logging in or signing up 2 3Beijing handout Altoro Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 82 Category: News & Reports.. License: All Rights Reserved Like it (0) Dislike it (0) Added: September 27, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript STATUS OF IMPLEMENTATION ATRTH BEIJING: STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China 2003.91. Current status of the GTS links at RTH Beijing: 1. Current status of the GTS links at RTH Beijing1. Current status of the GTS links at RTH Beijing: 1. Current status of the GTS links at RTH Beijing2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing Front End for IP connections AlphaServer ES40 Duplicated system UNIX Back End AlphaServer 1000 Duplicated system VMS Front End for Non IP connections MIRA (4) VMS Offenbach Tokyo Seoul Hanoi Pyongyang Ulan Bator Moscow Bangkok New Delhi Asynchronous circuits X.25 circuits IP over FR MSS Current GTS system at RTH Beijing Cisco PIX Firewall RMDCN Routers Cisco 2620 (HSRP) GTS Router Cisco 3640 IP over FR2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing Current GTS system at RTH Beijing The back end hosts and the facilities for non IP connections started operation in 1992, partially upgraded in 1997, and will be replaced by new facilities early next year. The facilities for IP connections started operation in December 2001.2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing Offenbach Tokyo Seoul Hanoi Pyongyang Ulan Bator Moscow Bangkok New Delhi Asynchronous circuits X.25 circuits IP over FR New GTS system at RTH Beijing Cisco PIX Firewall RMDCN Routers Cisco 2620 (HSRP) GTS Router Cisco 3640 IP over FR Front End AlphaServer ES40 Duplicated system UNIX Back End Duplicated system UNIX based MSS Router Cisco PIX Firewall Web Server Internet DMZ2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing New GTS system at RTH Beijing X.25 circuits and asynchronous circuits connect to the new system via a multiprotocol router. Computer systems The front end and the back end are two separate systems. Each system is a duplicated system. UNIX based Application Software Front end collecting and transmitting data via GTS links. Supporting FTP, TCP sockets, X.25, Asynchronous Back end Checking, switching data Packaging messages and files Distributing data to the other internal operational systems, such as real-time database. Operational monitor system monitoring and managing the application system C/S based software running on Linux based PCs Internet Web Server Located in the DMZ of CMA’s Internet system providing read-time observations and CMA’s products to national and international users collecting meteorological data from other GTS centers by FTP and E-mail via Internet The new system will start operation in January 2004.3. Daily Traffic on the GTS links at RTH Beijing Beijing-Offenbach link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Offenbach link Offenbach to Beijing Beijing to Offenbach3. Daily Traffic on the GTS links at RTH Beijing Beijing-Tokyo link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Tokyo link Tokyo to Beijing Beijing to Tokyo3. Daily Traffic on the GTS links at RTH Beijing Beijing-Seoul link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Seoul link Seoul to Beijing Beijing to Seoul3. Daily Traffic on the GTS links at RTH Beijing Beijing-Moscow link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Moscow link Moscow to Beijing Beijing to Moscow3. Daily Traffic on the GTS links at RTH Beijing Beijing- Khabarovsk link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing- Khabarovsk link Khabarovsk to Beijing Beijing to Khabarovsk3. Daily Traffic on the GTS links at RTH Beijing Beijing- Bangkok link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing- Bangkok link Bangkok to Beijing Beijing to Bangkok3. Daily Traffic on the GTS links at RTH Beijing Beijing-New Delhi link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-New Delhi link New Delhi to Beijing Beijing to New Delhi3. Daily Traffic on the GTS links at RTH Beijing Beijing-Hanoi link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Hanoi link Hanoi to Beijing Beijing to Hanoi3. Daily Traffic on the GTS links at RTH Beijing Beijing-Pyongyang link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Pyongyang link Pyongyang to Beijing Beijing to Pyongyang3. Daily Traffic on the GTS links at RTH Beijing Beijing-Ulan Bator link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Ulan Bator link Ulan Bator to Beijing Beijing to Ulan Bator4. PCVSAT System: 4. PCVSAT System CMA’s VSAT-based distribution system Communication Satellite: AsiaSat 2 Area coverage: China, and South/East Asia Data rate: 2Mbps Supporting 256 logical channels Over 2200 remotes installed in China and some NMCs of neighboring countries. Pyongyang, May 2000 Ulan Bator, October 2001 Hanoi, August 2003 Via PCVSAT, Pyongyang, Ulan Bator, Hanoi can receive GTS data and RSMC Beijing products.4. PCVSAT System Daily broadcasting traffic on the channel to Hanoi: 4. PCVSAT System Daily broadcasting traffic on the channel to Hanoi4. PCVSAT System Daily broadcasting traffic on the channel to Pyongyang: 4. PCVSAT System Daily broadcasting traffic on the channel to Pyongyang4. PCVSAT System Daily broadcasting traffic on the channel to Ulan Bator: 4. PCVSAT System Daily broadcasting traffic on the channel to Ulan Bator5. Outage of the GTS links at RHT Beijing in 2003: 5. Outage of the GTS links at RHT Beijing in 2003Slide23: Thank you ! You do not have the permission to view this presentation. In order to view it, please contact the author of the presentation.
2 3Beijing handout Altoro Download Post to : URL : Related Presentations : Share Add to Flag Embed Email Send to Blogs and Networks Add to Channel Uploaded from authorPOINTLite Insert YouTube videos in PowerPont slides with aS Desktop Copy embed code: (To copy code, click on the text box) Embed: URL: Thumbnail: WordPress Embed Customize Embed The presentation is successfully added In Your Favorites. Views: 82 Category: News & Reports.. License: All Rights Reserved Like it (0) Dislike it (0) Added: September 27, 2007 This Presentation is Public Favorites: 0 Presentation Description No description available. Comments Posting comment... Premium member Presentation Transcript STATUS OF IMPLEMENTATION ATRTH BEIJING: STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China 2003.91. Current status of the GTS links at RTH Beijing: 1. Current status of the GTS links at RTH Beijing1. Current status of the GTS links at RTH Beijing: 1. Current status of the GTS links at RTH Beijing2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing Front End for IP connections AlphaServer ES40 Duplicated system UNIX Back End AlphaServer 1000 Duplicated system VMS Front End for Non IP connections MIRA (4) VMS Offenbach Tokyo Seoul Hanoi Pyongyang Ulan Bator Moscow Bangkok New Delhi Asynchronous circuits X.25 circuits IP over FR MSS Current GTS system at RTH Beijing Cisco PIX Firewall RMDCN Routers Cisco 2620 (HSRP) GTS Router Cisco 3640 IP over FR2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing Current GTS system at RTH Beijing The back end hosts and the facilities for non IP connections started operation in 1992, partially upgraded in 1997, and will be replaced by new facilities early next year. The facilities for IP connections started operation in December 2001.2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing Offenbach Tokyo Seoul Hanoi Pyongyang Ulan Bator Moscow Bangkok New Delhi Asynchronous circuits X.25 circuits IP over FR New GTS system at RTH Beijing Cisco PIX Firewall RMDCN Routers Cisco 2620 (HSRP) GTS Router Cisco 3640 IP over FR Front End AlphaServer ES40 Duplicated system UNIX Back End Duplicated system UNIX based MSS Router Cisco PIX Firewall Web Server Internet DMZ2. GTS system at RTH Beijing: 2. GTS system at RTH Beijing New GTS system at RTH Beijing X.25 circuits and asynchronous circuits connect to the new system via a multiprotocol router. Computer systems The front end and the back end are two separate systems. Each system is a duplicated system. UNIX based Application Software Front end collecting and transmitting data via GTS links. Supporting FTP, TCP sockets, X.25, Asynchronous Back end Checking, switching data Packaging messages and files Distributing data to the other internal operational systems, such as real-time database. Operational monitor system monitoring and managing the application system C/S based software running on Linux based PCs Internet Web Server Located in the DMZ of CMA’s Internet system providing read-time observations and CMA’s products to national and international users collecting meteorological data from other GTS centers by FTP and E-mail via Internet The new system will start operation in January 2004.3. Daily Traffic on the GTS links at RTH Beijing Beijing-Offenbach link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Offenbach link Offenbach to Beijing Beijing to Offenbach3. Daily Traffic on the GTS links at RTH Beijing Beijing-Tokyo link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Tokyo link Tokyo to Beijing Beijing to Tokyo3. Daily Traffic on the GTS links at RTH Beijing Beijing-Seoul link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Seoul link Seoul to Beijing Beijing to Seoul3. Daily Traffic on the GTS links at RTH Beijing Beijing-Moscow link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Moscow link Moscow to Beijing Beijing to Moscow3. Daily Traffic on the GTS links at RTH Beijing Beijing- Khabarovsk link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing- Khabarovsk link Khabarovsk to Beijing Beijing to Khabarovsk3. Daily Traffic on the GTS links at RTH Beijing Beijing- Bangkok link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing- Bangkok link Bangkok to Beijing Beijing to Bangkok3. Daily Traffic on the GTS links at RTH Beijing Beijing-New Delhi link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-New Delhi link New Delhi to Beijing Beijing to New Delhi3. Daily Traffic on the GTS links at RTH Beijing Beijing-Hanoi link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Hanoi link Hanoi to Beijing Beijing to Hanoi3. Daily Traffic on the GTS links at RTH Beijing Beijing-Pyongyang link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Pyongyang link Pyongyang to Beijing Beijing to Pyongyang3. Daily Traffic on the GTS links at RTH Beijing Beijing-Ulan Bator link: 3. Daily Traffic on the GTS links at RTH Beijing Beijing-Ulan Bator link Ulan Bator to Beijing Beijing to Ulan Bator4. PCVSAT System: 4. PCVSAT System CMA’s VSAT-based distribution system Communication Satellite: AsiaSat 2 Area coverage: China, and South/East Asia Data rate: 2Mbps Supporting 256 logical channels Over 2200 remotes installed in China and some NMCs of neighboring countries. Pyongyang, May 2000 Ulan Bator, October 2001 Hanoi, August 2003 Via PCVSAT, Pyongyang, Ulan Bator, Hanoi can receive GTS data and RSMC Beijing products.4. PCVSAT System Daily broadcasting traffic on the channel to Hanoi: 4. PCVSAT System Daily broadcasting traffic on the channel to Hanoi4. PCVSAT System Daily broadcasting traffic on the channel to Pyongyang: 4. PCVSAT System Daily broadcasting traffic on the channel to Pyongyang4. PCVSAT System Daily broadcasting traffic on the channel to Ulan Bator: 4. PCVSAT System Daily broadcasting traffic on the channel to Ulan Bator5. Outage of the GTS links at RHT Beijing in 2003: 5. Outage of the GTS links at RHT Beijing in 2003Slide23: Thank you !