logging in or signing up harvey ppt Jeremiah Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 506 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: October 05, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript NRC Update:New Reactor Licensing: R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October 11-13, 2006 NRC Update: New Reactor Licensing http://www.nrc.govPresentation Topics: Presentation Topics Industry Plans for New Reactor Licensing Design Certifications (DCs) Early Site Permits (ESPs) Combined Licenses (COLs) NRC Plans for New Reactor Licensing Update Regulations Update Regulatory Guidance Design-Centered Review Approach Increase Staffing http://www.nrc.govDesign Certifications: Design Certifications Approved ABWR (GE Advanced Boiling Water Reactor) System 80+ (Combustion Engineering) AP600 (Westinghouse) AP1000 (Westinghouse) Currently under Review ESBWR (GE Economic Simplified Boiling Water Reactor) To Be Submitted EPR (AREVA Pressurized Water Reactor) Two unannounced Technologies http://www.nrc.govEarly Site Permits: Early Site Permits Currently under Review Grand Gulf (Entergy – Mississippi) (Review Complete 01/07) Clinton (Exelon – Illinois) (Review Complete 05/07) North Anna (Dominion – Virginia) (Review Complete 12/07) Vogtle (Southern Co – Georgia) (Received 8/06) To Be Submitted One in 2007 Two TBD http://www.nrc.govCombined Licenses: Combined Licenses 2007 About 11 applications expected for approximately 22 units 2008 About 8 applications expected 2009 1 application expected http://www.nrc.govNRC Regulatory Process: NRC Regulatory Process http://www.nrc.govNRC Federal Guidance: NRC Federal Guidance 10 CFR Part 20: Standards for protection against radiation 10 CFR Part 50: Domestic licensing of production and utilization facilities 10 CFR Part 51: Environmental protection regulations for domestic licensing and related regulatory functions 10 CFR Part 52: Early site permits; standard design certifications; and combined licenses for nuclear power plants (Proposed rule change 71 FR 12782, 03/13/06) 10 CFR Part 100: Reactor site criteria http://www.nrc.govNRC Regulatory Guides: NRC Regulatory Guides New Reactor Application Contents Regulatory Guide 1.70: Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants Draft Guide (DG) 1145: Combined License Applications for Nuclear Power Plants (LWR Edition) (Draft for Public Comment) http://www.nrc.govNRC Standard Review Plans: NRC Standard Review Plans NUREG-0800: Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants Being updated (March 2007) to address: 10 CFR Part 50 (CP and OL) applications 10 CFR Part 52 (ESP, DC, and COL) applications http://www.nrc.govDG-1145 & NUREG-0800 Format: DG-1145 & NUREG-0800 Format Section 2.3 Meteorology 2.3.1 Regional Climatology 2.3.2 Local Meteorology 2.3.3 Onsite Meteorological Measurements Program 2.3.4 Short-Term Atmospheric Dispersion Estimates for Accident Releases 2.3.5 Long-Term Atmospheric Dispersion Estimates for Routine Releases http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.1 Regional Climatology RG 1.27: Ultimate Heat Sink for Nuclear Power Plants RG 1.76: Design Basis Tornado for Nuclear Power Plants DG-1143: Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.2 Local Meteorology RG 1.23: Onsite Meteorological Programs DG-1164: Meteorological Monitoring Programs for Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.3 Onsite Meteorological Monitoring Program RG 1.23: Onsite Meteorological Programs DG-1164: Meteorological Monitoring Programs for Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.4 Short-Term Atmospheric Dispersion Estimates for Accident Releases RG 1.78: Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release RG 1.145: Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants RG 1.194: Atmospheric Relative Concentrations for Control Room Radiological Habitability Assessments at Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.5 Long-Term Atmospheric Dispersion Estimates for Routine Releases RG 1.111: Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors http://www.nrc.govNRC Staffing Plans: NRC Staffing Plans Hire approximately 350 new staff members over a two-year period to review expected new plant (ESP, DC, and COL) applications Form Office of New Reactors (NRO) Split technical staff among NRR and NRO NRC meteorological staff for safety analysis review increasing from 2 to approximately 5 http://www.nrc.govConclusion: Conclusion Nuclear Industry is expanding with approximately 20 new ESP, DC, and COL applications expected within the next 2-3 years NRC is preparing for new applications by: Re-organizing and adding new staff Revising and updating regulations and regulatory guidance (Regulatory Guides and NUREG-0800) DG-1145: Form and Content of COL Applications NUREG-0800: Section 2.3 DG-1164: Onsite Meteorological Programs http://www.nrc.gov You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
harvey ppt Jeremiah Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 506 Category: Entertainment License: All Rights Reserved Like it (0) Dislike it (0) Added: October 05, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript NRC Update:New Reactor Licensing: R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October 11-13, 2006 NRC Update: New Reactor Licensing http://www.nrc.govPresentation Topics: Presentation Topics Industry Plans for New Reactor Licensing Design Certifications (DCs) Early Site Permits (ESPs) Combined Licenses (COLs) NRC Plans for New Reactor Licensing Update Regulations Update Regulatory Guidance Design-Centered Review Approach Increase Staffing http://www.nrc.govDesign Certifications: Design Certifications Approved ABWR (GE Advanced Boiling Water Reactor) System 80+ (Combustion Engineering) AP600 (Westinghouse) AP1000 (Westinghouse) Currently under Review ESBWR (GE Economic Simplified Boiling Water Reactor) To Be Submitted EPR (AREVA Pressurized Water Reactor) Two unannounced Technologies http://www.nrc.govEarly Site Permits: Early Site Permits Currently under Review Grand Gulf (Entergy – Mississippi) (Review Complete 01/07) Clinton (Exelon – Illinois) (Review Complete 05/07) North Anna (Dominion – Virginia) (Review Complete 12/07) Vogtle (Southern Co – Georgia) (Received 8/06) To Be Submitted One in 2007 Two TBD http://www.nrc.govCombined Licenses: Combined Licenses 2007 About 11 applications expected for approximately 22 units 2008 About 8 applications expected 2009 1 application expected http://www.nrc.govNRC Regulatory Process: NRC Regulatory Process http://www.nrc.govNRC Federal Guidance: NRC Federal Guidance 10 CFR Part 20: Standards for protection against radiation 10 CFR Part 50: Domestic licensing of production and utilization facilities 10 CFR Part 51: Environmental protection regulations for domestic licensing and related regulatory functions 10 CFR Part 52: Early site permits; standard design certifications; and combined licenses for nuclear power plants (Proposed rule change 71 FR 12782, 03/13/06) 10 CFR Part 100: Reactor site criteria http://www.nrc.govNRC Regulatory Guides: NRC Regulatory Guides New Reactor Application Contents Regulatory Guide 1.70: Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants Draft Guide (DG) 1145: Combined License Applications for Nuclear Power Plants (LWR Edition) (Draft for Public Comment) http://www.nrc.govNRC Standard Review Plans: NRC Standard Review Plans NUREG-0800: Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants Being updated (March 2007) to address: 10 CFR Part 50 (CP and OL) applications 10 CFR Part 52 (ESP, DC, and COL) applications http://www.nrc.govDG-1145 & NUREG-0800 Format: DG-1145 & NUREG-0800 Format Section 2.3 Meteorology 2.3.1 Regional Climatology 2.3.2 Local Meteorology 2.3.3 Onsite Meteorological Measurements Program 2.3.4 Short-Term Atmospheric Dispersion Estimates for Accident Releases 2.3.5 Long-Term Atmospheric Dispersion Estimates for Routine Releases http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.1 Regional Climatology RG 1.27: Ultimate Heat Sink for Nuclear Power Plants RG 1.76: Design Basis Tornado for Nuclear Power Plants DG-1143: Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.2 Local Meteorology RG 1.23: Onsite Meteorological Programs DG-1164: Meteorological Monitoring Programs for Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.3 Onsite Meteorological Monitoring Program RG 1.23: Onsite Meteorological Programs DG-1164: Meteorological Monitoring Programs for Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.4 Short-Term Atmospheric Dispersion Estimates for Accident Releases RG 1.78: Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release RG 1.145: Atmospheric Dispersion Models for Potential Accident Consequence Assessments at Nuclear Power Plants RG 1.194: Atmospheric Relative Concentrations for Control Room Radiological Habitability Assessments at Nuclear Power Plants http://www.nrc.govMeteorology Regulatory Guides: Meteorology Regulatory Guides 2.3.5 Long-Term Atmospheric Dispersion Estimates for Routine Releases RG 1.111: Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors http://www.nrc.govNRC Staffing Plans: NRC Staffing Plans Hire approximately 350 new staff members over a two-year period to review expected new plant (ESP, DC, and COL) applications Form Office of New Reactors (NRO) Split technical staff among NRR and NRO NRC meteorological staff for safety analysis review increasing from 2 to approximately 5 http://www.nrc.govConclusion: Conclusion Nuclear Industry is expanding with approximately 20 new ESP, DC, and COL applications expected within the next 2-3 years NRC is preparing for new applications by: Re-organizing and adding new staff Revising and updating regulations and regulatory guidance (Regulatory Guides and NUREG-0800) DG-1145: Form and Content of COL Applications NUREG-0800: Section 2.3 DG-1164: Onsite Meteorological Programs http://www.nrc.gov