Slide1: EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec 8 - 10 , 2004 RICOTTI, Tokai, JAPAN Pohang Accelerator Laboratory
Kiman Ha, M.Y.Oh, J.H Kim, J.M Kim and J.H Choi
hkm@postech.ac.kr PLS Power Supply control and upgrade plan
Slide2: EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN Outline -Status of orbit feedback
-Present status of power supply control
-Digital power supply upgrade plan
-Hardware review and test result
-Summary
Slide3: Orbit feedback status EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN Orbit feedback operation started for user service in November
-Orbit stability with feedback(RMS)
- short term (1 hour) : < 1 m
- long term (12 hours) : < 3 m
Both V and H corrector PS’s are involved for feedback
Slide4: Present PS upgrade status Upgrade status
.Kept vertical Orbit Stability less then 3 m by feedback operation
.Replaced 22 sets of Corrector PS and their Control system in September
-EPICS Control and embedded controller
.Collaboration with BESSY-II (Ralph, Ingo) and Kristi(SLAC)
.Same as BESSY-II, 24Bit DAC Controller
.CANbus field bus with EPICS IOC
.Event System for PS time synchronization EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN
Slide5: Next plan of power supply upgrade EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN -Requirements of corrector PS
.Fast Corrector control system(>1kHz)
.Vertical PS need 20bit of step resolution
.Horizontal PS need 16bit step resolution
2005, will replace all vertical PS
. 2ppm step resolution
. +/-10ppm long term stability
-Feed-forward for ID gap changed
.Install steering magnet
.+/-5A 16bit 1kHz bandwidth PS
Slide6: Fast Control System requirement EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN -PS : >1kHz BW, > 18bit output resolution
- 1 to 5kHz set point
-Event system synchronization
>BPM measurement
>PS control trigger
-Fast beam position and feedback algorithm processing
Slide7: EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN Background of Digital PS development -Implementation of modern power converter technology
.Resent DSP&FPGA show very powerful performance
-Requirements of beam physicists for orbit stabilization
.Slow, fast, and epics based robust control system
-High speed control applications: >4kHz
-High output resolutions: >18bit
-Low cost and small number of hardware components
.Reduce error source
.Easy maintenance
Slide8: Digital Controller Advantage EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN -Modern digital technology(DSP, FPGA,ADC)
-Cost effective and precise power supply
-High flexibility and modularity
-High functionality
-Built in all functions for PS
.Current regulator(PI, feed forwarder)
.Direct PWM generation
.Fast control port
.Analog, Digital I/O
Slide9: EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN Analog- Digital- Converter
8 Analog Input
2 Analog Output DSP-controller incl. FPGA
16 Bit Digital Out
8 bit Digital Input
1 RS232
1 Fiber optics Digital Control Unit
Slide10: Block diagram of Controller Card without software functions EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN From PSI Lukas Security
controller
(Watchdog) 24 V BUS SHARC
DSP
ADSP-21065L SRAM
2 MBit FLASH EPROM
8 MBit EPROM
FPGA CLOCK
60/30/20MHz Control-IO serial link RS 232 Power
Inverter Section
Analog & Digital
Signal Feedback PWM PWM signal PWM synchronisation SoC / SPARE / ADC clock (200 kHz) Service
PC SPORT 1 (serial port) SPORT 0 (serial port) Power
Monitor Reset PWM
generator IO-
controller ADC/DAC
Card Trigger /Reset /Interrupt Backplane D SUB 15 Control
System
(EPICS) optic FPGA fast optical input for Trigger /Reset /Interrupt DC DC other
DSP
Controller
Cards Analog Sig. JTAG digital Input / Output optic Timer
Slide11: Prototype of Digital PS for PLS EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN Filter IGBT driver DCCT Power Stack DSP RS232 ADC Optical fiber for EPICS interface .+/-100A
.DC 30V
Slide12: IOC control test EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN Fiber optics VIPC664
TM Digital PS IOC Test panel
Slide13: IOC and PS configuration EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN VME
CPU Carrier module TM module PS IP-A IP-B IP-C IP-D Optical fiber link MVME5110 VIPC664-TM Event trigger CH1 CH2 PS EVR
Slide14: Control hardware components EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN VIPC664-TM IP2 TM
Slide15: Step response test EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN 55.0A 55.0001 55.0002 +55.0003 55.0005 55.0004 55.0A Step response @55(A), 100uA step(1ppm) 1ppm @ full range V*10 is Amps
Slide16: Summary -The PLS orbit feedback operation is based on EPICS control system.
-CANbus IOC and control are working well without any problem
-Satisfactory result of prototype Digital controlled PS
-Next Digital PS will be operated for orbit feedback
-This high performance PS technology will be helpful for our new project, 4th generation PAL-XFEL EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN
Slide17: Overview EPICS Collaboration Meeting 2004 @ RICOTTI, Tokai, JAPAN PLS(Pohang Light Source) has successfully upgraded storage ring straight section 20bit power supplies and control system for global orbit feedback operation in collaboration with BESY-II.
Now we are looking for EPICS based fast control system and cost effective precise digital controlled power supply in collaboration with PSI and DIAMOND.
I will present the current status of PLS global orbit feedback system, and experimental results of 1ppm resolution digital controlled power supply for the next upgrade of PLS.