Slide1: JFC Naples Relocation Project Background Brief NATO UNCLASSIFIED


Slide2: Current HQ


Slide3: JFC Naples, CC MAR NAPLES and STRIKFORNATO: Future Location @ Lago Patria JFC Naples and STRIKFORNATO: Current Location @ Bagnoli CC MAR NAPLES: Current Location @ Nisida


Slide4: LAGO PATRIA, before construction To Rome To Naples Current entrance SR CLD USN Sat Receiver Site


Slide5: PROJECT DESIGN PHILOSOPHY NATO Security Investment Program Funded Criteria and Standards for Peace time Headquarters AFSOUTH 1999 Peacetime Establishment for Manning


Slide6: PROJECT FEATURES Comprehensive Military Headquarters Installation JFC HQ Naples, CC MAR NAPLES, STRIKFORNATO Site covers 320,000 mq Provides 45,000+ sq meters Office Space


Project Designers: Project Designers Coordinatori progettazione: Iterplan Seconda (Napoli) Progettazione architettonica: Interplan Seconda Progettazione strutturale: Main Complex: Arnaboldi & Partners (Milano) Save Center, Centrale Tecnologica, Edificio Italiano e Motor pool: Studio Puorro (Avellino) Progettazione impianti elettrici: Prof Macchiaroli (Napoli) Progettazione impianti meccanici. Ing Cormio (Bergamo) Progettazione impianti telecomunicazioni e sistemi speciali International Consulting Ing Paladini (Roma)


Slide8: Construction Works Contract Total cost: € 150,00,000.00 Contractor: Temporary Association - Società italiana per Condotte d’Acqua S.p.A., Rome + Sirti S.p.A., Milan Contract signed on 22 December 2003 Official start of works at site: 01 March 2004 Completion of works: Oct 2011


Slide9: Gross floor surface: 60,000 sqm Net Office Space: 35,000 sqm Structure: Steel, reinforced concrete Main Complex JFC HQ NAPLES CC MAR NAPLES SFNATO NCSA SE NSEs Conference Ctr OC


Slide10: Community Center Gross floor surface: 15,400 sqm Structure: Reinforced concrete COM‘s Reception Center Auditorium Fitness Center Int‘l Dining Facility MWA Retail Space


Slide11: Gross floor surface: 4,900 sqm Structure: Steel Motor Pool HQ SG Eng facilities COM’s Band


Slide12: Gross floor surface: 330 sqm Structure: Steel, reinforced concrete Main Gate Media Center Security Office


Slide13: Italian building Gross floor surface: 16,655 sqm Structure: Steel, reinforced concrete Command Elements Carabinieri Ops Center Quarters Recreation area Mess Facilities


Slide14: Additional Structures Central Technological Plant Sports Field with Lockers and Grandstand Secure Perimeter with Three Gates Helicopter Landing Pad Space for Additional National Support Buildings UK (on hold) Utilities Network


Slide15: JFC HQ Naples, LAGO PATRIA To Rome To Naples Central technological plant SR CLD Main Gate Community Center Nat. buildings Main Complex USN Sat Receiver Site Motor Pool


External Utilities: External Utilities All distribution networks have been sized in a way to supply also the future buildings: distribution of drinking water distribution of hot water distribution of refrigerated water Gas Electricity and electrical substation The drainage system has been planned with two main networks: drains for rainwater and for black waters.


Dimensioning 1: Dimensioning 1 The three school branches shall have separate classes and administrative offices, while the common facilities, i.e., book shop, library, gym, mess, language, physics, and chemical laboratories, green areas, and so on, shall be designed for shared use, in order to optimise the related management costs and, primarily to encourage the interaction between the school components .


Dimensioning 2 : Dimensioning 2 IBO programme: # 32 classrooms Primary (3 to 11 years age) Middle (11 to 16 years age) Diploma (16 to 19 years age) UK model: # 8 classrooms Infant (5 to 7 years age) Junior (7 to 11 years age) Greek school: #7 classrooms Elementary (5 to 11 years age) 6 classrooms Pre-school (< 5 years age) 1 classrom


Outstanding issues: Outstanding issues Entrance to the school from Via Madonna del Pantano; Helicopter landing pad; US Satellite receiver site; Water compensation tank


Questions: Questions Questions should be written in english and italian and submitted electronically to Mr. Giuseppe Fusco JFC Naples J8 – Head Purchasing & Contracting Branch –gfusco@afsouth.nato.int by 17 Sep. 07 17:00h. Responses to questions will be sent electronically through J8 to all the participants no later than 24 Sep. 07


Financial Specification: Financial Specification The design proposal shall be marked by a high degree of technical viability, management efficiency and economical feasibility.