ELAN

Uploaded from authorPOINTLite
Views:
 
     
 

Presentation Description

No description available.

Comments

Presentation Transcript

News from ELAN: 

News from ELAN SC of CARE

News from ILC: 

News from ILC At LCWS05 (March at Stanford: 400 participants with MDI+ACCEL) B. Barish has accepted to lead the GDE http://www.fnal.gov/directorate/icfa/ Costing document due end of 2006 3 GDE regional Directors+costing engeneers+30 CORE team (distributed) Snowmass meeting 2 weeks in August to reach ILC configuration Physics (Aspen), Detector, Accelerator (after KeK) EUDET: I3 for detector 8.6 M€ ESFRI priorities for FP7: acknowledges ILC among “Global projects”:http://www.cordis.lu/era/esfri_home.htm - International Large Collider (ILC) - Square Kilometre Array (SKA) – radio telescope – - International Fusion Materials Irradiation Facility (IFMIF) - ITER

Slide3: 

ROADMAP shown at the KeK ILC meeting

ELAN Meetings in 2005: 

ELAN Meetings in 2005 Procedure: relevant European WS +acknowledgement of ELAN support (logo) Document(s) ELAN issued List in http://esgard.lal.in2p3.fr/Project/Activities/Current/Networking/N2/ELAN/Workshops/ Support for international (ILC) meetings: LCWS05 (MDI, ACCEL)+SNOWMASS

Slide5: 

Workshops Supported by ELAN   Avoid duplication with EUROTeV

Slide6: 

Program for a ½ day ELAN program At the London ILC Meeting (June 20-23 2005) Talk on GDE Plans of the GDE X 35+5 Talk on ELAN Future plans of ELAN FR 20+5 Talk on NC CTF, PHIN, Alignt meeting of Annecy GG 35+10 Plans for Snowmass Break 15 minutes Talk on SC TTF,SRF,recent workshops LL 35+10 Plans for Snowmass Talk on ANAD The Paris workshop, future plans BC 35+10 Talk on DR Frascati workshop Maria Enrica Biagini (Frascati) 35+10 Parallel sessions : WP6 only (SC RF) General comments : These talks are meant to be interesting for a general public, giving the general picture but also focusing on some well chosen items which have critical implications

Slide7: 

ILC-BDIR + ELAN + EUROTeV Workshop

ELAN Money: 

ELAN Money Under spent in 2004 mainly DESY INFN CERN 100k/168k More activity expected in 2005 254k requested for 18 months (+15 %) Concern with CNRS money (Comptable from University not accepted, ‘Clause 23’ allows UMR-Orsay to be considered as a contractor TG)

ELAN Management: 

ELAN Management G. Blair has replaced S. Smith Web page for INSTR Two non UE associates: - US: SLAC (M. Ross) - Israel: Technion (S. Tarem) Support for students for an ANAD school in Scotland ? ANAD launching a NEST outline proposal EUROLEAP: European Laser Electron controlled Acceleration in Plasmas to GeV energy range

Conclusion: 

Conclusion After a first year with ‘centralized’ workshops we are moving to a more distributed organization to cope with the ILC and ANAD efforts There will be an ELAN dedicated meeting in London (BDYN-INSTR WS) and also an other one at the end of the year Priority to catch up on INSTR ELAN and EUROTeV complementarities are carefully discussed Flexibility to cope with the ILC evolving situation