Strategies for Mitigation of Environmental Impacts from a Closed Municipal Landfill: 

Strategies for Mitigation of Environmental Impacts from a Closed Municipal Landfill Steven Rose1, Paul MacLatchy2, Greg Bickerton3, Dale VanStempvoort3 NATO - CCMS Pilot Study Meeting Cardiff, Wales May 23-26, 2004

Outline: 

Outline Site Location / Setting / History Site Characterization andamp; Contaminants Current Site Management / Long-Term Objectives Feasibility Studies Complementary Studies

Site Location: 

* SoftMap Technologies Inc., Topo 50, Southern Ontario Site Location

Slide4: 

courtesy of City of Kingston

Slide5: 

1953

Site Characterization: 

Elevation (m) Cover Waste Peat Clay / Silt Water Level 95 90 85 80 75 70 Site Characterization

River Elevations (masl): 

River Elevations (masl)

Slide8: 

Groundwater Flow

Slide9: 


Site Chemistry ~ 540 Samples: 

Site Chemistry ~ 540 Samples Contaminants of Concern Iron Ammonia

Current Site Management: 

Current Site Management Weekly Site Observation Visits Periodic Sampling Active Groundwater Pumping

Groundwater Pumping: 

Groundwater Pumping

Groundwater Extraction: 

Groundwater Extraction active seepage management labour intensive water taking by permit costly

Long-Term Management Objectives: 

Long-Term Management Objectives maintain site use less active (more passive) site management mitigated environmental impacts regulatory compliance public acceptance

Feasibility Studies: 

Feasibility Studies OTHER STUDIES benthic / sediment studies long-term options review independent investigations

Phreatophyte Tree Plots: 

Phreatophyte Tree Plots Salix nigra (black willows) Populus balsamifera (balsam poplars) hydraulic control of shallow groundwater native species willows already on-site

Phreatophyte Tree Plots: 

Phreatophyte Tree Plots west stream Black Willow Balsam Poplar

Phreatophytes - Challenges & Stressors: 

Phreatophytes - Challenges andamp; Stressors Weather Shoot Blight Caterpillars Vandalism

Constructed Wetland: 

Constructed Wetland shallow fringe wetland in-water construction 2 - 35 m x 35 m cells cattails vegetation

Constructed Wetland – Schematic Section: 

Substrate Mattresses Diffuser Silt Barrier Constructed Wetland – Schematic Section Landfill

Constructed Wetland - Monitoring: 

Constructed Wetland - Monitoring Quarterly sampling surface water substrate groundwater Chemical Analyses nitrogen iron indicators

Constructed Wetland – First Season Growth: 

Constructed Wetland – First Season Growth little growth before late July cattails (from seeds andamp; rhizomes) grasses, sedges, rushes populated by birds, fish, amphibians

Environment Canada Test Site: 

Environment Canada Test Site

Sap Flow Probes: 

Sap Flow Probes

Monitoring Well with LeveLogger: 

Monitoring Well with LeveLogger

Sap Flow & Vapour Pressure Deficit: 

Sap Flow VPD Sap Flow andamp; Vapour Pressure Deficit

Water Level Fluctuations: 

1 m from tree 11 m from tree Water Level Fluctuations

Future Work: 

Future Work Continued Evaluation of Feasibility Technologies Assessment of Near Shore Impacts Evaluation of Long-term Management Options Public Consultation

Additional Information: 

Additional Information www.cityofkingston.ca/ residents/ environment/ bellepark/ index.asp Steven Rose, P.Eng. Malroz Engineering Inc. rose@malroz.com