Underground Waste Transport Technology : 

Underground Waste Transport Technology Jonas Törnblom Director Corporate Marketing & Communications 19,06 cm X 12,3 cm

Envac: 

Envac Stationary waste collection system

Stora Ursvik – a new mixed urban area in Stockholm: 

Stora Ursvik – a new mixed urban area in Stockholm 3 488 flats 135 000 m2 offices, retail etc. 1 school

Waste deposit points and waste quantities: 

Waste deposit points and waste quantities 113 waste deposits with 3 waste fractions Handling: 389 m3 waste to energy 127 m3 paper 69 m3 organic waste per week at normal duty. Heavy duty - 20% more. Placement of the 113 waste deposit points

Waste generation patterns: 

Waste generation patterns Time profiles for Stora Ursvik Typical profiles för for waste generation for flats, offices and retail during a normal week. Offices - school Retail Flats Waste disposal during a normal week x-axis: each column represents 2 t, y-axis: depicts the weekly disposal

Service level – normal duty: 

Service level – normal duty Full valves and bins Underground waste transport: no. of full valves*) 7 Accumulated time with full inlets 1.4hs Conventional waste collection: no. of full bins 14 Accumulated time with full bins 155hs No. of full valves/bins during a normal week UWT Conventional *) excess capacity of 200 l means that the inlet is not perceived as full.

Service level – high duty: 

Service level – high duty Full valves and bins Underground waste transport: no. of full valves*) 44 Accumulated time with full inlets 5 hs Conventional waste collection: no. of full bins 139 Accumulated time with full bins 1841hs A lot of full bins during a longer period of time Full bins – causing littering and inconeniance for users UWT Conventionell No. of full valves/bins during a normal week

Environmental impact from waste handling traffic – heavy duty : 

Environmental impact from waste handling traffic – heavy duty

Waste truck traffic in the area: 

Waste truck traffic in the area Normal duty Heavy duty UWT Conv. UWT Conv. Day 1 7:00 – 7:40 6:00 -13:30 7:00 – 7:40 6:00 – 14:20 Day 2 7:00 – 7:40 6:00 -13:20 7:00 – 7:40 6:00 – 13:00 Day 3 7:00 – 7:40 6:00 -13:50 7:00 – 7:40 6:00 – 13:40 Day 4 7:00 – 7:40 6:00 -14:20 7:00 – 8:20 6:00 – 13:50 Day 5 7:00 – 7:40 6:00 -11:55 7:00 – 7:40 6:00 – 14:30 1-3 vehicles in the area at the same time during conventional collection. 1 vehicle in operation during UWT collection.

Emissions to air through waste trucks in area: 

Emissions to air through waste trucks in area Relative comparison

Slide16: 

Delivering a New Wembley

New Wembley: 

New Wembley 42 acres (17 hectares) mixed use regeneration 4 500 new flats 6 000 new jobs (63,000 m2 new office space) Hilton Hotel/ Plaza acquisition completed 1st September 2006 Shopping 34,000 m2; designer outlets, sports outlets, stores 12,700 m2 restaurants, bars etc.

Wembley - Sustainability & Other Issues: 

Wembley - Sustainability & Other Issues Mixed tenure Joint Venture with Family & Genesis Housing Associations Gas fired centralised heating with CHP Water management strategy Eco-Homes Very Good Envac waste management strategy encouraging recycling Very Positive on LBB Sustainability Register Soft landscaping to encourage ecological diversity

QEDs Involvement in the Envac Technology: 

QEDs Involvement in the Envac Technology 2005 visit to Hammarby Sjöstad in Stockholm QED sustainability agenda Mike Youkee previous residential experience Increased governmental interest in green agenda

Underground Waste Transportation System at New Wembley: 

Underground Waste Transportation System at New Wembley Total investment £ 4 400 000 No of fractions total: 7 Fractions handled by the Envac system: Co-mingled recyclables Organics (food waste) Rest Waste volume: 88 m3/day (Envacable fractions) No inlets: 287 3 530 m pipe Access cards for commercial users

The Stage 1 Planning Consent: 

The Stage 1 Planning Consent

W01 in Context: 

W01 in Context

W01: 

W01 286 high quality apartments 145 private 86 key worker 55 social for rent Studios, 1, 2 or 3 bedrooms including some duplexes 8 composite business and residential units 300 sq m of retail space Basement parking A new community creche An employment portal Quality communal landscaped areas and private open space

Wembley - Envac Advantages acc. to QED: 

Wembley - Envac Advantages acc. to QED Development space saving Reduced revenue costs Better liveability Improved social interaction Better values