Presentation Transcript
Slide1: JFC Naples Relocation Project
Background Brief
NATO UNCLASSIFIED
Slide2: Current HQ
Slide3: JFC Naples, CC MAR NAPLES and STRIKFORNATO: Future Location @ Lago Patria JFC Naples and STRIKFORNATO: Current Location @ Bagnoli CC MAR NAPLES: Current Location @ Nisida
Slide4: LAGO PATRIA, before construction To Rome To Naples Current entrance SR CLD USN Sat Receiver Site
Slide5: PROJECT DESIGN PHILOSOPHY
NATO Security Investment Program Funded
Criteria and Standards for Peace time Headquarters
AFSOUTH 1999 Peacetime Establishment for Manning
Slide6: PROJECT FEATURES
Comprehensive Military Headquarters Installation JFC HQ Naples, CC MAR NAPLES, STRIKFORNATO
Site covers 320,000 mq
Provides 45,000+ sq meters Office Space
Project Designers: Project Designers Coordinatori progettazione: Iterplan Seconda (Napoli)
Progettazione architettonica: Interplan Seconda
Progettazione strutturale:
Main Complex: Arnaboldi & Partners (Milano)
Save Center, Centrale Tecnologica, Edificio Italiano e Motor pool: Studio Puorro (Avellino)
Progettazione impianti elettrici: Prof Macchiaroli (Napoli)
Progettazione impianti meccanici. Ing Cormio (Bergamo)
Progettazione impianti telecomunicazioni e sistemi speciali International Consulting Ing Paladini (Roma)
Slide8: Construction Works Contract
Total cost: € 150,00,000.00
Contractor:
Temporary Association - Società italiana per Condotte d’Acqua S.p.A., Rome + Sirti S.p.A., Milan
Contract signed on 22 December 2003
Official start of works at site: 01 March 2004
Completion of works: Oct 2011
Slide9: Gross floor surface: 60,000 sqm
Net Office Space: 35,000 sqm
Structure: Steel, reinforced concrete Main Complex
JFC HQ NAPLES
CC MAR NAPLES
SFNATO
NCSA SE
NSEs
Conference Ctr
OC
Slide10: Community Center Gross floor surface: 15,400 sqm
Structure: Reinforced concrete COM‘s Reception Center
Auditorium
Fitness Center
Int‘l Dining Facility
MWA Retail Space
Slide11: Gross floor surface: 4,900 sqm
Structure: Steel Motor Pool
HQ SG Eng facilities
COM’s Band
Slide12: Gross floor surface: 330 sqm
Structure: Steel, reinforced concrete Main Gate
Media Center
Security Office
Slide13: Italian building Gross floor surface: 16,655 sqm Structure: Steel, reinforced concrete Command Elements
Carabinieri Ops Center
Quarters
Recreation area
Mess Facilities
Slide14: Additional Structures
Central Technological Plant
Sports Field with Lockers and Grandstand
Secure Perimeter with Three Gates
Helicopter Landing Pad
Space for Additional National Support Buildings UK (on hold)
Utilities Network
Slide15: JFC HQ Naples, LAGO PATRIA To Rome To Naples Central technological plant SR CLD Main Gate Community Center Nat. buildings Main Complex USN Sat Receiver Site Motor Pool
External Utilities: External Utilities All distribution networks have been sized in a way to supply also the future buildings:
distribution of drinking water
distribution of hot water
distribution of refrigerated water
Gas
Electricity and electrical substation
The drainage system has been planned with two main networks: drains for rainwater and for black waters.
Dimensioning 1: Dimensioning 1 The three school branches shall have separate classes and administrative offices, while the common facilities, i.e., book shop, library, gym, mess, language, physics, and chemical laboratories, green areas, and so on, shall be designed for shared use, in order to optimise the related management costs and, primarily to encourage the interaction between the school components .
Dimensioning 2 : Dimensioning 2 IBO programme: # 32 classrooms
Primary (3 to 11 years age)
Middle (11 to 16 years age)
Diploma (16 to 19 years age)
UK model: # 8 classrooms
Infant (5 to 7 years age)
Junior (7 to 11 years age)
Greek school: #7 classrooms
Elementary (5 to 11 years age) 6 classrooms
Pre-school (< 5 years age) 1 classrom
Outstanding issues: Outstanding issues Entrance to the school from Via Madonna del Pantano;
Helicopter landing pad;
US Satellite receiver site;
Water compensation tank
Questions: Questions Questions should be written in english and italian and submitted electronically to Mr. Giuseppe Fusco JFC Naples J8 – Head Purchasing & Contracting Branch –gfusco@afsouth.nato.int by 17 Sep. 07 17:00h.
Responses to questions will be sent electronically through J8 to all the participants no later than 24 Sep. 07
Financial Specification: Financial Specification
The design proposal shall be marked by a high degree of technical viability, management efficiency and economical feasibility.