DEFENSE ENERGY SUPPORT CENTER KOREA: 

DEFENSE ENERGY SUPPORT CENTER KOREA

AGENDA: 

AGENDA CURRENT QUALITY COVERAGE BUSINESS UPDATE FAS CONVERSION WARFIGHTER ISSUES/INITIATIVES MRandamp;E PROGRAM OPTIMIZATION INITIATIVE POST TKP BULK POL SPT WHNS

DESC-K / DCMA QUALITY COVERAGE: 

22 Contracts In 15 Locations Plus Okinawa YOSU ULSAN ONSAN Pohang Uijongbu Yechon Taegu AB Kwangju Suwon Pyongtaek Kunsan Osan Kimhae Waegwan DESC-K / DCMA QUALITY COVERAGE Daesen Ulsan Yosu Onsan

Slide4: 

BUSINESS UPDATE FY 02 Tanker/Barge Receipts/Issues Pohang 46.3 mil /59 mil Kunsan 12.2 mil/11.4 mil Total 58.5 mil/70.4 mil DFSP Receipts/Issues 59.8 mil/58.7 mil Rail Tank Car Deliveries 23.2 mil Pipeline Throughput 58 mil Tank Truck Deliveries 36.4 mil Air Force Receipts/Issues 41 mil/43.2 mil Army Receipts/Issues 18 mil/17.4 mil

Slide5: 

SEOUL UIJONGBU CHUNCHON TONGDUCHON WONJU PYONGTAEK KUNSAN WAEGWAN TAEGU PUSAN YONGSAN 1027 CP HUMPHREYS 1026 SONGNAM CP PAGE 1026 CP CARROLL 1027 CAMP LONG 1026 CAMP WALKER 1027 CP STANLEY 1026 YONGSAN CAMP EDWARDS 1027 CAMP RED CLOUD 1026 CAMP BONIFAS 1026 GEUMCHON OSAN AREA IV AREA II AREA III AREA I K-16 AIRFIELD 1027 CAMP CASEY 1026 CAMP CASTLE 1026 CAMP EAGLE 1026 FAS STATUS (ARMY) CP HIALEAH 1027

Slide6: 

SEOUL UIJONGBU CHUNCHON TONGDUCHON WONJU PYONGTAEK KUNSAN WAEGWAN TAEGU PUSAN KUNSAN SONGNAM TAEGU KWANG JU YONGSAN SUWON GEUMCHON OSAN OSAN KWANG JU SUWON FAS STATUS (AIR FORCE) AIR FORCE DFSP’S 100% CONVERTED TO FAS 1027

WARFIGHTER ISSUES/MAJOR INITIATIVES: 

WARFIGHTER ISSUES/ MAJOR INITIATIVES MRandamp;E PROGRAM OPTIMIZATION STUDY POST TKP BULK POL SPT WHNS

DESC KOREA MR&E PROGRAM: 

DESC KOREA MRandamp;E PROGRAM

DESC KOREA MR&E PROGRAMPROCESS: 

DESC KOREA MRandamp;E PROGRAM PROCESS 5 Yr Program Designed to Transform Korea’s POL Infrastructure Conducted in 3 phases using innovative project mgt processes Expected Completion is FY 03 PROGRAM GOAL: STATE OF THE ART FACILITIES THAT ARE SAFE AND ENVIRONMENTALLY SOUND MATOC STANDARDIZED DESIGN/ CONSTRUCTION PKGS

Slide10: 

PHASE ONE ORGANIZATIONS AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE KOREA DEFENSE ENERGY SUPPORT CENTER FACILITIES DIVISION DEFENSE ENERGY SUPPORT CENTER-TAEGU FACILITIES DIVISION THE IT CORPORATION PROJECT MANAGER THE IT CORPORATION TECHNICAL SERVICES THE IT CORPORATION PROGRAM MANAGER SAMSUNG (Contractor) MATIS (Contractor) PINETREE (Sub-Contractor) THE IT CORPORATION SITE MANAGERS

Slide11: 

PHASE TWO andamp; THREE ORGANIZATION AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE DEFENSE ENERGY SUPPORT CENTER FACILITIES DIVISION DEFENSE ENERGY SUPPORT CENTER-KOREA SHAW ENVIRONMENTAL WESTON INCORPORATED Sub-Contractors MATOC Sub-Contractors SITE MANAGERS NAVAL FACILITIES ENGINEERING SERVICE CENTER 2 Contract Vehicles Vice 1

EQUIPMENT DELIVERIES: 

SEOUL SUWON OSAN WAEGWAN POHANG ULSAN PUSAN YOSU UIJONGBU KWANGJU ONSAN K-2 TAEJON PYONGTAEK YECHON POHANG BD KANGNAM KIMPO KOYANG SONGNAM DAESAN INCHON KIMHAE MECHANICAL EQUIPMENTS andamp; PARTS (TANKS, PUMPS, DISPENSERS, ETC., SHIPPED FROM CONUS AND BEING TRANSPORTED OVERLAND TO EACH FACILITY AS A 'TURN KEY' OPERATION KUNSAN EQUIPMENT DELIVERIES

TMP UPGRADE SPECIFICATIONS: 

TMP UPGRADE SPECIFICATIONS Facility Upgrade Includes: New Product Storage Tanks (JP8, MOGAS and Diesel) and Pads Upgrade Product Pumps, Pipes and Dispensers Upgrade Oil-Water Separator Upgrade Electrical Distribution System and ATG Installation of Double-Walled POL PVC Pipeline Upgrade Water Line and Installation of Fire Hydrant Installation of Drum Storage and Handling Area (As Required) Installation of Canopy and Dispenser Islands Pavement Upgrades Installation / Upgrade of Spill Containment Installation of Emergency Eye Wash/Shower Station and Water Line

Slide14: 

SEOUL UIJONGBU CHUNCHON TONGDUCHON WONJU KUNSAN WAEGWAN TAEGU PUSAN YONGSAN TMP SONGNAM CP PAGE Hot Refuel/TMP CAMP LONG TMP YONGSAN CAMP EDWARDS TMP/Rail Head-Bulk Issue CAMP RED CLOUD TMP CAMP BONIFAS TMP AREA II AREA III K16 AIRFIELD Cold Refuel CAMP EAGLE Hot Refuel/TMP AREA I CAMP CASEY TMP PHASE ONE SITE LOCATIONS OSAN PYONGTAEK PANMUJON

Slide15: 

SEOUL UIJONGBU CHUNCHON TONGDUCHON WONJU KUNSAN WAEGWAN TAEGU PUSAN SONGNAM YONGSAN AREA II AREA III KUNSAN AB (9 Projects) AREA I PHASE TWO SITE LOCATIONS OSAN PYONGTAEK PANMUJON PYONGTAEK (4 Projects) SUWON AB (9 Projects) OSAN AB (14 Projects) SUWON

Slide16: 

SEOUL UIJONGBU CHUNCHON TONGDUCHON WONJU KUNSAN WAEGWAN TAEGU PUSAN SONGNAM YONGSAN AREA II AREA III TAEGU AB (10 Projects) AREA I PHASE THREE SITE LOCATIONS OSAN PYONGTAEK PANMUJON CAMP CARROLL (4 Projects) SUWON CAMP WALKER (2 Projects) KWANG JU KWANG JU AB (11 Projects)

CAMP LONG (BEFORE): 

CAMP LONG (BEFORE)

CAMP LONG (AFTER): 

CAMP LONG (AFTER)

CAMP EAGLE (BEFORE): 

CAMP EAGLE (BEFORE)

CAMP EAGLE (AFTER): 

CAMP EAGLE (AFTER)

CP CASEY/CASTLEFY02 - MILCON: 

CP CASEY/CASTLE FY02 - MILCON

WAY AHEAD (OPTIMIZATION): 

Robust DESC MRandamp;E Upgrade Program 'State-of-the-Art' Petroleum Facilities In Korea Gas Station Upgrades Hot Point Upgrades Bulk Facilities Upgrades Korea Facilities Ideal For GOCO Operations Camp Casey MILCON (replaces Camp Castle Facility, FY02) Highly trained contractors Provides for 'Military Training Base' Provides Environmental compliance Eliminates / Reduces facility 'Down Time' No need for Service to submit MRandamp;E projects for the facility WAY AHEAD (OPTIMIZATION)

Slide23: 

OPTIMIZATION MILESTONES Project Initiation: Request from the Activity (SCP) Milestone One: Initial site visit andamp; requirements review, (DESC Service andamp; Facility personnel) Milestone Two: Requirements refinements and solution development (DESC, Service andamp; Facility personnel) Milestone Three: Contract solicitation andamp; Award (DESC) Final: Projects ends with a post project review (DESC, Service andamp; Facility personnel)

POST TKP BULK POL SUPPORT: 

POST TKP BULK POL SUPPORT 'Significance: The Trans Korean Pipeline (TKP) is integral to fuel support operations, particularly during contingency. The ROKG announced plans to close the TKP on or about 30 Sep 02. For the past 5-6 years USFK, DESC, and MND have been developing and refining POL support plans for US Forces Korea during Armistice and Contingency in a Post-Trans Korea Pipeline environment. We are still working out the details of pipeline support in order to close the TKP.' LTC Gaslin, USFK SAPO TKP/SNP ENDSTATE DESC COMMITTED IN ITS SUPPORT OF USFK EFFORT

WHNS: 

WHNS DESC PROVIDES INPUT/TECHNICAL ADVICE DURING PLANNING AND IS INDUSTRY INTERFACE IN CONTINGENCY DESC CDR SERVES AS SAPO IF ONE IS NOT ASSIGNED BOTTOM LINE: DESC-K MUST STAY INVOLVED IN WHNS PROCESS

Slide26: 

?? QUESTIONS ??

Slide27: 

COMMANDER LTC HEIDI GRAHAM DSN 315.764.5147 DEPUTY COMMANDER MR MIKE ANDERSON DSN 315.764.5131 POL OPNS MAJ Wayne Goulet DSN 315.764.5139 QUALITY (Lead QSR) Mr Leo Burruel DSN 315.764.7431 MGMT SPT Mr Brian Adkins DSN 315.764.5183 QUALITY SUPPORT TEAM NORTH QUALITY SUPPORT TEAM SOUTH INV MGMT OPNS TRANS MGMT FACILITIES Mr Rick Rivera 315.764.5089 DESC KOREA ORGANIZATION