IE 327 1 IE 327 Introduction to Work Design Dr. Andris Freivalds Class #3

Gilbane Gold:

IE 327 2 Gilbane Gold Is there an ethical problem here? If you were in David’s situation, what would you do?

METHODS STUDY:

IE 327 3 METHODS STUDY Systematic recording of existing and proposed ways of doing work in order to simplify the job Improve procedures Improve layout Reduce human fatigue Improve use of materials, machines, labor Improve physical workplace

Fig. 2.1 – Steps in Methods Study:

IE 327 4 Fig. 2.1 – Steps in Methods Study Select project Get and present data Analyze data Develop ideal method Present and install method Develop job analysis Establish time standards Follow up

Fig. 2.1 – Steps in Methods Study:

IE 327 5 Fig. 2.1 – Steps in Methods Study

#1 – Select Project:

IE 327 6 #1 – Select Project Human factors – Technical factors – Economic factors – Exploratory tools Pareto analysis Gantt chart Fish diagram Job/Worksite Analysis Guide

PARETO ANALYSIS (80-20 Rule):

IE 327 7 PARETO ANALYSIS (80-20 Rule) Vilfredo Pareto – economist 80% of money held by 20% of people 80% of costs, accidents, injuries, accounted for by 20% of jobs/individuals Concentrate on those 20% Plot in descending order as a cumulative probability distribution ( DesignTools )

GANTT CHART:

IE 327 8 GANTT CHART Horizontal bar chart of activities Shade in bar as completed Any given point in time, a snapshot of the status of all activities Some behind, some ahead of schedule Again focus efforts where needed Use DesignTools

Slide 9:

IE 327 9

JOB/WORKSITE ANALYSIS GUIDE:

IE 327 10 JOB/WORKSITE ANALYSIS GUIDE Time to go out on the floor Meet with supervisor first Explain study (production?) Select jobs/workers May need to meet with union also Never express opinions Fill out Job/Worksite Analysis Guide

LABELING OPERATION:

IE 327 11 LABELING OPERATION

Slide 12:

IE 327 12

METHODS STUDY (NEXT?):

IE 327 13 METHODS STUDY ( NEXT? ) Get and present data Analyze data Develop ideal method All of these overlap Use special charts or procedures Quicker, more efficient Designed specifically for IEs

Slide 14:

IE 327 14 Charts using sequence only Operation (outline) process chart Flow process chart Two-hand process chart Charts using time Multiple activity chart Simo chart Charts indicating movement Flow diagram Travel chart Motion analysis

PROCESS CHARTS:

IE 327 15 PROCESS CHARTS Record sequence of flow for worker, material, or tools/machines Outline (operation) vs flow Supply basic information: date, job, worker ASME symbols for activities (shorthand) Vertical lines – main flow Horizontal lines – subcomponents to main Summary – compare before and after