Presentation Transcript
Strategies for Mitigation of Environmental Impacts from a Closed Municipal Landfill : Strategies for Mitigation of Environmental Impacts from a Closed Municipal Landfill Steven Rose1, Paul MacLatchy2,
Greg Bickerton3, Dale VanStempvoort3
NATO - CCMS Pilot Study Meeting
Cardiff, Wales
May 23-26, 2004
Outline : Outline Site Location / Setting / History
Site Characterization andamp; Contaminants
Current Site Management / Long-Term Objectives
Feasibility Studies
Complementary Studies
Site Location : * SoftMap Technologies Inc., Topo 50, Southern Ontario Site Location
Slide4 : courtesy of City of Kingston
Slide5 : 1953
Site Characterization : Elevation (m) Cover Waste Peat Clay / Silt Water Level 95 90 85 80 75 70 Site Characterization
River Elevations (masl) : River Elevations (masl)
Slide8 : Groundwater Flow
Slide9 :
Site Chemistry ~ 540 Samples : Site Chemistry ~ 540 Samples
Contaminants
of Concern
Iron
Ammonia
Current Site Management : Current Site Management
Weekly Site Observation Visits
Periodic Sampling
Active Groundwater Pumping
Groundwater Pumping : Groundwater Pumping
Groundwater Extraction : Groundwater Extraction
active seepage management
labour intensive
water taking by permit
costly
Long-Term Management Objectives : Long-Term Management Objectives maintain site use
less active (more passive) site management
mitigated environmental impacts
regulatory compliance
public acceptance
Feasibility Studies : Feasibility Studies OTHER STUDIES
benthic / sediment studies
long-term options review
independent investigations
Phreatophyte Tree Plots : Phreatophyte Tree Plots Salix nigra
(black willows)
Populus balsamifera
(balsam poplars)
hydraulic control of shallow groundwater
native species
willows already on-site
Phreatophyte Tree Plots : Phreatophyte Tree Plots west stream Black Willow Balsam Poplar
Phreatophytes - Challenges & Stressors : Phreatophytes - Challenges andamp; Stressors Weather
Shoot Blight
Caterpillars
Vandalism
Constructed Wetland : Constructed Wetland
shallow fringe wetland
in-water construction
2 - 35 m x 35 m cells
cattails vegetation
Constructed Wetland – Schematic Section : Substrate Mattresses Diffuser Silt Barrier Constructed Wetland – Schematic Section Landfill
Constructed Wetland - Monitoring : Constructed Wetland - Monitoring Quarterly sampling
surface water
substrate
groundwater
Chemical Analyses
nitrogen
iron
indicators
Constructed Wetland – First Season Growth : Constructed Wetland – First Season Growth
little growth before late July
cattails (from seeds andamp; rhizomes)
grasses, sedges, rushes
populated by birds, fish, amphibians
Environment Canada Test Site : Environment Canada Test Site
Sap Flow Probes : Sap Flow Probes
Monitoring Well with LeveLogger : Monitoring Well with LeveLogger
Sap Flow & Vapour Pressure Deficit : Sap Flow VPD Sap Flow andamp; Vapour Pressure Deficit
Water Level Fluctuations : 1 m from tree 11 m from tree Water Level Fluctuations
Future Work : Future Work
Continued Evaluation of Feasibility Technologies
Assessment of Near Shore Impacts
Evaluation of Long-term Management Options
Public Consultation
Additional Information : Additional Information www.cityofkingston.ca/
residents/
environment/
bellepark/
index.asp
Steven Rose, P.Eng.
Malroz Engineering Inc.
rose@malroz.com
Catch the
buzz on authorSTREAM
Copyright © 2002-2008 authorSTREAM. All rights reserved.