Status of Applications IVISDEP Spin Glass: 

Status of Applications IVISDEP Spin Glass Sergio Pérez Gaviro (spgaviro@unizar.es) Rubén Vallés Pérez (rvalles@unizar.es) BIFI Lisbon Integration Meeting, November 2007

Current status: 

Current status MPI support Graphical Interface GLUT adapted. Support for keyboard and mouse GLUT callbacks for steering Fully integrated with Gvid.

Current status: 

Current status Protocol for interactive events. Java plugin (GUP) --> Fusion Application key=value string Integration with MD Fully operational (Demo Manchester) Improve submission input parameters from MD (xml) Storage of files

Integration work: 

Integration work Define new controls in Java plugin to manage new features in development Change the way of submitting application to store data.

Spin Glass Model: 

Spin Glass Model Spin Glass problem (Edwards-Andersson) with three dimensional spins of Heisenberg. Study of phase transition and critical values. Update of the system using HeatBath algorithm + Parallel tempering They are long simulations. Needed a lot of steps to stabilize the whole system. It would be helpfull some way of checkpointing (files generated) to restart application.

Spin Glass Model: 

Spin Glass Model Interactivity not needed at the moment PACX-MPI most interesting feature of I2G. Pro: Simulation with great number of nodes. Con: The slowest WN is the maximun speed of whole system. Problem if checking beta != numProc +1 ???

Spin Glass Model (MPI schemme): 

Spin Glass Model (MPI schemme) MASTER (initialization) Slave1 HB+OV Slave2 HB+OV Slave3 HB+OV SlaveN HB+OV MASTER (Parallel Tempering) E E E E Slave1 HB+OV Slave2 HB+OV Slave3 HB+OV SlaveN HB+OV T T T T ……

Spin Glass Model (MPI schemme): 

Spin Glass Model (MPI schemme) MASTER Input files Par. Tempering Obs+=obs[ ] …. Normalize obs Write files SLAVE HB+OV Meassures LOOP HB+OV Initial configuration Energy Updated beta Obs Energy

Slide9: 

Thanks for your attention