U/G Unit Cost Analysis:
U/G Unit Cost Analysis Objective In support of the ongoing ILC Reference Design Report effort, prepare unit cost estimates for the underground structures and the construction support facilities for the conventional facilities associated with the International Linear Collider (ILC) sited at a Northeastern Illinois location.
Organization:
Organization Project Manager
Bruce Shelton Cost Control Engineer Contracts
Doug Madrigal Quality Assurance
Tim Brown ES&H Engineer
Jere Bonner Project Sponsor
Willie Clark, III Tunnel Engineer
Jon Kaneshiro/John Carr Civil/Structural Engineer
Mike Seiler Chief Estimator
Roger Carlos Mechanical/ Electrical Engineer
Ried Jacobson CAD Designer Scheduler Estimator
Mike Kirchner
Summary Schedule:
Summary Schedule
U/G Unit Cost Analysis:
U/G Unit Cost Analysis Scope of Work
Develop Technical Basis of Analysis
Review the available geotechnical data from similar projects performed in the general vicinity of the proposed NE Illinois location
Based on the above review establish a technical basis for the preparation of unit cost estimates for the conventional facilities elements
U/G Unit Cost Analysis:
U/G Unit Cost Analysis Scope of Work (cont’d)
Develop the Summary of Costs Report establishing the unit cost estimates for the following elements of the conventional facilities
Tunnels
Shafts
Caverns/Halls
• Const Support Facilities
U/G Unit Cost Analysis:
U/G Unit Cost Analysis Current Status
Technical Basis is nearly complete and a draft of the basis report is being prepared for internal review
Unit cost estimates are being initiated as the technical basis of the individual elements is established
Scheduled for completion on 12/18/06
U/G Unit Cost Analysis:
U/G Unit Cost Analysis