Share PowerPoint. Anywhere!

Mikkel Olesen

Featured Animated Featured Animated
Uploaded from authorPOINT
Download as Download Not Available PPT
Presentation Description

No description available

Like authorSTREAM?


You can vote once a day till December
10th, Vote Now!
Views: 93
Like it  ( Likes) Dislike it  ( Dislikes)
Added: June 20, 2007 This presentation is Public
Presentation Category :Education
Presentation StatisticsNew!
Views on authorSTREAM: 92 | Views from Embeds: 1
Others - 1 views
Presentation Transcript

Long haul 10G Ethernet : Long haul 10G Ethernet Dark fiber tests in Denmark Presented by Mikkel Olesen, CERN


Slide2 : Part of the IST ESTA project (Ethernet Switching at 10G and Above) Project members COM institute at Technical University of Denmark CERN in Geneva BATM in Israel


Agenda : Agenda Goals DAREnet dark fibers in Denmark Equipment Lab experiments at COM/DTU Field tests, used setup’s and results Conclusion Future work and use Questions?


Goals : Goals Examine the possibility to use standard 10G Ethernet LAN equipment for long-haul WAN transmission Using DAREnet’s 250km SMF link between Odense and Lyngby If possible find a setup that has a BER below 1E-12 which is the 802.3ae objective Use standard NIC’s and aggregating switch's to verify link with real Ethernet traffic Measure the setup’s power penalty


DAREnet fiber in Denmark : DAREnet fiber in Denmark The 252 km of standard SMF dark fiber between Odense and Lyngby Includes three points for possible amplification, filtering etc. in Nyborg, Næstved and Taastrup


Equipment : Equipment BATM T6 switch Including 10G Uplink module developed at CERN as part of ESTA Optillion TOP 5010-SC Xenpak transceiver 1550 nm optics with maximum reach of 40 km Includes IEEE802.3-2000 PMD BIST capability for BER measurements Optical amp’s and filters


COM lab setup : COM lab setup


Field tests - 1 : Field tests - 1 Setup using pre-amp at receiver 4 amp’s in total per link 3 x 80 km DCF (Dispersion Compensating Fiber) Achieved BER andlt;1E-15 ! Limited by time shortage


BER curves : BER curves


Field tests - 2 : Field tests - 2 Setup without using pre-amp at receiver 3 amp’s in total per link 3 x 80 km DCF Achieved BER andlt;1E-12 Shortage of time limited the experiments on this setup, BER could likely be improved


Picture - Lyngby : Picture - Lyngby Xenpak Amp’s DCF PC Filter and attenuator


Picture – Næstved and Odense : Picture – Næstved and Odense


Conclusion : Conclusion Successfully used standard 10G Ethernet LAN equipment to transmit over 250km of SMF dark fiber (including optical amplification and DCF) Setup meets 802.3ae objective with a BER of 1E-12, best result is below 1E-15 Transmitted full-duplex 8 Gb/s real Ethernet traffic using 16 x 1 Gb/s NIC’s and aggregating switch's Measured setup power penalty at 1E-12 to be 2.5 dB


Conclusion – cond. : Conclusion – cond. The successful results prove the possibility to use low-priced Ethernet LAN equipment for long-haul connections


Future work and use : Future work and use Initial tests show the possibility to extend the reach even further Experiments could for example make use of the dark fibers continuing to Århus and Aalborg A 10 Gb/s link between SDU in Odense and DTU in Lyngby could for example be valuable as a GRID-to-GRID connection


Questions? : Questions?


Back-to-back sensitivity measurement : Back-to-back sensitivity measurement Used to determine the power penalty for the demonstrated setup