Underground Unit Cost Analysis

U/G Unit Cost Analysis: 

U/G Unit Cost Analysis Objective In support of the ongoing ILC Reference Design Report effort, prepare unit cost estimates for the underground structures and the construction support facilities for the conventional facilities associated with the International Linear Collider (ILC) sited at a Northeastern Illinois location.

Organization: 

Organization Project Manager Bruce Shelton Cost Control Engineer Contracts Doug Madrigal Quality Assurance Tim Brown ES&H Engineer Jere Bonner Project Sponsor Willie Clark, III Tunnel Engineer Jon Kaneshiro/John Carr Civil/Structural Engineer Mike Seiler Chief Estimator Roger Carlos Mechanical/ Electrical Engineer Ried Jacobson CAD Designer Scheduler Estimator Mike Kirchner

Summary Schedule: 

Summary Schedule

U/G Unit Cost Analysis: 

U/G Unit Cost Analysis Scope of Work Develop Technical Basis of Analysis Review the available geotechnical data from similar projects performed in the general vicinity of the proposed NE Illinois location Based on the above review establish a technical basis for the preparation of unit cost estimates for the conventional facilities elements

U/G Unit Cost Analysis: 

U/G Unit Cost Analysis Scope of Work (cont’d) Develop the Summary of Costs Report establishing the unit cost estimates for the following elements of the conventional facilities Tunnels Shafts Caverns/Halls • Const Support Facilities

U/G Unit Cost Analysis: 

U/G Unit Cost Analysis Current Status Technical Basis is nearly complete and a draft of the basis report is being prepared for internal review Unit cost estimates are being initiated as the technical basis of the individual elements is established Scheduled for completion on 12/18/06

U/G Unit Cost Analysis: 

U/G Unit Cost Analysis