logging in or signing up s5 99058 Gulkund Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 50 Category: Product Traini.. License: All Rights Reserved Like it (0) Dislike it (0) Added: September 24, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Technical Specification Group Services and System Aspects TSGS#3(99)190Meeting #3, Yokohama, Japan, 26-28 April 1999 Source: Chair, TSG-SA WG5Title: SA5 #2 WG Meeting ReportDocument for: Information, discussion and approval: Technical Specification Group Services and System Aspects TSGS#3(99)190 Meeting #3, Yokohama, Japan, 26-28 April 1999 Source: Chair, TSG-SA WG5 Title: SA5 #2 WG Meeting Report Document for: Information, discussion and approval TSG-SA/WG5 (Telecom Management) meeting #3 TSGS5#3(99)058 Helsinki, Finland 4th – 7th May 1999 Page 1 Agenda Item: 6.1 Source: Chair Title: Chairman's Summary report of SA5 #2 meeting to Japan TSG-SA (#3) meeting Document for: Information ------------------------------------------------------------------------------------ TSG-SA WG5 (Telecom Management) Report Summaryprepared by A. Yuhan, SA WG5 Chair: TSG-SA WG5 (Telecom Management) Report Summary prepared by A. Yuhan, SA WG5 Chair - General = Full report in sp#3(99)171 - Meeting(s) = 1 meeting (#2) in Morristown, NJ, USA hosted by Omnipoint on 16-18/3/1999 = 15 delegates attended = Jointly with ETSI/TMN5 on the last day - Admin andamp; Organizational = Chairman elected; Vice Chairs still open = Rapporteurs for WI-1 and WI-2 appointed = SA5 ToR revision (sp#3(99)172) -- coordination responsibility TSGS#3(99)190 TSG-SA WG5 (Telecom Management) Report Summary: TSG-SA WG5 (Telecom Management) Report Summary - General = Full report in sp#3(99)171 - Meeting(s) = 1 meeting (#2) in Morristown, NJ, USA hosted by Omnipoint on 16-18/3/1999 = 15 delegates attended = Jointly with ETSI/TMN5 on the last day - Admin andamp; Organizational = Chairman elected; Vice Chairs still open = Rapporteurs for WI-1 and WI-2 appointed = SA5 ToR revision (sp#3(99)172) -- coordination responsibility TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Inter-Organizational = RAN3 on Oandamp;M over Iu and Iub Interface - Phase 1 work to be completed by June - RAN3 working on functional model analysis - SA5 working on overall Telecom management requirements and TMN framework and architecture = SA1 on Billing and charging - SA1 Service requirements requested = ETSI/TMN5 - All TMN5 UMTS management projects handed over to SA5 - TMN5 defunct/dissolved TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Technical = WI-1 (3G telecom management requirements and principles) - UMTS 21.06 version 3.0.0 taken as baseline - 3G TS 32.001 version 0.0.0 (sp#3(99)173) for information to SA - initial completion by by June 1999 - Major issues: Decesion on scope of telecom management Collection of operator inputs = WI-2 (3G TMN framework and architecture) - TMN 05.002 (draft) taken as baseline - 3G TS 32.002 version 0.0.0 (sp#3(99)174 for information to SA - initial completion by by June 1999 - Major issues: Protocol choices (e.g., CMIP, SNMP, Cobar, etc.) MIM description technology choices (e.g., GDMO, etc.) TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Issues = ITU-T SG11 JQG6 (IMT2000 Management) = Management of subnetworks (other than RAN) - Terminal, SIM, CN = Management at business and service level - Accounting management - Customer service management - Difficulties = Not enough support from non-ETSI participants - 3G telecom management may not be more open than 2G’s TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Future Meetings No. Date Place Host Remarks #3 4-7/5/1999 Helsinki, Finland Sonera, LTD #4 2-4/6/1999 Cambridge, UK Lucent Newly set after SA5 #3 #5 27-30/7/1999 TBD TBD #6 31/8-3/9/1999 TBD TBD #7 Wk/ 25/10/99 TBD TBD #8 13-17/12/1999 Same as SA place Same as SA host Consecutively with SA TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - TSG level action requested = Approve the Report (Tdoc sp#3(99)171) = Approve the SA5 ToR change request (Tdoc sp#3(99)172) = Accept for SA information 3G TS 32.001 version 0.0.0 = Accept for SA information 3G TS 32.002 version 0.0.0 You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
s5 99058 Gulkund Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINT Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 50 Category: Product Traini.. License: All Rights Reserved Like it (0) Dislike it (0) Added: September 24, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript Technical Specification Group Services and System Aspects TSGS#3(99)190Meeting #3, Yokohama, Japan, 26-28 April 1999 Source: Chair, TSG-SA WG5Title: SA5 #2 WG Meeting ReportDocument for: Information, discussion and approval: Technical Specification Group Services and System Aspects TSGS#3(99)190 Meeting #3, Yokohama, Japan, 26-28 April 1999 Source: Chair, TSG-SA WG5 Title: SA5 #2 WG Meeting Report Document for: Information, discussion and approval TSG-SA/WG5 (Telecom Management) meeting #3 TSGS5#3(99)058 Helsinki, Finland 4th – 7th May 1999 Page 1 Agenda Item: 6.1 Source: Chair Title: Chairman's Summary report of SA5 #2 meeting to Japan TSG-SA (#3) meeting Document for: Information ------------------------------------------------------------------------------------ TSG-SA WG5 (Telecom Management) Report Summaryprepared by A. Yuhan, SA WG5 Chair: TSG-SA WG5 (Telecom Management) Report Summary prepared by A. Yuhan, SA WG5 Chair - General = Full report in sp#3(99)171 - Meeting(s) = 1 meeting (#2) in Morristown, NJ, USA hosted by Omnipoint on 16-18/3/1999 = 15 delegates attended = Jointly with ETSI/TMN5 on the last day - Admin andamp; Organizational = Chairman elected; Vice Chairs still open = Rapporteurs for WI-1 and WI-2 appointed = SA5 ToR revision (sp#3(99)172) -- coordination responsibility TSGS#3(99)190 TSG-SA WG5 (Telecom Management) Report Summary: TSG-SA WG5 (Telecom Management) Report Summary - General = Full report in sp#3(99)171 - Meeting(s) = 1 meeting (#2) in Morristown, NJ, USA hosted by Omnipoint on 16-18/3/1999 = 15 delegates attended = Jointly with ETSI/TMN5 on the last day - Admin andamp; Organizational = Chairman elected; Vice Chairs still open = Rapporteurs for WI-1 and WI-2 appointed = SA5 ToR revision (sp#3(99)172) -- coordination responsibility TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Inter-Organizational = RAN3 on Oandamp;M over Iu and Iub Interface - Phase 1 work to be completed by June - RAN3 working on functional model analysis - SA5 working on overall Telecom management requirements and TMN framework and architecture = SA1 on Billing and charging - SA1 Service requirements requested = ETSI/TMN5 - All TMN5 UMTS management projects handed over to SA5 - TMN5 defunct/dissolved TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Technical = WI-1 (3G telecom management requirements and principles) - UMTS 21.06 version 3.0.0 taken as baseline - 3G TS 32.001 version 0.0.0 (sp#3(99)173) for information to SA - initial completion by by June 1999 - Major issues: Decesion on scope of telecom management Collection of operator inputs = WI-2 (3G TMN framework and architecture) - TMN 05.002 (draft) taken as baseline - 3G TS 32.002 version 0.0.0 (sp#3(99)174 for information to SA - initial completion by by June 1999 - Major issues: Protocol choices (e.g., CMIP, SNMP, Cobar, etc.) MIM description technology choices (e.g., GDMO, etc.) TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Issues = ITU-T SG11 JQG6 (IMT2000 Management) = Management of subnetworks (other than RAN) - Terminal, SIM, CN = Management at business and service level - Accounting management - Customer service management - Difficulties = Not enough support from non-ETSI participants - 3G telecom management may not be more open than 2G’s TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - Future Meetings No. Date Place Host Remarks #3 4-7/5/1999 Helsinki, Finland Sonera, LTD #4 2-4/6/1999 Cambridge, UK Lucent Newly set after SA5 #3 #5 27-30/7/1999 TBD TBD #6 31/8-3/9/1999 TBD TBD #7 Wk/ 25/10/99 TBD TBD #8 13-17/12/1999 Same as SA place Same as SA host Consecutively with SA TSG-SA WG5 (Telecom Management) Report Summary (cont.): TSG-SA WG5 (Telecom Management) Report Summary (cont.) - TSG level action requested = Approve the Report (Tdoc sp#3(99)171) = Approve the SA5 ToR change request (Tdoc sp#3(99)172) = Accept for SA information 3G TS 32.001 version 0.0.0 = Accept for SA information 3G TS 32.002 version 0.0.0