs thresholdFunctional tests results – bad channels: Functional tests results – bad channels Total number of bad channels well within specs (16 max) High reliability of PA screening test on TMCM High yield of wire-bonding Conclusions: Conclusions Assembly and test procedures well tuned and tested on EM trays and tower 0 G&A moving rapidly to planned production rate High yield of assembly so far > 100 ladders glued and wire-bonded with no failures and well within specs Tower A production well within specs Leakage current Noise and thresholds performance Bad channels